KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  5-11-2012
Number of Hours:  2.50
Manual Reference:  29A-04 to 05
Brief Description:  Further preparation of upper fuse parts

Continued preparing parts, priming and adding nutplates. Decided to drill out several AN426 rivets that were not flush enough on the stack angles. Riveting the small nutplates can be a little challenging. Also fabricated the strut attach angle and primed it.
' style=

Several parts primed and ready for nutplates and assembly

Several parts primed and ready for nutplates and assembly

' style=

First coat of red enamal paint on oil tank bracket

First coat of red enamal paint on oil tank bracket

' style=

F-00026 L/R stack angles with nutplates riveted on them

F-00026 L/R stack angles with nutplates riveted on them

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.