|
Previous Builder
Next Builder
Date: 01-03-2013
|
Number of Hours: 4.00
|
Short Description: oil door
|
Continued with the oil door. I drilled and clecoed a metal strip that I fabricated for the strike plate fot the latch.
Also drilled on the hidden hinge.
I was too aggressive with the sander in trimming up the aluminum plate that will be the basis of the oil door, which I will later cover with fiberglass.
Previous Builder
Next Builder
|