KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  8-5-2012
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Exhaust System

I began by installing the mufflers and exhaust pipes.
I need to get everything that is HOT is place, and check clearances.
Fabricated the supports per Vetter's instruction.
Temporarily installed the oil cooler lines, to determine routing.
Temporarily installed the carb, along with the cable mounting bracket.
Everything looks really nice for cable routing etc.
' style=

Right Muffler

Right Muffler

' style=

Left Muffler

Left Muffler

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.