KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  2-11-2020
Number of Hours:  4.25
Manual Reference:  
Brief Description:  Updated Avionics Software. Started Calibration.

Installed temporary weatherstripping on right door opening. Used marine weatherstripping medium size from Home Depot and applied to the door opening rather than the door. Will eventually install the McMaster Carr weatherstripping used by many other RV-10 builders when I have time to modify the fiberglass door opening.

Installed the latest software for both the G3X and the GTN 650 avionics systems. Installed the engraved switch caps on all rocker switches. Started calibration of the avionics systems and trouble shooting of errors.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.