KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  7-5-2012
Number of Hours:  4.50
Manual Reference:  31B-09 to 31B-12
Brief Description:  Wiring and spar pin switch testing

Continued to install parts of wire bundle to fuselage. Installed wires and molex pin for autopilot pitch servo. Installed wires for the spar pins and tested them later on after they were fabricated. Installed connector for fuel pump and while installing cushion clamp for this section I broke the ring connector for the ground wire on the pump. Went to Radio Shack and bought a replacement and installed it.

Begain working on the control stick. Could not find a way to feed a string or wire down through the stick. Spencer even helped. We gave up and moved onto other things. Need to figure this out.
' style=

Temp place for fuel system /GPS wiring

Temp place for fuel system /GPS wiring

' style=

Wiring in central channel of fuselage

Wiring in central channel of fuselage

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.