Brief Description: Fabricated actuation and pivot brackets and began
Slow start to the day while getting new blade properly loaded into band saw. After getting it stable, began to cut and drill the various actuation and pivot brackets (A-1207-L/R, A-1206 X 4). Several distractions like moving the drill press to a better location in shop. Seemed to take a long time, but finally completed all the pieces and primed them.
Then began assembly of the spar itself. Attached the ribs to the counterweight (A-909) and match drilled the nose skins. Should go a little faster from here.
Priming
Completed fabrication and priming of attachment and pivot brackets