KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  3-9-2010
Number of Hours:  0.25
Manual Reference:  Sec 7-7 DWG 16A
Brief Description:  Fuel Pickup

I did not get too much done... but it all has to be done, no matter how little.

Let me explain... I am putting in Bamboo Hardwood floors, and tiles throughout the house.
I went and picked up 30 boxes of tiles at about 65 lbs per box. So, after loading and unloading a "TON" literally... I was a bit tired.

I ran out and torqued and safety wired the fuel (Flop) pickup tube just to make myself happy.

You thought I was only working on an aircraft project... not likely!!!
' style=

Torque / Safety Wired

Torque / Safety Wired

' style=

Looking Good!!!

Looking Good!!!

' style=

This weighs a TON!!!

This weighs a TON!!!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.