KitLog pro

Powered By Kitlog Pro v2.0

Brent Connelly - N913BC
' style=
Date:  1-17-2013
Number of Hours:  3.00
Manual Reference:  35-04 to 35-05
Brief Description:  Installed brake lines along gear legs

After completing the E-LSA inspection course earlier in the week in Florida, I installed the L/R brake lines to each side fo the aircraft. I delayed this until the SB was completed. I needed to get some clear tubing from Home Depot that properly fit the 1/4" brake lines. After completing this I noticed that I had incorrectly fed the plastic brakelines inside the channel and they needed to be removed from each U-1203 block and re-routed to avoid the moving parts in the center channel. Not particularly difficult but its a small area to fit tools/hands so it took some time.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.