Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  Franklin Gaxiola
Location:
  Tucson, AZ - USA
Aircraft:
  RV-12iS
Total Build Hours:
  3712
Web Site:
  http://www.mykitlog.com/gaaerospace/

Date:  01-02-2019
Number of Hours:  4.00
Short Description:  Bulletin 08/02/2018 Oil tank bracket

We complied with a bulletin that we received regarding a modification to the oil tank brackets.

Along with the instructions we received a template that we used to complete the following steps on the bulletin:

1. Traced a trim line on F-01201E L&R.

2. Removed material on F-012021E L&R up to the trim line.

3, Drilled out six rivets on each side.

4. Riveted F-00194 onto F-01201E both.















Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Carl Orton
750 Cruzer
01-19
308
David LeFrancois
Cozy MKIV
01-19
670
Franklin Gaxiola
RV-12iS B
01-19
865
Jean Gosselin
RV6
01-19
452
Mark Santangelo
Cody's VP-1
01-19
128
Robert Lussow
RV-10
01-19
2078
Wayne Parsons
RV-8
01-19
286
Andrey Piskarev
Highlander
01-18
380
Armando Escalante
RV-12iS
01-18
10
Chris King
Fokker D.VII
01-18
717
David Macdonald
RV-10
01-18
1980
Gregory Koch
Model 12
01-18
324
John Peck
C120
01-18
330
Tim Treat
MTO Sport 2017
01-18
70
Doug Malloy
CH 750 Cruzer
01-17
768
Giorgio Azzalin
Trail
01-17
555
Marlin Sander
RV-7A
01-17
3298
Phil Risley
RV9
01-17
391
Ronald Machisen
RV-14A
01-17
236
Wesley VanDyke
RV-8
01-17
1110
Darren Fern
RV8
01-16
976
G.H. "Steve Riffe
RV8
01-16
2653
Jay Johnson
CH-750 Cruzer
01-16
1135
Martin Filiatrault
RV-8
01-16
1480
Miles Bowen
RV-7
01-16
1745
Andrew Caldwell
RV-8
01-15
142
Steve Shae
S-20 Raven
01-15
1097
Tim Cunningham
Sling 2
01-15
77
Craig Reding
RV-8
01-14
1476
Des Howson
Sling 2 Taildragger
01-14
1866

Projects Uploaded: 1430
Logs Uploaded: 242301








Copyright © 2001-2019 Matronics. All Rights Reserved. Privacy Policy.