KitLog pro

Powered By Kitlog Pro v2.0

My RV-7A
32 Logs Found 
 Date
Hours
Work Log Summary

Details

 04-18-2013
1.5
Oil Cooler Air By-pass
Details
       

 02-24-2013
1.5
Installed FS1-14B Backup Alternator
Details
       

 01-25-2013
1.5
Pass Through for Throttle/Mixture Cables
Details
       

 12-22-2012
3.0
Lower Cowling Hinges
Details
     

 10-26-2012
3.0
Gascolators
Details
       

 10-23-2012
1.5
EMAG-P Vacuum Line
Details
       

 10-22-2012
1.5
Fuel Flow Transducer
Details
       

 10-13-2012
2.5
Fuel Flow Transducer / Electrical
Details
     

 10-11-2012
0.0
Fuel Flow / Fuel Level
Details
     

 10-02-2012
2.5
CHT/EGT Wiring / Throttle Quadrant
Details
       

 09-30-2012
3.0
Sensors
Details
       

 09-08-2012
2.0
Throttle / Mixture Cables / Fuel Fittings
Details

 09-05-2012
1.0
Oil Cooler Fittings / Fuel Fittings
Details

 09-02-2012
2.0
Fuel Lines Through Firewall
Details

 09-01-2012
1.5
Mnaifold Pressure Line
Details
     

 08-24-2012
1.5
EGT/CHT Wiring
Details

 08-22-2012
2.5
Firewall Forward / VP-X Pro
Details
       

 08-21-2012
1.5
Alternate Cable
Details
       

 08-19-2012
2.5
Pressure Line / Electrical
Details
     

 08-15-2012
2.0
Firewall Pass Through
Details

 08-12-2012
1.0
Battery
Details
     

 08-09-2012
2.0
Alternator / Starter
Details
       

 08-06-2012
2.0
Starter Gear / Baffling
Details
       

 08-05-2012
2.5
Exhaust System
Details
       

 08-04-2012
2.5
Installed Engine on Airframe
Details
       

 07-26-2012
3.5
Firewall Prep
Details
       

 07-25-2012
3.0
Battery Box / Firewall
Details
       

 07-24-2012
4.5
Firewall Recess
Details
       

 07-21-2012
2.0
Firewall
Details
       

 07-19-2012
2.0
Firewall system Installation
Details
       

 07-14-2012
3.5
Engine Mount / Master / Starters Selnoids
Details
       

 07-13-2012
3.5
Engine Sensors / Enigne Mount
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.