KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  4-28-2012
Number of Hours:  2.50
Manual Reference:  28-02 to 28-03
Brief Description:  Began fabrication of fuel system

Began working on the fuel system. Assembled the fuel line from the tank to the fuel pump. First time I fabricated a fuel line and it went amazingly well. Also fabricated most of the fuel valve bracket. Installed the fuel pump to the fuselage.
' style=

Fuel value bracket

Fuel value bracket

' style=

Fuel pump

Fuel pump

' style=

Fuel line end at tank opening

Fuel line end at tank opening

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.