KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  5-8-2017
Number of Hours:  1.75
Manual Reference:  
Brief Description:  Painting Canopy Inside

Sanded and applied an additional coat of paint to the top canopy inside.

Prepared the baggage bulkhead top sheet metal for painting.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.