Powered By Kitlog Pro v2.0
My RV-7A
RV-7A
Fuel Tanks
68 Logs Found
Date
Hours
Work Log Summary
Details
05-26-2010
0.5
2 - Pressure Test Left Fuel Tank
Details
05-26-2010
1.0
1 - Fitted Tank to wing
Details
05-23-2010
1.5
Sealed / Installed Access Panel
Details
05-22-2010
4.0
Sealed / Installed Rear Baffle
Details
05-20-2010
1.5
Rear Baffle
Details
05-18-2010
1.5
Fuel Sending Plates
Details
05-17-2010
1.5
Fuel Sender
Details
05-16-2010
4.5
Sealed / Revited
Details
05-15-2010
1.5
Sealing the Tanks
Details
05-06-2010
1.0
Fabricated Fuel Vent Line
Details
04-25-2010
1.5
Flop Tube Setup
Details
04-24-2010
1.5
Riveting Ribs
Details
04-23-2010
2.0
Riveted Ribs #3 and #5
Details
04-22-2010
1.5
Sealed Ribs #3 #5
Details
04-21-2010
0.0
Update
Details
04-11-2010
1.5
Sealed / Riveted Rib #4
Details
04-09-2010
1.5
Started Sealing / Installing ribs
Details
04-08-2010
2.0
Sealed and Riveted the Stiffeners
Details
04-07-2010
1.5
Sealed Fuel Filler Flange
Details
04-06-2010
2.0
Dimpled Left Tank Skin
Details
04-04-2010
2.0
Preparing Stiffeners and Ribs
Details
04-03-2010
4.0
Prepaing the Left Fuel Tank Ribs
Details
04-01-2010
1.5
Fabricated T-405
Details
03-30-2010
1.5
Counter Sink Skins for Baffle
Details
03-29-2010
1.5
Match Drilled Left Tank
Details
03-28-2010
4.5
Left Full Tank
Details
03-27-2010
7.0
Completed Right Fuel Tank
Details
03-25-2010
1.5
Test Fit it Right Wing
Details
03-18-2010
1.5
Fuel Vent Line / Fuel sending plates
Details
03-16-2010
1.5
Installed T-405 / Fuel Pickup
Details
03-13-2010
1.5
Riveted rib #1
Details
03-12-2010
1.5
Installed Rib #1
Details
03-11-2010
1.5
Fuel Sending Plates
Details
03-09-2010
0.3
Fuel Pickup
Details
03-08-2010
1.3
Riveted Outer Rib
Details
03-07-2010
2.0
Fitted / Sealed Outer Rib
Details
03-06-2010
1.5
Trial Fitting
Details
03-02-2010
1.5
Sealed Rib / Fabricated Vent Line
Details
02-28-2010
1.0
Sealed the BNC Fuel Sender Connectors
Details
02-27-2010
1.5
Riveted #3 / #5 Ribs
Details
02-26-2010
1.5
Installed / Sealed #3 and #5 Ribs
Details
02-25-2010
1.0
Scuffing and cleaning Ribs
Details
02-21-2010
1.5
Rivet Ribs #2 and #6
Details
02-20-2010
1.5
Sealed / Cleco'd Ribs #2 and #6
Details
02-19-2010
1.5
Riveted #4 Rib Right Fuel Tank
Details
02-18-2010
1.5
Sealed / Installed Rib #4
Details
02-16-2010
2.0
Deburring / Scuffing / Cleaning
Details
02-11-2010
1.5
Scuffing and Cleaning
Details
02-09-2010
1.5
Sealed / Riveted Fuel Cap Flange
Details
02-06-2010
1.0
Sealed Stiffeners / Drain Valve
Details
02-04-2010
2.0
Rivet / Seal Right Fuel Tank
Details
02-02-2010
2.0
Finished Dimpling
Details
01-31-2010
5.0
Dimpling and Z Brackets
Details
01-30-2010
1.0
Scuffing
Details
01-29-2010
1.0
Deburring / Scuffing
Details
01-26-2010
2.0
Fuel Drain / Deburring
Details
01-25-2010
0.5
Soldered the BNC
Details
01-24-2010
2.5
Flop Tube Anti-Hang Brackets
Details
01-21-2010
2.0
Cut Access Hole for Left Wing
Details
01-19-2010
2.0
Access Cover
Details
01-17-2010
3.0
Tank Attachment Angle / Re-inforcement Plate
Details
01-14-2010
1.0
Dis-assembled the Right Tank
Details
01-12-2010
1.0
Right Wing Tank Attach Angle
Details
01-11-2010
1.5
Started the T-405 Attach Angle
Details
01-10-2010
1.5
Countersink / Match Drilling
Details
01-09-2010
6.0
Tank Skins / Ribs / Baffles
Details
01-08-2010
2.0
Attachment Angles and Tank Baffle
Details
01-07-2010
2.0
T-712 Fuel Tank Attachment Angles
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
All
Avionics
Cockpit
Electrical
Elevators
Empennage
Engine
Firewall Forward
Fuel Tanks
Fuselage
Hanger
Horizontal Stab
Introduction
Miscellaneous
Mistakes
None
Paint Schemes
Practice Kit
Rudder
Shop
Shop Supplies
Tools
Vertical Stab
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.