Powered By Kitlog Pro v2.0
My RV-7A
RV-7A
Horizontal Stab
27 Logs Found
Date
Hours
Work Log Summary
Details
07-18-2009
0.0
HS Internal Structure
Details
07-18-2009
0.0
Final HS Photo Record
07-18-2009
3.0
Completed riveting the Horizontal Stabilizer
Details
07-16-2009
1.0
Rivet Bottom of Right HS
Details
07-14-2009
1.0
Riveted Right HS Top Skin
Details
07-13-2009
2.0
Rivet Left HS-702, 708, HS-601PP
Details
07-12-2009
2.0
Rivet HS-707 / 702
Details
07-12-2009
1.0
Rivet HS-601PP / 702 Front Spar
Details
07-11-2009
1.0
Riveted the HS Front Spar
Details
07-11-2009
1.0
Riveted HS-707 to HS-601PP
Details
07-11-2009
2.0
Riveted HS Rear Spar
Details
07-09-2009
2.0
Cleaned and primed the inside HS skins
Details
07-08-2009
1.0
Epoxy Primed HS Spars
Details
07-07-2009
1.0
Epoxy primed the Ribs and spar angles
Details
07-06-2009
1.0
Acid Etched and Alodine
Details
07-05-2009
5.0
De-burred / Dimpled / Alodine
Details
07-04-2009
2.0
Right HS, HS-710/714, HS-404/405, Finish Drill Ski
Details
07-02-2009
2.0
Final Drilled Left HS / Skin on Right HS
Details
07-01-2009
3.0
HS-404 / HS-405 / HS-710 / HS-714
Details
06-30-2009
1.0
Primed and riveted VA-146 to HS-411
Details
06-24-2009
0.5
Temporarily pieced a few things together
Details
06-24-2009
1.0
Contoured HS-404, Fluted HS-700's
Details
06-23-2009
1.0
Relief holes contoured for HS-702
Details
06-23-2009
1.0
6 degree bends in HS-710 / HS-714
Details
06-22-2009
1.0
Contoured HS-710 / HS-714
Details
06-21-2009
2.0
Rear Spar Hinges / Front Spar Angles
Details
06-18-2009
2.0
Rear Spar
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
All
Avionics
Cockpit
Electrical
Elevators
Empennage
Engine
Firewall Forward
Fuel Tanks
Fuselage
Hanger
Horizontal Stab
Introduction
Miscellaneous
Mistakes
None
Paint Schemes
Practice Kit
Rudder
Shop
Shop Supplies
Tools
Vertical Stab
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.