KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  3-5-2020
Number of Hours:  6.25
Manual Reference:  
Brief Description:  Installed covers & console. Changed Fuel Valve Po

Installed tunnel covers and flap actuator covers. Installed the center console.

Attempted to install the fuel selector handle but found that the shaft was too short. Plans 37-7 Step 4 says to adjust vertical position by removing washers between fuel valve and valve bracket. ARRG!
Had to remove the console, tunnel cover over heater hose, and cover with throttle quadrant attached in order to access the valve bolts. With great difficulty, removed both AN960-416 washers from each of the 2 bolts, leaving a single AN960-416L washer on each bolt between the valve and bracket. (Had to work from the top and from below through the side access hole in the tunnel. Had to remove the rear heater SCAT tubing from the heater discharge T. Reassembled fuel valve with bolts. Reattached heater SCAT tubing and re-bonded the SCAT tubing to center spar with RTV.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.