Date:  03-18-2023
Number of Hours:  5.00
Short Description:  Added Essential Bus Relay + Tested

Studied schematics and consulted with Steinair avionics engineer for general connection to my circuit.

Connected ESS BUS and MAIN PWR DIST to the ESS BUS Relay and separate feeder bus from Crowbar and Battery Contactor.

Drilled switch panel and added switches temporarily.

Ran 22 and 20 AWG Tefzel lines to the ESS BUS and ESS BUS switch.

Performed multimeter test of 1V and 12.52V with switch on to ESS BUS. MAIN and ESS can now be isolated.















Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Barry Wawrin
RV14A-QB
03-21
2054
Andrew Duff
Nexus Mustang
03-20
2218
Michael Smith
RV-7
03-20
300
Andrey Piskarev
Highlander
03-19
3383
Chuck Bennett
Sonex-B Tri-Gear
03-19
832
Jean Gosselin
RV6
03-19
2101
Peter McBain
RV-9A
03-19
1871
Carl Orton
750 Cruzer
03-18
1072
Jim Novak
RV-8
03-18
2908
Mark Weitkamp
CX4
03-18
2040
Stephen Eastham
CH-601 HDS
03-18
249
Edward Beam
RV-14A
03-17
1119
Peter Calley
Sling4
03-17
2234
Gary Smith
RV-10
03-14
2212
Jack Clark
RV-14A
03-14
331
Bob Corriveau
RV-8
03-11
3530
Des Howson
Sling 2 Taildragger
03-05
3197
Mark Jackson
RV-8
03-05
1544
Neil Rosoff
EX-3
02-28
744
Darrel Watson
H-5
02-26
273
Tony Rose
RV-6A
02-25
1000
Marlin Sander
RV-7A
02-23
4851
Paul Minelga
Bearhawk
02-18
3472
Lance W. Miller
CH650
02-11
552
Wendell Engelien
RV-6A
02-09
2273
Jon Ray
Excalibur
02-04
282
Mark Johnson
RV-10
02-04
382
Jack Clark
RV-A8
02-01
3926
Otto/Sasich
RV4
02-01
440
Daniel Moreno
DR 107 ONE DESIGN
01-30
3489

Projects Uploaded: 1535
Logs Uploaded: 279329








Copyright © 2001-2023 Matronics. All Rights Reserved. Privacy Policy.