KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  8-4-2012
Number of Hours:  6.00
Manual Reference:  35-03
Brief Description:  Installed both main gear legs to fuselage

Long day but managed to install both main gear legs to the fuselage. Torqued all the bolts and only have one that I am not happy with and will likely replace as I believe the nut is stripped. Otherwise the install is complete. Very small openings and area to work so it took a long time to properly install all the bolts. Needed to buy an angled socket wrench at Home Depot to complete the install.
' style=





' style=

Channel with attach plates for gear legs

Channel with attach plates for gear legs

' style=

Leaf gear leg

Leaf gear leg

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.