Date: 02-27-2008
|
Number of Hours: 40.00
|
Short Description: Completed main gear fairings, pants, intersect fai
|
I finally finished installing the gear leg fairings on the main gear, did all the measurements, tightened them in place and installed the upper intersect fairings. I also aligned the main wheel pants with a mark on the floor. Nell helped me with pulling chalk lines etc. I then trimmed the lower Fairings Etc. intersect fairings and glassed them on the pants. I then applied epoxy to wheel pants, sanded them, installed all the nut plates, upper gear leg fairings, and installed all the fairings. The main gear leg fairings pants, etc weigh 4 pounds. I have added 10.2 lbs with all the fairings etc.