Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  Franklin Gaxiola
Location:
  Tucson, AZ - USA
Aircraft:
  RV-12iS A
Total Build Hours:
  5928
Web Site:
  http://www.mykitlog.com/gaaerospace/

Date:  10-27-2020
Number of Hours:  0.80
Short Description:  42MiS/U-18

10/27/2020 .8Hrs
Headset jacks were attached to both F-1226-L & R. Discontinuity between the nuts on the headphone and mic jacks and airframe ground was checked. ES-00301 was installed. Pilot stick grip connectors were conected and left wigroot and pilot stick grip ground ring terminals were secured.















Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Bob Collins
RV-12iS
12-01
750
Chris King
Fokker D.VII
12-01
1952
John Peck
C120
12-01
332
Norris Brown
RV10
12-01
1484
Rick McBride
RV-10
12-01
2556
Scott Ahrens
Patrol
12-01
522
Andrey Piskarev
Highlander
11-30
1486
Lance W. Miller
CH650
11-30
280
Carl Peterson
Bearhawk 4-place "A"
11-29
194
Jean Gosselin
RV6
11-29
1115
Keith Borgstrom
Sonex
11-29
382
Ronald Cardwell
RV-8
11-29
868
Thomas Ferranti
RV7
11-29
485
Brian Perry
RV-14a
11-28
1020
Carl Orton
750 Cruzer
11-28
775
David LeFrancois
Cozy MKIV
11-28
778
Edward Beam
RV-14A
11-28
601
James Roberts
RV8
11-28
194
Jim Novak
RV-8
11-28
2248
Mark Jackson
RV-8
11-28
1241
Mark Sanders
RV-10
11-28
913
Martin Filiatrault
RV-8
11-28
2938
Michael Truett
RV-9A
11-28
618
Sean Smith
CX5
11-28
1173
Wesley VanDyke
RV-8
11-28
1453
Phil Risley
RV9
11-27
1145
Rick Crisenbery
S20
11-27
409
Terry Moushon
RV 10
11-27
3945
Des Howson
Sling 2 Taildragger
11-25
2380
James Chadwick
RV-7
11-25
392

Projects Uploaded: 1495
Logs Uploaded: 264035








Copyright © 2001-2020 Matronics. All Rights Reserved. Privacy Policy.