Powered By Kitlog Pro v2.0
My RV-7A
RV-7A
Horizontal Stab
27 Logs Found
First Photo
Date
Work Log Summary
07-18-2009
HS Internal Structure
07-18-2009
Final HS Photo Record
07-18-2009
Completed riveting the Horizontal Stabilizer
07-16-2009
Rivet Bottom of Right HS
07-14-2009
Riveted Right HS Top Skin
07-13-2009
Rivet Left HS-702, 708, HS-601PP
07-12-2009
Rivet HS-707 / 702
07-12-2009
Rivet HS-601PP / 702 Front Spar
07-11-2009
Riveted the HS Front Spar
07-11-2009
Riveted HS-707 to HS-601PP
07-11-2009
Riveted HS Rear Spar
07-09-2009
Cleaned and primed the inside HS skins
07-08-2009
Epoxy Primed HS Spars
07-07-2009
Epoxy primed the Ribs and spar angles
07-06-2009
Acid Etched and Alodine
07-05-2009
De-burred / Dimpled / Alodine
07-04-2009
Right HS, HS-710/714, HS-404/405, Finish Drill Ski
07-02-2009
Final Drilled Left HS / Skin on Right HS
07-01-2009
HS-404 / HS-405 / HS-710 / HS-714
06-30-2009
Primed and riveted VA-146 to HS-411
06-24-2009
Temporarily pieced a few things together
06-24-2009
Contoured HS-404, Fluted HS-700's
06-23-2009
Relief holes contoured for HS-702
06-23-2009
6 degree bends in HS-710 / HS-714
06-22-2009
Contoured HS-710 / HS-714
06-21-2009
Rear Spar Hinges / Front Spar Angles
06-18-2009
Rear Spar
SITE NAVIGATION
Contact Builder
RV-7A Home
All
Elevators
Empennage
Fuel Tanks
Horizontal Stab
Introduction
Miscellaneous
Mistakes
Practice Kit
Rudder
Shop
Shop Supplies
Tools
Vertical Stab
Wings
Copyright © 2001-2010 Matronics. All Rights Reserved.