Powered By Kitlog Pro v2.0
John (Jack) Clark's Web Site
RV-8A
Landing Gear
50 Logs Found
Date
Hours
Work Log Summary
Details
08-26-2012
1.0
Set Nose Wheel Breakout Force
Details
08-24-2012
1.0
Fabricated Pull Attachment for Setting Breakout
Details
12-22-2011
0.5
Installed the Anti-Splat Stiffener on Nose Gear Le
Details
12-20-2011
3.3
Drilled the Nose Gear Retaining Bolt Hole
Details
12-19-2011
1.5
Split the Right Wheel Fairing
Details
12-19-2011
3.0
Put the Nose Gear Together
Details
12-18-2011
1.5
Right Lower Intersection Fairing Glassed
Details
12-16-2011
0.3
Taped the Fairing Mold to Keep Clay from Sticking
Details
12-15-2011
4.0
Fabricated Right Lower Intersection Fairing
Details
12-14-2011
4.0
Separated the Left Wheel Fairing Halves
Details
12-14-2011
0.5
Re-checked the Rt Gear Leg Fairing Position
Details
12-13-2011
3.0
Glassed the Left Lower Intersection Fairing
Details
12-12-2011
1.5
Trimmed the Left Intersection Fairing Some More
Details
12-11-2011
2.5
Trimmed and Shaped Lt Intersection Fairing
Details
12-09-2011
2.5
Carved/Shaped the Left Lower Intersection Fairing
Details
12-07-2011
1.5
Applied Clay to Left Wheel Fairing Intersection
Details
12-06-2011
2.5
Checked Left Gear Leg Fairing after Installation
Details
12-05-2011
3.0
Sanded and Shaped the Left Gear Leg Stiffener
Details
12-04-2011
3.0
Finished Riveting the Leg Gear Fairing Hinges
Details
12-03-2011
1.5
Riveted Half of Leg Fairing Hinges
Details
12-02-2011
3.0
Removed the Hinges from the Leg Fairings
Details
12-01-2011
0.5
Right Leg Fairing Too Tight After Glass Applicatio
Details
11-30-2011
5.0
Shaved and Sanded the Stiffeners to Fit the Fairin
Details
11-29-2011
0.3
Checked the Right Leg Fairing Alignment
Details
11-28-2011
3.0
Bonded a Leg Stiffener to the Right Leg
Details
11-27-2011
1.0
Confirmed Leg Fairing Alignment with a String
Details
11-26-2011
0.0
Attempting to Level the Gear Leg Fairing - 2
11-26-2011
1.5
Attempting to Level the Gear Leg Fairing
Details
11-25-2011
2.5
Riveted the U-808 Brackets to the Wheel Fairing
Details
11-24-2011
2.5
Fit and Drilled the Right Wheel Fairing
Details
11-23-2011
2.5
Drilled and Clecoed Left Wheel Fairing to U-810
Details
11-22-2011
2.5
Fit the Aft Half of the Left Wheel Pant to the Whe
Details
11-21-2011
3.0
Fit the Aft Half of the Right Wheel Pant to the Wh
Details
11-20-2011
2.5
Drilled Wheel Pants Halves Attachment Holes
Details
11-19-2011
2.0
Fitted Left Wheel Pant Halves Together
Details
11-18-2011
2.0
Fitted Two Halves of a Wheel Fairing Together
Details
11-17-2011
0.5
Trimmed the Rough Edges of the Glass Layups
Details
11-16-2011
2.0
Carved Excess Epoxy Flox from Fairings
Details
11-15-2011
0.5
Applied Epoxy Flox to the Tongue of the Fairings
Details
11-14-2011
2.0
Finished the Fairing Hinges Installation
Details
11-08-2011
3.5
Cut Clearances in the Fairings for the Brake Lines
Details
11-07-2011
1.0
Cut Template for the Main Gear Fairings from Plans
Details
11-04-2011
1.0
Installed the Right Main Wheel
Details
11-02-2011
2.0
Installed the Left Main Wheel
Details
11-01-2011
0.5
Installed Wheel onto a Rim
Details
10-31-2011
1.0
Installed First Tire on a Wheel
Details
10-30-2011
4.0
Mounted the Brakes and Wheels on Gear Axels
Details
10-28-2011
1.0
Corrosion Treated and Primed Wheel Fairing Mounts
Details
10-27-2011
1.5
Made U-408 Spacers and Assembled Brake Parts
Details
10-26-2011
2.5
Installed the Landing Gear Legs
Details
SITE NAVIGATION
Contact Builder
RV-8A Home
All
Avionics
Brakes
Canopy
Cooling System
Cowling
Electrical System
Empennage
Engine
Fiberglass
Finishing Kit
Flight Control Syste
Forward Baggage Comp
Forward Top Skin
Fuel System
Fuselage
Heating System
Interior
Landing Gear
Lighting
Miscellaneous
None
Oxygen System
Painiting
Painting
Prop
Sensors
Ventilation
Windscreen
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.