KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  5-6-2013
Number of Hours:  2.50
Manual Reference:  46-10 to 46-14
Brief Description:  Began connecting fuel lines & wiring to engine

Obtained 9/16" crowfoot extention for torque wrench from Lowes and then was able to properly torque and add cotter pins to the castle nuts that hold the top bolts on engine mount.

Attached fuel lines to the engine per the plans and torqued the top bolt holding the lines together. Used Fuelube on the three connections (fuel and return lines and pressure sensor)

Attached ignition harness wiring to the wires from the firwall forward harness per 46-12.

Installed the Easy Start wires to the ignition module connector. Had difficult time removing the B2 connector given the small space to work in but finished the job.

Routed and attached the oil pressure sensor and wires on the lower right side of the engine per 46-14. Began to route the various oil temperature wires. Will need to add connectors and trim wires next.
' style=

Fuel lines finally installed on engine.

Fuel lines finally installed on engine.

' style=

Lower right side of engine.

Lower right side of engine.

' style=

Wiring will need to be better organized with zip ties here.

Wiring will need to be better organized with zip ties here.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.