KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  7-5-2012
Number of Hours:  1.50
Manual Reference:  30-02
Brief Description:  Fabricated the Fuselage Pin Assembly

Fabricated both pin assemblies. Used fast hardening epoxy and installed the pins into the fuselage for switch testing which took some time. Ended up grinding down the tubes on the assembles to get proper continuity on the pins in testing.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.