KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  5-16-2010
Number of Hours:  4.50
Manual Reference:  Sec 7-6 DWG 16A
Brief Description:  Sealed / Revited

Really got some work doen today...
Sealed and riveted Rib #1 and Rib #7
Installed / Sealed / Torqued vent line and fuel pick up (Flop Tube)
Installed the fuel sending plate / routed wire through gromets.

It is really nice to get back in the shop... I have really missed working on my RV.
I still have my remodel project going inside the house, really cutting into my time.
One day at a time...
' style=

Rib #7 Sealed / Riveted

Rib #7 Sealed / Riveted

' style=

Vent / Flop tube Installed

Vent / Flop tube Installed

' style=

Rib #1 Sealed and Riveted

Rib #1 Sealed and Riveted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.