KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  7-3-2012
Number of Hours:  1.75
Manual Reference:  31B-02 to 31B-03
Brief Description:  Began Finish Kit Build

Began build of finish kit this afternoon. Enlarged and installed gromet into firewall first. Then installed 5/8" Wire Duct into the central channel. Installed two transponder cables into the fuselage and then installed the ELT cable as well.
' style=

Wire Duct in central channel

Wire Duct in central channel

' style=

Transponder/COM cables in panel floor

Transponder/COM cables in panel floor

' style=

Cables routed under panel

Cables routed under panel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.