KitLog pro

Powered By Kitlog Pro v2.0

My RV-10
' style=
Date:  3-2-2010
Number of Hours:  1.50
Manual Reference:  Sec. 7-6 DWG 16A
Brief Description:  Sealed Rib / Fabricated Vent Line

Sealed the rivet heads on all the innner ribs.
Positioned and drilled the fuel sending BNC connection using the unibit.
Cut and straightened the fuel vent line. Test fit for proper alignment.
Fabricated the 18 GA wire for the capacitance fuel sending plate and sealed the connector.
Modified / Installed the inner gromments to allow the 18 GA wire to pass through, along with the vent tube.
' style=

Sealed Rivets

Sealed Rivets

' style=

Vent Line / Fillet

Vent Line / Fillet

' style=

Fuel inlet / Vent Line

Fuel inlet / Vent Line

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.