Date
  | 
	Hours
  | 
	Work Log Summary 
		 
  | 
	Details 
		 
  | 
	
		
	
	 12-28-2013
  | 
	2.00
  | 
	DAR N913BC APPROVAL
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-26-2013
  | 
	1.50
  | 
	Completed prep for inspection
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-25-2013
  | 
	2.50
  | 
	Repaired cowl
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-23-2013
  | 
	2.00
  | 
	Prep for inspection.  Fuel tank removal.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-15-2013
  | 
	1.00
  | 
	Performed another fuel flow test
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-15-2013
  | 
	2.50
  | 
	Misc Final PA items
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-08-2013
  | 
	2.00
  | 
	Balanced carbs
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-07-2013
  | 
	1.50
  | 
	Repitched prop and began carb sync
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 12-01-2013
  | 
	1.00
  | 
	Ran engine, check ignition modules
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-01-2013
  | 
	2.50
  | 
	Calibrated Fuel System
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-24-2013
  | 
	1.00
  | 
	Completed weighing aircraft
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-23-2013
  | 
	3.00
  | 
	Attached fairings, cowl and began W&B
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-17-2013
  | 
	6.00
  | 
	Worked on items to get ready for weight and balanc
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-11-2013
  | 
	3.00
  | 
	Installed interior carpet, sidewalls
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-10-2013
  | 
	5.00
  | 
	Began installing interior kit in order to do weigh
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-09-2013
  | 
	4.50
  | 
	Ran Engine, began other tests
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-29-2013
  | 
	2.00
  | 
	Oil purged engne
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-26-2013
  | 
	3.00
  | 
	Test run engine 3X
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-26-2013
  | 
	2.50
  | 
	Finished tidying up hanger
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-26-2013
  | 
	2.00
  | 
	Adjusted right stabilator aft skin to better align
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-25-2013
  | 
	0.25
  | 
	Reinstalled Wings after panels, seatbelts attached
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-25-2013
  | 
	2.50
  | 
	Moved Hanger
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-25-2013
  | 
	4.00
  | 
	Installed center channel panel and seat belts
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 10-21-2013
  | 
	1.00
  | 
	Checked rocker arms after engine test run
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-20-2013
  | 
	2.50
  | 
	Test Run Engine
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-20-2013
  | 
	3.00
  | 
	Fabricated tool for propeller pitch measures
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-19-2013
  | 
	1.50
  | 
	Added coolant and air filters to engine
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-06-2013
  | 
	4.50
  | 
	Fuel System Test
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-06-2013
  | 
	0.50
  | 
	AST alignment
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-29-2013
  | 
	1.00
  | 
	Reinstalled the upper fuselage
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-29-2013
  | 
	1.50
  | 
	Rechecked torques, spark plug gaps
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-29-2013
  | 
	2.00
  | 
	Added FTS and installed fuel filler tube
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-29-2013
  | 
	0.50
  | 
	Added FTC to firewall wire opening
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-28-2013
  | 
	5.00
  | 
	
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-27-2013
  | 
	1.50
  | 
	Reinstalled ELT to aircraft and tested
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-22-2013
  | 
	3.00
  | 
	Trimmed flapperons and wing skins
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-15-2013
  | 
	1.25
  | 
	Purged oil into engine
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-15-2013
  | 
	2.50
  | 
	Bled brake lines
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-14-2013
  | 
	3.25
  | 
	Updated S/W and other misc steps
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-02-2013
  | 
	0.50
  | 
	Loaded latest S/W and began configuration
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 09-02-2013
  | 
	2.00
  | 
	Began to add warnings & placards to aircraft
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-02-2013
  | 
	1.00
  | 
	Attached spinner, cleaned up hanger took pictures
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 08-30-2013
  | 
	0.25
  | 
	Temp Wired Oil Cooler to engine for test firing.
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 08-30-2013
  | 
	3.00
  | 
	Installed rear window into aircraft
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-30-2013
  | 
	0.25
  | 
	Completed SB 13-08-08
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-30-2013
  | 
	0.75
  | 
	Added air to tires and cleaned up shop
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 08-18-2013
  | 
	3.00
  | 
	Reattached turtle deck window to the fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-17-2013
  | 
	2.00
  | 
	Removed vinyl from fuselage
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-10-2013
  | 
	3.75
  | 
	Installed flaperon control hardware
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-10-2013
  | 
	0.50
  | 
	Corrected connector wiring for the pulse lighting
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-10-2013
  | 
	1.50
  | 
	Began to remove turtle deck window
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 08-09-2013
  | 
	3.50
  | 
	Matched drilled flaperon torque tubes
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-28-2013
  | 
	1.00
  | 
	Misc work in hanger
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-28-2013
  | 
	1.50
  | 
	Completed stabilator cable install
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-28-2013
  | 
	0.50
  | 
	Attached flapperons to wings
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-27-2013
  | 
	4.00
  | 
	Fit wings and temporarily installed them
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-26-2013
  | 
	3.00
  | 
	Installed stabilator cables
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-14-2013
  | 
	1.00
  | 
	Finished AST assemblies install and trim servo att
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-13-2013
  | 
	0.75
  | 
	Rudder fully installed with cables
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-13-2013
  | 
	1.50
  | 
	Installed stabilator to tailcone.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-13-2013
  | 
	1.00
  | 
	Installed Control Horns & Counter balance to stabi
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 07-13-2013
  | 
	0.75
  | 
	Finished attachment of rudder to aircraft
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 07-12-2013
  | 
	1.00
  | 
	Reattached spinner and propeller
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 07-12-2013
  | 
	1.00
  | 
	Attached V-stabilator to aircraft
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 07-07-2013
  | 
	2.50
  | 
	Finished fabrication of spacer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-06-2013
  | 
	2.50
  | 
	Began fabrication of propeller spacer
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-05-2013
  | 
	1.00
  | 
	Removed propeller spinner from aircraft
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-05-2013
  | 
	2.50
  | 
	Organized and cleaned hanger
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 07-04-2013
  | 
	1.00
  | 
	Began organizing hanger
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-29-2013
  | 
	4.00
  | 
	Moved fuselage to Hanger
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-25-2013
  | 
	1.50
  | 
	Fabricated wood frame chocks for aircraft move
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 06-24-2013
  | 
	1.50
  | 
	Sanded aft edge of spinner
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-21-2013
  | 
	1.00
  | 
	Began sanding spinner backplate
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-17-2013
  | 
	1.50
  | 
	Reinstalled pushrods
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-15-2013
  | 
	1.50
  | 
	Installed tubing for AOA option later
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-15-2013
  | 
	3.00
  | 
	Installed most of throttle and choke cables
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-15-2013
  | 
	1.00
  | 
	Begain reinstalling h/w to center channel per plan
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 06-15-2013
  | 
	0.50
  | 
	Added tie wraps to antenna cable in tail
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-14-2013
  | 
	2.50
  | 
	Installed most of ADS-B antenna in tailcone
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-13-2013
  | 
	2.00
  | 
	Removed center channel hardware
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-11-2013
  | 
	1.50
  | 
	Re-attached rudder petals and wire guard
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-10-2013
  | 
	1.75
  | 
	Removed Rudder Petals, fed antenna cable
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-09-2013
  | 
	1.50
  | 
	Installed Blasttube and Regulator Cooling Shroud
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-09-2013
  | 
	2.00
  | 
	Finished install of oil cooler and repaired sensor
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-08-2013
  | 
	1.00
  | 
	Installed oil hoses up to step 6.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-08-2013
  | 
	0.25
  | 
	Epoxy glued lable to inside of lower cowl
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-08-2013
  | 
	1.50
  | 
	Added seals to cowl vent
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-07-2013
  | 
	2.50
  | 
	Wet sanded cowl and removed tape
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-07-2013
  | 
	1.00
  | 
	Added epoxy/flox to lower cowl gap
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-04-2013
  | 
	2.50
  | 
	Moved wings from storage to Hanger
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-02-2013
  | 
	0.25
  | 
	Primed / debured / painted F-00002 Cooling Shroud
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 06-02-2013
  | 
	1.50
  | 
	Moved tail parts to rented hanger
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-02-2013
  | 
	2.00
  | 
	Epoxy/floxed cooling and interface ducts to cowl
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-01-2013
  | 
	4.50
  | 
	Fit the cooling duct to the lower cowl
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-01-2013
  | 
	1.00
  | 
	Cut tailpipe
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-31-2013
  | 
	2.50
  | 
	Installed oil cooler to cooler duct
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-30-2013
  | 
	3.00
  | 
	Completed install of heater door control cable
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-29-2013
  | 
	1.50
  | 
	Began installing heater door control cable
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-28-2013
  | 
	2.00
  | 
	Installed heat exchanger and hoses
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-26-2013
  | 
	1.25
  | 
	Completed oil cooler assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-25-2013
  | 
	5.00
  | 
	Installed overflow bottle and began working on coo
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-24-2013
  | 
	6.00
  | 
	Installed cooling door and oil tank
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-22-2013
  | 
	0.50
  | 
	Installed springs into coolant hoses
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-22-2013
  | 
	1.00
  | 
	Installed EGT probes
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-21-2013
  | 
	2.50
  | 
	Completed most of muffler install
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-19-2013
  | 
	0.50
  | 
	Installed ADS-B box and brackets to SL40 rack
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-18-2013
  | 
	3.00
  | 
	Completed spinner install
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-16-2013
  | 
	2.00
  | 
	Fabricated and primed back plates for spinner
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 05-14-2013
  | 
	2.00
  | 
	Aligned spinner and fabricated gap fillers
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-13-2013
  | 
	2.00
  | 
	Attached Hub and Propeller
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-12-2013
  | 
	1.50
  | 
	Organized tools and cleaned up workshop
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 05-12-2013
  | 
	2.00
  | 
	Completed prep of the spinner
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-12-2013
  | 
	1.50
  | 
	Cleaned up workshop and organized tools
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 05-11-2013
  | 
	0.50
  | 
	Replaced exisiting oil fitting with new one
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-11-2013
  | 
	25.00
  | 
	Completed install of the pitot tube
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-10-2013
  | 
	1.00
  | 
	Installed Fuel Drain tube and hose to engine
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-07-2013
  | 
	2.50
  | 
	Added additional electical connections to engine
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-06-2013
  | 
	2.50
  | 
	Began connecting fuel lines & wiring to engine
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-05-2013
  | 
	2.00
  | 
	Mounted Engine
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-05-2013
  | 
	3.50
  | 
	Finished stiffener install.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-05-2013
  | 
	1.00
  | 
	Began working on ADS-B install
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-04-2013
  | 
	1.00
  | 
	Riveted firwall brace and cut F-1202N-R & L
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-03-2013
  | 
	1.00
  | 
	Match drilled firewall brace
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-02-2013
  | 
	2.75
  | 
	Began Stiffener Retrofit install
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-01-2013
  | 
	0.75
  | 
	Inventoried ADS-B Kit from Vans
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-01-2013
  | 
	1.50
  | 
	Installed chain hoist in garage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-29-2013
  | 
	1.50
  | 
	Sanded and final epoxed the canopy fairing.
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 04-29-2013
  | 
	0.25
  | 
	Completed step and read ahead in plans
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 04-28-2013
  | 
	1.00
  | 
	Sanded fairings and put them in temp storage
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 04-28-2013
  | 
	1.50
  | 
	Sanded and added another coat of epoxy
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-28-2013
  | 
	0.50
  | 
	Installed WH-RV12 Ignition Harness to modules
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-28-2013
  | 
	0.45
  | 
	Drilled 3/8" hole in both gas struts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-26-2013
  | 
	1.00
  | 
	Removed wheel fairings
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-23-2013
  | 
	1.50
  | 
	Clamp block assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-22-2013
  | 
	1.25
  | 
	Installed L & R Drip Pans under carburetor
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-21-2013
  | 
	2.50
  | 
	Rotated headset Jacks from L to R
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-21-2013
  | 
	0.50
  | 
	Installed Oil Tank Mount Bracket
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-21-2013
  | 
	2.00
  | 
	Drilled holes in lower firewall for the engine att
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-20-2013
  | 
	1.25
  | 
	Installed Manifolds and attached ignition module
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-18-2013
  | 
	0.25
  | 
	Worked on avionics control module
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-18-2013
  | 
	0.50
  | 
	Began prep on oil tank brace
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-18-2013
  | 
	1.25
  | 
	Added RTV to cooling shroud and reattached cooling
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-14-2013
  | 
	4.00
  | 
	Worked on fine tuning Skyview adjustments
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-14-2013
  | 
	2.50
  | 
	Completed more engine prep
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-13-2013
  | 
	3.00
  | 
	Trim speed adjustment and began working on Skyview
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-13-2013
  | 
	0.25
  | 
	Removed crackcase allen screw
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-13-2013
  | 
	0.75
  | 
	Finished fitting shroud and removed coolant hoses
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-10-2013
  | 
	0.75
  | 
	Installed replacement starter relay
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-10-2013
  | 
	1.50
  | 
	Completed fitting of cooling shroud
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-08-2013
  | 
	2.75
  | 
	Continued to work on engine
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-08-2013
  | 
	0.25
  | 
	Another coat on part of canopy
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-07-2013
  | 
	1.50
  | 
	Removed several items from engine per plans
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-07-2013
  | 
	1.00
  | 
	Prepared canopy for another coat of black epoxy
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-06-2013
  | 
	2.50
  | 
	Began working on Rotax engine
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-03-2013
  | 
	3.00
  | 
	Installed various wire connectors in firewall area
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-02-2013
  | 
	2.75
  | 
	Installed several firewall forward wire harnesses
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-01-2013
  | 
	3.00
  | 
	Begain installing firewall wiring
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-31-2013
  | 
	1.00
  | 
	Inventoried and partially fabricated towbar
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-31-2013
  | 
	5.00
  | 
	Finished inventory of the engine kit
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-30-2013
  | 
	0.45
  | 
	Continued unpacking engine kit crate
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-29-2013
  | 
	1.50
  | 
	Began unpacking engine kit crate
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-20-2013
  | 
	1.50
  | 
	Sanded canopy to prep for next epoxy coat
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 03-17-2013
  | 
	3.50
  | 
	Installed ELT into fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-17-2013
  | 
	1.50
  | 
	Installed ADHRS to tailcone bracket
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-17-2013
  | 
	1.50
  | 
	Cleared around shop and vaccumed interior of fusel
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 03-13-2013
  | 
	1.50
  | 
	Misc
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-12-2013
  | 
	2.00
  | 
	Installed the GPS antenna
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-11-2013
  | 
	1.50
  | 
	Installed battery into ELT interior warning
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-10-2013
  | 
	3.00
  | 
	Partially installed ELT H/W
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-09-2013
  | 
	5.00
  | 
	Installed most of SkyView Avionics
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-07-2013
  | 
	3.00
  | 
	Began installing Avionics
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-06-2013
  | 
	2.00
  | 
	Inventory of Avionics Shipment
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-24-2013
  | 
	0.50
  | 
	Drilled out and epoxyed right side fairing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-24-2013
  | 
	2.50
  | 
	Applied fuel tank sealant to firewall
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-24-2013
  | 
	0.50
  | 
	Adjusted fit of left fairing front/rear halves
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 02-09-2013
  | 
	4.00
  | 
	Completed Installation of Main Wheel Fairings
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-02-2013
  | 
	4.00
  | 
	Trimmed and attached both main wheel fairings
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-30-2013
  | 
	1.25
  | 
	Attached Right Wheel Fairing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-20-2013
  | 
	2.00
  | 
	Fit left wheel pant to gear leg
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-17-2013
  | 
	3.00
  | 
	Installed brake lines along gear legs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-10-2013
  | 
	0.00
  | 
	Purchased tool bench
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-07-2013
  | 
	1.50
  | 
	Torqued all the center channel bolts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-06-2013
  | 
	5.00
  | 
	Re-attached main gear legs to center fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-30-2012
  | 
	3.75
  | 
	Match drilled outboard attach wear plates
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-29-2012
  | 
	3.25
  | 
	Added bevels to U-1202 and deburred U-1202C/D wear
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-28-2012
  | 
	4.50
  | 
	Riveted brackets & skin doublers to fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-26-2012
  | 
	5.75
  | 
	Completed steps 21 to 29
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-25-2012
  | 
	2.00
  | 
	Completed steps 13-20
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-24-2012
  | 
	1.00
  | 
	Completed Step 12
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-21-2012
  | 
	0.50
  | 
	Tapped main gear fairing attach plates
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 12-21-2012
  | 
	0.50
  | 
	Misc. shop cleanup
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 12-21-2012
  | 
	2.50
  | 
	Finalized canopy install
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-21-2012
  | 
	1.50
  | 
	Began work on SB 12-11-09
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-20-2012
  | 
	6.50
  | 
	Completed Nose Wheel Fairing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-18-2012
  | 
	3.00
  | 
	Additional work on nose wheel fairing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-17-2012
  | 
	1.50
  | 
	Riveted nose wheel fairing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-17-2012
  | 
	1.00
  | 
	Inventoried SB parts for side skin stiffening
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-16-2012
  | 
	2.25
  | 
	Epoxy and riveted splice strip to nose wheel fairi
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-16-2012
  | 
	1.00
  | 
	Began work on hinge for gear leg fairing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-16-2012
  | 
	2.75
  | 
	Added H/W to nose fork and fitted nose leg fairing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-15-2012
  | 
	2.25
  | 
	Fitted nose wheel fairing halves and worked on spl
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-13-2012
  | 
	2.00
  | 
	Wet and dry sanded fairing - removed tape
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-10-2012
  | 
	1.50
  | 
	Added epoxy coat to fairing
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 12-09-2012
  | 
	3.50
  | 
	Trimmed, sanded and fitting of nose wheel fairing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-09-2012
  | 
	1.25
  | 
	Filled canopy attach holes with epoxy/flox
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-08-2012
  | 
	0.50
  | 
	Workshop Cleanup
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 12-08-2012
  | 
	4.50
  | 
	Trimmed Canopy Fairing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-04-2012
  | 
	1.00
  | 
	Sanded and added another epoxy coat
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 12-04-2012
  | 
	1.50
  | 
	Added nutplates to wheel pant brackets
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-30-2012
  | 
	1.50
  | 
	Sanded and added another epoxy coat
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 11-28-2012
  | 
	1.50
  | 
	Sanded then added epoxy layer to fairing
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-24-2012
  | 
	2.50
  | 
	Sanded fairing and added epoxy/micro balloon mixtu
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-24-2012
  | 
	3.25
  | 
	Continued to work on main wheel pants
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-22-2012
  | 
	2.00
  | 
	Began work on wheel fairings
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-22-2012
  | 
	0.25
  | 
	Added more epoxy to aft edge of canopy
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-21-2012
  | 
	2.50
  | 
	Sanded and added epoxy coat to fairing
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-11-2012
  | 
	1.00
  | 
	Sanded canopy fairing
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 11-03-2012
  | 
	3.50
  | 
	Layup of top fairing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-29-2012
  | 
	1.50
  | 
	Light sanding of first stage of fairing layup
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-28-2012
  | 
	3.25
  | 
	Began layup of canopy fairing left and right sides
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-25-2012
  | 
	1.00
  | 
	Cut glass for side fairings
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-24-2012
  | 
	1.25
  | 
	Final Fairing Surface Prep
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-23-2012
  | 
	1.50
  | 
	Sanded fairing foam and taped template outline
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-21-2012
  | 
	1.25
  | 
	Expoxy glued foam fillers to L/R canopy frame
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-21-2012
  | 
	1.75
  | 
	Cut glass strips and other canopy fairing prep
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-17-2012
  | 
	1.25
  | 
	Canopy foam prep and fitting
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-14-2012
  | 
	0.50
  | 
	Shop cleanup
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 10-14-2012
  | 
	1.50
  | 
	Finished install of rudder petal hardware
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-14-2012
  | 
	1.25
  | 
	Began work on canopy skirt
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-13-2012
  | 
	3.75
  | 
	Fit and installed rudder cables
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-07-2012
  | 
	1.00
  | 
	Installed pulleys for stabiliator cables
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-07-2012
  | 
	4.00
  | 
	Install rudder cable & built rigging stop
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-02-2012
  | 
	0.50
  | 
	Removed cowl and tapped remaining nutplates
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-02-2012
  | 
	1.50
  | 
	Organized parts for control parts install
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-01-2012
  | 
	0.25
  | 
	Drilled trim servo linkage hole into lower tailcon
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 10-01-2012
  | 
	2.00
  | 
	Completed oil door assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-30-2012
  | 
	5.75
  | 
	Mostly completed tailcone fairing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-29-2012
  | 
	0.50
  | 
	Temporarily added V.stab to the tailcone
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-29-2012
  | 
	2.50
  | 
	Riveted nutplates and cut lower fairing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-29-2012
  | 
	1.75
  | 
	Countersunk tabs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-28-2012
  | 
	1.50
  | 
	Match drilled tabs to fairing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-27-2012
  | 
	0.50
  | 
	Riveted bottom flange of F-1211 to tailcone skins
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 09-27-2012
  | 
	1.50
  | 
	Attach fitting of tail fairing to tailcone
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-25-2012
  | 
	1.50
  | 
	Unpacked seats/interior kit
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-25-2012
  | 
	0.50
  | 
	Reinstalled top cowl
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-24-2012
  | 
	1.50
  | 
	Installed close out door
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-24-2012
  | 
	1.00
  | 
	Cut oil door opening
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-23-2012
  | 
	1.00
  | 
	Misc workshop cleanup and organizing
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 09-23-2012
  | 
	3.00
  | 
	Countersinking then hinge riveting to cowls
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-23-2012
  | 
	1.50
  | 
	Added nutplates to front of lower cowl.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-22-2012
  | 
	5.00
  | 
	Cowl hinge drilling and fitting onto fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-22-2012
  | 
	1.50
  | 
	Countersinking of cowl #40 holes
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-20-2012
  | 
	2.50
  | 
	Fit Lower Cowl to Fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-18-2012
  | 
	2.00
  | 
	Fabricated and marked cowl hinges
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-15-2012
  | 
	1.50
  | 
	Riveted canopy skirt to canopy
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-15-2012
  | 
	1.50
  | 
	Installed D-Handle to canopy frame
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-15-2012
  | 
	1.50
  | 
	Fabricated hinges and bent hinge pins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-15-2012
  | 
	1.00
  | 
	Added C-1214 Latch Block and trimmed it
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-14-2012
  | 
	4.00
  | 
	Attached canopy to frame
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-13-2012
  | 
	1.50
  | 
	Cowl trimming and work on hinge pins
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-12-2012
  | 
	2.00
  | 
	More upper/lower cowl sanding
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-11-2012
  | 
	2.00
  | 
	Began sanding the cowl pieces
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-10-2012
  | 
	1.50
  | 
	Began cowl trim and sanding
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-08-2012
  | 
	0.30
  | 
	Replaced Forward Upper Fuse Skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-08-2012
  | 
	0.25
  | 
	More tank painting
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-08-2012
  | 
	0.75
  | 
	Attached guide blocks to roll bar
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-08-2012
  | 
	0.50
  | 
	8/31/12 NOTIFICATION
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-06-2012
  | 
	0.75
  | 
	Fabricated two guide blocks for canopy frame
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-06-2012
  | 
	1.00
  | 
	Added sealant to canopy rib assembly
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-06-2012
  | 
	0.25
  | 
	Added finish paint to parts of tank and fill tube
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-05-2012
  | 
	0.75
  | 
	Primed exterior of fuel tank
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-05-2012
  | 
	1.25
  | 
	Fabricated L/R latch handles for canopy frame
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-03-2012
  | 
	5.00
  | 
	Completed Canopy Fitting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-03-2012
  | 
	1.00
  | 
	Cleaned and organized workshop
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 09-02-2012
  | 
	6.50
  | 
	Fit canopy to frame
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-01-2012
  | 
	0.45
  | 
	Resinstalled back window to fuselage
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-01-2012
  | 
	0.50
  | 
	Placed canopy onto the canopy frame/fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-01-2012
  | 
	3.75
  | 
	Installed canopy onto fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-01-2012
  | 
	1.00
  | 
	Began pressure test on fuel tank
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-31-2012
  | 
	1.50
  | 
	Moved aircraft across garage
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-31-2012
  | 
	2.00
  | 
	Installed tunnel access brackets
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-31-2012
  | 
	0.50
  | 
	Did more access panel priming
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-31-2012
  | 
	2.00
  | 
	Began working on canopy frame
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-27-2012
  | 
	1.50
  | 
	Workshop cleanup misc activites
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-26-2012
  | 
	1.50
  | 
	Temp install of tank into fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-26-2012
  | 
	3.00
  | 
	Finished assembly of fuel tank
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-25-2012
  | 
	2.00
  | 
	Installed fuel window.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-25-2012
  | 
	1.00
  | 
	Fitted Fuel Float arm to tank
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-19-2012
  | 
	1.50
  | 
	Misc deburring and priming of covers ect...
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-19-2012
  | 
	2.50
  | 
	Additional Fuel Tank Sealing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-18-2012
  | 
	2.50
  | 
	Sanded and cut tail cone fairings
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-18-2012
  | 
	3.75
  | 
	First round of tank sealing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-18-2012
  | 
	0.50
  | 
	Began prep for tank sealing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-17-2012
  | 
	1.50
  | 
	Preparation and deburing of alum. parts
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-17-2012
  | 
	1.50
  | 
	Additional prep of tank parts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-16-2012
  | 
	3.00
  | 
	Assembled, match drilled and deburred tank
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-13-2012
  | 
	1.75
  | 
	Deburred, Primed Fuel Tank Parts
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-12-2012
  | 
	1.50
  | 
	Tapped roll bar for Aft Window screws
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-12-2012
  | 
	1.00
  | 
	Fabricated Brake Lines
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-12-2012
  | 
	3.00
  | 
	Began Fabricating Fuel Tank
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-11-2012
  | 
	3.00
  | 
	Completed Aft Window preparation
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-10-2012
  | 
	1.50
  | 
	Match Drilled Aft Window to Roll Bar
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-09-2012
  | 
	2.00
  | 
	Clecoed Turtle Decks & Aft Window to Fuse
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-08-2012
  | 
	0.50
  | 
	Tested trim tab wires and finished harness
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-08-2012
  | 
	1.00
  | 
	Began to unpacked Seats / Interior Kit
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-06-2012
  | 
	0.50
  | 
	Riveted nutplates to fork for nose fairing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-06-2012
  | 
	2.00
  | 
	Installed nose wheel to aircraft
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-05-2012
  | 
	2.50
  | 
	Packed bearings and installed wheels
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-05-2012
  | 
	1.00
  | 
	Installed Axels to Main Gear legs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-05-2012
  | 
	3.00
  | 
	Began install of nose gear
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-04-2012
  | 
	6.00
  | 
	Installed both main gear legs to fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-04-2012
  | 
	2.00
  | 
	Installed & inflated tubes in main wheels
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-03-2012
  | 
	2.00
  | 
	Worked on nose and main wheels
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-03-2012
  | 
	1.00
  | 
	Installed Engine Mount Standoff
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-02-2012
  | 
	1.50
  | 
	Riveted Detent Bracket Assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-01-2012
  | 
	1.50
  | 
	Flap Handle and F-1261 spacers
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-01-2012
  | 
	0.25
  | 
	Attached Pitch Servo Push Rod
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-30-2012
  | 
	0.50
  | 
	Roll Servo Push Rod
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-30-2012
  | 
	1.75
  | 
	Flaperon Push Rods and torque arms
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-29-2012
  | 
	2.00
  | 
	Contructed both Flapperon Push Rods
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-29-2012
  | 
	1.00
  | 
	Completed install of control stick h/w
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-28-2012
  | 
	2.00
  | 
	Installed control stick hardware
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-27-2012
  | 
	1.50
  | 
	Tailcone ADAHRS D Sub connector & OAT, pitot tube
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-27-2012
  | 
	0.75
  | 
	Installed noise filter zip ties/RTV to fuel pump a
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-27-2012
  | 
	0.75
  | 
	Installed noise filter to left strobe wing connect
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-27-2012
  | 
	2.00
  | 
	Installed flapperon mixer and flap handle to fusel
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-27-2012
  | 
	1.00
  | 
	Fed aft pitot line & trim control line through fus
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-27-2012
  | 
	1.00
  | 
	Added tops to control system blocks with washers/n
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 07-26-2012
  | 
	4.50
  | 
	Riveted Tailcone to Fuselage
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-19-2012
  | 
	1.50
  | 
	Attached tailcone
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-18-2012
  | 
	1.25
  | 
	Additional control rod fabrication
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-17-2012
  | 
	2.00
  | 
	Fabrication of more control system parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-15-2012
  | 
	1.00
  | 
	Primed and prepared parts for tailcone/flapperon c
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-15-2012
  | 
	1.00
  | 
	Control Mod Attach & Vent. Holes
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-14-2012
  | 
	1.00
  | 
	Installed Outside Temp Probe and wiring
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 07-14-2012
  | 
	1.50
  | 
	Installed most of Wing/Fuse Connectors
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-14-2012
  | 
	1.50
  | 
	Installed Headphone Jacks
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-14-2012
  | 
	1.50
  | 
	Installed brake clamp & prepared parts
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-14-2012
  | 
	1.00
  | 
	Finished wiring install of PTT for Control Sticks
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-13-2012
  | 
	1.50
  | 
	Installed Ray Allen PTT & Grips
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-13-2012
  | 
	0.50
  | 
	Installed Over Rudder Wireway
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-10-2012
  | 
	0.50
  | 
	Worked on wire flange prep
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 07-10-2012
  | 
	1.50
  | 
	Installed Rudder Petals into Fuselage
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-10-2012
  | 
	0.50
  | 
	Attached brake reservoir
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-09-2012
  | 
	2.00
  | 
	Misc Fuse Wiring additions
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-07-2012
  | 
	2.00
  | 
	Wire Harness 00045 & misc installations.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-07-2012
  | 
	1.50
  | 
	Installed Cockpit Light
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-07-2012
  | 
	2.00
  | 
	Additional AP servo wiring
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-06-2012
  | 
	3.50
  | 
	Worked on control sticks.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-05-2012
  | 
	4.50
  | 
	Wiring and spar pin switch testing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-05-2012
  | 
	1.50
  | 
	Fabricated the Fuselage Pin Assembly
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-04-2012
  | 
	3.00
  | 
	Installed fans & WH-00046 Wire Bundle
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-03-2012
  | 
	1.75
  | 
	Began Finish Kit Build
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-02-2012
  | 
	2.50
  | 
	Finished Finish Kit Inventory
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-01-2012
  | 
	3.00
  | 
	Continued Hardware Inventory
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-30-2012
  | 
	5.00
  | 
	Unpacked Finish Kit
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-16-2012
  | 
	1.00
  | 
	Finished install of roll/pitch servos to fuselage
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-11-2012
  | 
	2.00
  | 
	Prepared wiring and temp install pitch servo
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-10-2012
  | 
	2.50
  | 
	Wing Electical Brackets
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-10-2012
  | 
	2.50
  | 
	Autopilot servo assemblies
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-25-2012
  | 
	2.50
  | 
	Completed Map Box Assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-24-2012
  | 
	0.25
  | 
	Sealed WD-1233 L/R Steps
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-24-2012
  | 
	0.75
  | 
	Riveted hardware to panels
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-24-2012
  | 
	1.75
  | 
	Misc Tailcone attach section steps
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-22-2012
  | 
	2.00
  | 
	Additional Panel Section prep
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-20-2012
  | 
	5.00
  | 
	Panel Attach Strips and Began Map Box
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-19-2012
  | 
	3.00
  | 
	Oil Tank Braces and Upper Fuse Skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-17-2012
  | 
	1.50
  | 
	Riveted Panel Base to Fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-17-2012
  | 
	0.75
  | 
	Match Drilled Upper Firewall per template
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-16-2012
  | 
	1.00
  | 
	Drilled changes to Panel Base for Skyview
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-16-2012
  | 
	1.50
  | 
	Added nutplates to Panel Flange
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-15-2012
  | 
	2.00
  | 
	Additional work on Panel Base and related parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-14-2012
  | 
	2.50
  | 
	Continued work on upper fuselage parts prep
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-13-2012
  | 
	4.50
  | 
	Additonal work on upper fuselage parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-12-2012
  | 
	0.50
  | 
	Painted oil tank braces with red enamal
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 05-11-2012
  | 
	2.50
  | 
	Further preparation of upper fuse parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-10-2012
  | 
	3.00
  | 
	Began working on Upper Fuse parts for panel
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-08-2012
  | 
	2.75
  | 
	Attached F-1201A assembly to fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-07-2012
  | 
	2.50
  | 
	Re-fabricated hinges for doubler.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-06-2012
  | 
	2.75
  | 
	Match drilled piano hinges
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-05-2012
  | 
	1.50
  | 
	Final riveted baggage assembly to fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-05-2012
  | 
	0.50
  | 
	Fabricated wires for seat attachments
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 05-05-2012
  | 
	3.00
  | 
	Began working on upper forward fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-03-2012
  | 
	0.50
  | 
	Riveted ADAHRS brackets
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-03-2012
  | 
	2.50
  | 
	Assembled the baggage bulkhead
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-02-2012
  | 
	1.00
  | 
	Updated static system lines for Skyview
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-02-2012
  | 
	1.50
  | 
	Match drilled shear clips to Baggage Bulkheads
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-01-2012
  | 
	2.75
  | 
	Completed Sect 28 Fuel System
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-30-2012
  | 
	2.25
  | 
	Completed aft fuel return line
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-29-2012
  | 
	4.75
  | 
	Completed the 3/8" fuel lines
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-28-2012
  | 
	2.50
  | 
	Began fabrication of fuel system
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-22-2012
  | 
	4.50
  | 
	Finished assembly of rudder petals and brakes
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-21-2012
  | 
	4.75
  | 
	Began assembly of Rudder Petals & Brakes
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-20-2012
  | 
	2.00
  | 
	Riveted Seat Backs and Painted
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-20-2012
  | 
	1.50
  | 
	Final riveted roll bar to fuselage
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-19-2012
  | 
	3.50
  | 
	Seat back preparation
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-18-2012
  | 
	1.25
  | 
	More interior painting and bulkhead part preparati
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-18-2012
  | 
	1.00
  | 
	Began preparing seat back parts.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-17-2012
  | 
	2.75
  | 
	Prepared and primed more bulkhead parts
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-15-2012
  | 
	3.75
  | 
	Riveted and Painted Roll Bar
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-14-2012
  | 
	4.00
  | 
	Prepared and assembled Roll Bar Assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-13-2012
  | 
	2.25
  | 
	Match drilled roll bar and deburred
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-12-2012
  | 
	2.50
  | 
	Assembled Roll Bar Assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-11-2012
  | 
	3.25
  | 
	Finished Vent Door and Lwr Cowl Hinges
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-10-2012
  | 
	3.00
  | 
	Finished riveting side skins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-09-2012
  | 
	2.00
  | 
	Riveted right fuselage skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-08-2012
  | 
	6.00
  | 
	Finished deburing and primed skins - re-attached.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-07-2012
  | 
	4.00
  | 
	Debured and primed skins and Longerons.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-06-2012
  | 
	2.00
  | 
	Match Drilled Longerons & Skins
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-05-2012
  | 
	2.75
  | 
	Prepared and Clecoed Side Skins to Fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-04-2012
  | 
	3.00
  | 
	Attached side frame pieces to fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-03-2012
  | 
	3.25
  | 
	Prepared various parts for side skin attachment
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-02-2012
  | 
	2.50
  | 
	Match Drilled Longerons to Canopy Decks
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-01-2012
  | 
	4.00
  | 
	Fabricated both Longerons
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-31-2012
  | 
	0.50
  | 
	Cut Longerons to 82 3/8 inches
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-31-2012
  | 
	2.00
  | 
	Completed forward lower fuse
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-30-2012
  | 
	3.50
  | 
	Nearing completion of fwd lower fuse
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-29-2012
  | 
	3.25
  | 
	Continued to add nutplates etc.. to forward fuse
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-28-2012
  | 
	3.50
  | 
	Began assembly and additonal parts prep
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-27-2012
  | 
	3.00
  | 
	Deburred and prepared fwd fuse parts
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 03-26-2012
  | 
	0.50
  | 
	Finished section 21
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-26-2012
  | 
	1.00
  | 
	Collected section 22 parts and began deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-24-2012
  | 
	2.50
  | 
	Prepared bulkhead and installed steps
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-24-2012
  | 
	3.00
  | 
	Prepared and installed step floors
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-24-2012
  | 
	2.00
  | 
	Baggage bulkhead, pump bracket and AP bracket
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-22-2012
  | 
	3.50
  | 
	Prepared and clecoed bottom skin to fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-21-2012
  | 
	3.00
  | 
	Primed and installed corner skins
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-20-2012
  | 
	3.00
  | 
	Prepared parts for corner skins and main skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-18-2012
  | 
	4.50
  | 
	Completed Floor Seat Bulkhead and Control Assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-17-2012
  | 
	3.00
  | 
	Riveted Bulkhead Assembly Parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-17-2012
  | 
	3.00
  | 
	Completed assembly and attachment of bulkhead
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-16-2012
  | 
	3.50
  | 
	Riveted Floors to Mid Fuse and worked on bulkhead
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-16-2012
  | 
	5.00
  | 
	Riveted Bottom Skin & prepared step parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-15-2012
  | 
	2.50
  | 
	Prepared bulkhead
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-14-2012
  | 
	2.50
  | 
	Prepared parts for bulkhead
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-13-2012
  | 
	2.50
  | 
	Re-riveted Seat Floors and Ribs
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-12-2012
  | 
	2.75
  | 
	Seat Ribs & Floors Riveted Backwards
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-11-2012
  | 
	1.50
  | 
	Riveted seat ribs together
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-11-2012
  | 
	1.50
  | 
	Cut seat hinges and prepared them and floors
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-10-2012
  | 
	6.50
  | 
	Prepared and assembled seat rib assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-09-2012
  | 
	3.25
  | 
	Riveted Mixer Arm & Began Seat Ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-08-2012
  | 
	2.50
  | 
	Riveted Bearing Assembly & Parts Prep
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-07-2012
  | 
	3.50
  | 
	Further baggage ribs and parts preparation
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-06-2012
  | 
	3.00
  | 
	Riveted baggage floor skins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-05-2012
  | 
	2.50
  | 
	Riveted Baggage Floor
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-04-2012
  | 
	1.00
  | 
	Finished Step 2 20-04
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-04-2012
  | 
	3.50
  | 
	Began Section 21 with Spencer's help
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-03-2012
  | 
	3.00
  | 
	Finished Inventory & Organizing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-03-2012
  | 
	6.50
  | 
	Begain contruction of center bulkhead
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-02-2012
  | 
	3.50
  | 
	Continued Hardware Inventory
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-01-2012
  | 
	3.75
  | 
	Fuselage Kit Arrives - Inventory Begun
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-12-2012
  | 
	0.00
  | 
	Tested interior paint options (Part 2)
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-12-2012
  | 
	0.50
  | 
	Tested interior paint options (Part 1)
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-12-2012
  | 
	1.25
  | 
	Framed worktable
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-29-2011
  | 
	1.50
  | 
	Moved Wings from garage to storage unit for winter
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-17-2011
  | 
	4.50
  | 
	Finished assembly of both flapperons
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-15-2011
  | 
	2.50
  | 
	Riveting flapperon skins to spar
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-14-2011
  | 
	3.00
  | 
	Continued to assemble the flapperon
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-13-2011
  | 
	2.50
  | 
	Assembled actuation and pivot brackets
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-11-2011
  | 
	6.00
  | 
	Fabricated actuation and pivot brackets and began 
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-10-2011
  | 
	5.00
  | 
	More deburring and priming of flapperon parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-07-2011
  | 
	2.50
  | 
	More deburring and priming of flapperon skins
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-06-2011
  | 
	2.00
  | 
	Removed vinyl and began deburing nose and trailing
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 12-05-2011
  | 
	2.00
  | 
	More priming and prep of the flapperon nose skins
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-04-2011
  | 
	1.50
  | 
	Finished preparing flapperon ribs
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-04-2011
  | 
	0.00
  | 
	9" Band Saw
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-04-2011
  | 
	0.00
  | 
	6" Drill Press
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-03-2011
  | 
	3.00
  | 
	Put wings on stand and begain deburring flapperon 
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-01-2011
  | 
	2.00
  | 
	Completed intallation of wing root electrical conn
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-30-2011
  | 
	2.00
  | 
	Began working on new wing electical interconnecto
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-28-2011
  | 
	3.00
  | 
	Finished installing wing tip lights
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-27-2011
  | 
	2.00
  | 
	Begain working on the flapperon actenuators
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-27-2011
  | 
	1.00
  | 
	Applied resin/flox mixture to wing tip extensions
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-26-2011
  | 
	1.00
  | 
	Practised making up flox/epoxy mixture
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-26-2011
  | 
	3.50
  | 
	Match drilled wing tip extensions and worked on el
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-25-2011
  | 
	1.50
  | 
	Trimmed and filed W-1222-R/L wing extensions
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-24-2011
  | 
	2.75
  | 
	Completed riveting final right wing tip sheets
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-22-2011
  | 
	2.00
  | 
	Completed deburing, filing and priming W-1204D-R f
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 11-20-2011
  | 
	3.50
  | 
	Right wing doubler and wing tip
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-20-2011
  | 
	2.00
  | 
	Cut openings for wing tip lights
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-19-2011
  | 
	2.50
  | 
	Right wing leading edge skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-19-2011
  | 
	2.50
  | 
	Right wing landing light.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-18-2011
  | 
	2.00
  | 
	Riveted several right wing tip parts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-17-2011
  | 
	2.50
  | 
	Deburred and primed skins and parts for right wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-16-2011
  | 
	0.00
  | 
	Molex crimp tool
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-16-2011
  | 
	2.00
  | 
	Finished riveting last main skin to right wing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-15-2011
  | 
	2.75
  | 
	Attached final main skins on right wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-13-2011
  | 
	7.00
  | 
	Finished riveting bottom skins and begain working
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-12-2011
  | 
	4.00
  | 
	Almost completed right wing bottom skin riveting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-11-2011
  | 
	3.00
  | 
	Continued working on bottom right wing skins
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-10-2011
  | 
	1.50
  | 
	Prepared, primed and clecoed inboard skin to right
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-09-2011
  | 
	2.00
  | 
	Finished landing light ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-08-2011
  | 
	2.50
  | 
	Worked on Landing Light brackets and wiring
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-06-2011
  | 
	6.00
  | 
	Began lighting kit installation for right wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-05-2011
  | 
	0.50
  | 
	Finsihed Riveting Nose Ribs on Rgiht Wing
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-05-2011
  | 
	4.50
  | 
	Built EAA Wing Stand
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-03-2011
  | 
	2.50
  | 
	Riveted most of ribs to right wing spar
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-02-2011
  | 
	2.50
  | 
	Began Assembly of Right Wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-01-2011
  | 
	2.50
  | 
	Essentially Finished Left Wing - need to install w
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-29-2011
  | 
	5.00
  | 
	Riveting more of left wing and prepared additional
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-28-2011
  | 
	3.00
  | 
	Began Assembling / Riveting the left wing tip part
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-27-2011
  | 
	2.00
  | 
	Finished left wing doubler and began working on wi
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-26-2011
  | 
	1.50
  | 
	Finished riveting top skins to left wing and began
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-25-2011
  | 
	2.00
  | 
	Riveted most of remaining top skins to left wing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-19-2011
  | 
	2.50
  | 
	Clecoed last of the large skins to the left wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-18-2011
  | 
	2.25
  | 
	Riveted W-1201B-L and begain preparing last two la
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-16-2011
  | 
	5.00
  | 
	Riveted last skin to bottom of left wing and attac
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-15-2011
  | 
	3.50
  | 
	Prepared W-1202-L skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-14-2011
  | 
	3.00
  | 
	Riveted W-1203-L skin to left wing and began prep 
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-13-2011
  | 
	2.50
  | 
	Riveted W-1201-L skin to left wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-11-2011
  | 
	2.50
  | 
	Finished priming and clecoed first skin to left wi
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-10-2011
  | 
	3.50
  | 
	Preparing first two left wing skins
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-09-2011
  | 
	1.00
  | 
	Tested fit of 1202-L skin and stall warning assemb
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-08-2011
  | 
	4.50
  | 
	Installed Stall Warning Sub-Assembly and wiring fo
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-07-2011
  | 
	3.00
  | 
	Completed riveting ribs to Left Wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-05-2011
  | 
	2.50
  | 
	Attached Aft Ribs to Left Spar
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-02-2011
  | 
	6.00
  | 
	Finished Fluting, Priming and began riveting aft r
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-01-2011
  | 
	4.00
  | 
	Finsihed scuffing and cleaning deburred aft ribs
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 09-29-2011
  | 
	1.75
  | 
	Scuffed all the right aft ribs
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 09-25-2011
  | 
	1.00
  | 
	Finished deburring Aft Ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-24-2011
  | 
	2.50
  | 
	Contined Deburring Aft Ribs
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 09-20-2011
  | 
	2.00
  | 
	Continued deburing aft ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-18-2011
  | 
	2.50
  | 
	More deburring of Aft Ribs
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-17-2011
  | 
	2.50
  | 
	Deburring of Aft Ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-15-2011
  | 
	0.50
  | 
	Deburred several aft ribs
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 09-14-2011
  | 
	1.50
  | 
	Trimmed flanges and deburred aft ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-08-2011
  | 
	1.25
  | 
	Added nutplates to nose ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-07-2011
  | 
	1.25
  | 
	Finished Fluting and Priming Nose Ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-06-2011
  | 
	2.00
  | 
	Flute and prime most nose ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-05-2011
  | 
	2.50
  | 
	Cleaned all nose ribs with acetone and began to fl
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-04-2011
  | 
	4.00
  | 
	Finished deburing and skuffed up all the ribs for 
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-03-2011
  | 
	6.00
  | 
	Rib deburing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-02-2011
  | 
	2.75
  | 
	Deburred several 1208R nose ribs
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-01-2011
  | 
	0.30
  | 
	Riveted Rear Spar per section 14
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-01-2011
  | 
	1.50
  | 
	Begain preparing nose ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-31-2011
  | 
	1.75
  | 
	Deburing and primed both rear spar webs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-30-2011
  | 
	1.50
  | 
	Riveted hinge brackets and began to debur spar
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-29-2011
  | 
	1.00
  | 
	Countersunk and primed hinge brackets
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-28-2011
  | 
	0.50
  | 
	Replacement hinge bracket parts prep
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-18-2011
  | 
	3.00
  | 
	Riveting of Hinge Assembly and Hinge Brackets
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-17-2011
  | 
	3.50
  | 
	More Section 14 parts prep and priming
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-16-2011
  | 
	1.75
  | 
	Prepared L/R Sub Spar Assembly pieces
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-14-2011
  | 
	0.50
  | 
	Pulled parts for section 14 and cleaned up workspa
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-14-2011
  | 
	2.50
  | 
	Completed riveting attach angles to spars in secti
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-14-2011
  | 
	1.50
  | 
	Built mini stand to hold wing spars in place for c
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-13-2011
  | 
	4.75
  | 
	Began spar assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-12-2011
  | 
	3.00
  | 
	Completed fulll inventory and parts storage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-10-2011
  | 
	1.50
  | 
	Day 2 unpacking wing crates and inventory of parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-09-2011
  | 
	1.60
  | 
	Began to unpack wings crates
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-01-2011
  | 
	0.00
  | 
	Visit to AirVenture
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-08-2011
  | 
	3.00
  | 
	Finished preparing and riveted tips to rudder and
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-07-2011
  | 
	1.50
  | 
	Removed material from R-1206 & VS-1213 tips
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-04-2011
  | 
	1.00
  | 
	Hung completed tailcone to garage ceiling
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-04-2011
  | 
	2.00
  | 
	Completed Trim/Servo Assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-03-2011
  | 
	1.00
  | 
	Prepared parts for Trim/Servo assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-02-2011
  | 
	2.50
  | 
	Clecoed and riveted topskin to tailcone
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-02-2011
  | 
	2.00
  | 
	Added spade connectors to the leads from servo
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-01-2011
  | 
	1.50
  | 
	Match drilled and prepared top tailcone skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-24-2011
  | 
	3.25
  | 
	Riveted F1280 and F1279 L/R skins to frame
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-24-2011
  | 
	1.00
  | 
	Completed static system - attached tubes
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-19-2011
  | 
	0.50
  | 
	Primed inner surface of F-1279 L/R skins
  | 
	
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-19-2011
  | 
	1.50
  | 
	Assembled servo tray
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-18-2011
  | 
	1.00
  | 
	Riveted nutplates to F12106  Fwd Skin Rib
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-18-2011
  | 
	2.50
  | 
	Began preping the parts for the AST attachment
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-18-2011
  | 
	2.00
  | 
	Began preping the 1279 L/R skins for tailcone
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-17-2011
  | 
	3.00
  | 
	Trim wire and static system install
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-17-2011
  | 
	1.00
  | 
	Clecoed F-1280 R/L to tailcone
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-17-2011
  | 
	1.00
  | 
	Began prep of snap bushing bracket and F-12106
  | 
	
			Details 
		 | 
	
	  		 
		       | 
 
	
  | 
	
	
	 06-16-2011
  | 
	2.50
  | 
	Prepared 1280 L R Side Skins
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-12-2011
  | 
	2.00
  | 
	Riveted aft hinge and aft skins to stabilator
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-12-2011
  | 
	1.50
  | 
	Measured and glued washers for F-1211 assembly to 
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-12-2011
  | 
	0.50
  | 
	Clecoed F-1211 assemble to the tailcone
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-11-2011
  | 
	4.50
  | 
	Assembled and riveted skins to stabilator skeleton
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-10-2011
  | 
	1.50
  | 
	Drilled and deburred stab hinges
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-09-2011
  | 
	1.00
  | 
	Began working on replacement AST hinges
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-08-2011
  | 
	3.00
  | 
	Riveted bottom and side skins on tailcone
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-07-2011
  | 
	1.25
  | 
	Primed 1281 L/R tail skins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-06-2011
  | 
	0.00
  | 
	Confirmation from FAA on tail number reservation
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-06-2011
  | 
	3.50
  | 
	Clecoed bottom skins and began working on 1281 L/R
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-05-2011
  | 
	1.75
  | 
	Began working on bottom tail skins
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-05-2011
  | 
	5.00
  | 
	Assembled and riveted bulkhead
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-04-2011
  | 
	2.00
  | 
	Prepared bulkhead and other parts.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-03-2011
  | 
	1.50
  | 
	Prepared bulkhead doubler - primed and painted par
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-02-2011
  | 
	2.50
  | 
	Riveted fuselage and fabricated skid bracket
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-30-2011
  | 
	4.00
  | 
	Began working on tailcone
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-30-2011
  | 
	1.00
  | 
	Added lead weights to counterbalance arm
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-28-2011
  | 
	0.50
  | 
	Stored stabilator parts in overhead loft
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-27-2011
  | 
	2.00
  | 
	Prepared Stabilator Skins
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-27-2011
  | 
	8.00
  | 
	Assembled Stabilator Skeleton Assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-24-2011
  | 
	3.00
  | 
	HS-1203 spar arrived - completed steps passed over
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-23-2011
  | 
	0.00
  | 
	Torque wrench arrived from Sears
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-22-2011
  | 
	5.00
  | 
	Deburred, primed ribs and began preping parts for
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-21-2011
  | 
	1.50
  | 
	Sourced ribs for spar and began deburing them
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-20-2011
  | 
	2.50
  | 
	Riveted spar and began adding nutplates
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-19-2011
  | 
	3.00
  | 
	Primed and began assembling spar
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-18-2011
  | 
	3.00
  | 
	Began preparing stabilizer spar parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-17-2011
  | 
	0.50
  | 
	Organized parts for stabilizer spar
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-14-2011
  | 
	0.00
  | 
	Hillary learning to build an airplane!
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-14-2011
  | 
	4.50
  | 
	Finished right and left ASTs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-13-2011
  | 
	1.00
  | 
	Removed plastic and preped anti-servo tab parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-11-2011
  | 
	2.00
  | 
	Finished Rudder
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-10-2011
  | 
	3.50
  | 
	Measured rudder to V-stab & primed frame
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-09-2011
  | 
	2.50
  | 
	Began work on rudder
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-08-2011
  | 
	0.00
  | 
	Vertical Stablizer (some more pictures)
  | 
	
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-08-2011
  | 
	6.00
  | 
	Finished Vertical Stabilizer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-07-2011
  | 
	0.00
  | 
	Went Flying - finished biannual in N9081H (C172)
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-06-2011
  | 
	0.00
  | 
	Hand rivet squeezer
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-05-2011
  | 
	4.00
  | 
	Primed and riveted V-frame structure
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-04-2011
  | 
	0.20
  | 
	Reserved N number
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-03-2011
  | 
	3.50
  | 
	Spar Cap deburring, countersink & priming
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-02-2011
  | 
	3.50
  | 
	First day building - hinge bracket and spar cap
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-01-2011
  | 
	1.50
  | 
	Built framed screen for painting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-30-2011
  | 
	3.50
  | 
	Unpack / Inventory parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-29-2011
  | 
	1.50
  | 
	Updated garage workshop - lights, bins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-29-2011
  | 
	2.00
  | 
	Began to unpack kit #1 from Vans crate
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-28-2011
  | 
	0.00
  | 
	Tail kit arrives from Fed Ex
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-27-2011
  | 
	0.00
  | 
	Workshop Overview
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-18-2011
  | 
	0.00
  | 
	Pneumatic rivet puller
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-18-2011
  | 
	0.50
  | 
	Ordered RV-12 Kit from Vans
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-18-2011
  | 
	0.00
  | 
	Favorite deburring tools
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-16-2010
  | 
	0.00
  | 
	Rivet gun
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-16-2010
  | 
	0.00
  | 
	Air drill
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-15-2010
  | 
	0.00
  | 
	Kobalt Compressor
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       |