Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  Franklin Gaxiola
Location:
  Tucson, AZ - USA
Aircraft:
  RV-12iS A
Total Build Hours:
  5777
Web Site:
  http://www.mykitlog.com/gaaerospace/

Date:  02-11-2020
Number of Hours:  1.48
Short Description:  SB 20-01-17 Compliance

02/10/20: 0.8Hrs
46iS-11
1: The magnetic plug was safety-wired to the crankshaft plug screw.
Worked on step 2

02/11/20: 0.68Hrs
2: The oil pressure regulator plug was safety-wired to the engine pump housing. To do so, the radiator had to be semi-removed.
3: The oil tank drain plug had already been previously safety-wired.















Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Des Howson
Sling 2 Taildragger
08-09
2302
Greg Long
RV-12
08-08
1397
Robert Lussow
RV-10
08-08
2764
Thomas Balmer
Challenger Part 103
08-08
12
Thomas Ferranti
RV7
08-08
334
Andrey Piskarev
Highlander
08-07
1412
John Peck
C120
08-07
330
Martin Filiatrault
RV-8
08-07
2740
Donald Morrisey
CH 750 CruZer
08-06
440
John McGlynn
S-19
08-06
306
Michael Gugl
Lightning LSA
08-06
1246
Rick McBride
RV-10
08-06
1953
Wendell Engelien
RV-6A
08-06
2020
James Roberts
RV8
08-05
144
Jay Burgess
IV
08-05
903
Marlin Sander
RV-7A
08-05
3733
Neil Rosoff
EX-3
08-05
160
Norris Brown
RV10
08-05
1382
Mark Jackson
RV-8
08-04
1112
Rick Crisenbery
S20
08-04
282
Bob Collins
RV-12iS
08-03
686
David LeFrancois
Cozy MKIV
08-03
8
Sean Smith
CX5
08-03
1000
Jim Novak
RV-8
08-02
2130
Mark Johnson
RV-10
08-02
20
Edward Beam
RV-14A
08-01
493
Lance W. Miller
CH650
07-31
223
Mark Spedding
Cozy IV
07-31
2086
Randy Doughty
CH750 Cruzer
07-31
605
Bob Corriveau
RV-8
07-30
1737

Projects Uploaded: 1490
Logs Uploaded: 260396








Copyright © 2001-2020 Matronics. All Rights Reserved. Privacy Policy.