KitLog pro

Powered By Kitlog Pro v2.0

John (Jack) Clark's Web Site
152 Logs Found 
 Date
Hours
Work Log Summary

Details

 08-31-2012
0.8
Adjusted the Heights of the Starboard Switch Panel
Details
     

 08-29-2012
2.0
Laced Forward Baggage Compartment Wires
Details
       

 06-19-2012
2.0
Re-installed Battery Tray and Connected Cables
Details
       

 06-09-2012
1.5
Re-connected Aft Electrical Wiring to VP CU
Details
       

 06-04-2012
2.0
Removed the Battery Tray and Secured Cables
Details
       

 06-01-2012
1.0
Installed Repaired Verical Power Control Unit
Details

 05-19-2012
1.0
Installed Molex MX-150L Socket in Lt Mid Fuselage
Details
     

 05-18-2012
1.0
Installed 3 Position Molex Socket Rt Mid Fuselage
Details
       

 05-17-2012
1.5
Installed a Molex MX-150L Socket in Fuselage Wall
Details
       

 03-25-2012
2.0
Installed the Blue Sea Sockets and Plugs
Details
       

 03-25-2012
0.0
External View of the Charger Connections
Details
       

 03-24-2012
3.0
Fabricated Doublers for the External Charger Plugs
Details
     

 02-09-2012
2.5
Installed Two Engine Grounds to the Firewall
Details
       

 02-09-2012
0.5
Attached Fat Ground to the Firewall
Details
       

 02-08-2012
1.0
Attached the Fat Ground to the Firewall
Details
       

 02-07-2012
4.0
Attached Avionic Grounds and Fuel Pumps' Ground
Details
       

 02-06-2012
2.0
Ran the Fuel Pump Grounds to the Forrest of Tabs
Details
       

 02-05-2012
2.5
Secured Ground Wires in Forward Cabin
Details
     

 01-09-2012
1.5
Made a Copper Bar to Attach Starter Relay to ANL
Details
     

 01-03-2012
0.3
Attached the Forrest of Tabs to the Firewall
Details
     

 12-28-2011
2.0
Riveted Fat Wire Firewall Pass Through to Firewall
Details
       

 12-27-2011
0.5
Drilled Holes for the Fat Wire Firewall Pass Throu
Details

 09-04-2011
1.0
Ran Cowl Flap Power Wire to Throttle Area
Details

 08-28-2011
1.0
Installed a Stud Grounding Block on the Brace
Details
     

 08-23-2011
1.0
Connected Cowl Flap Wire to the Autopilot Terminal
Details

 08-20-2011
2.0
Ran Panel Dimmer Source Grounds to the Terminal
Details

 08-02-2011
0.5
Moved the avionics terminal bar down 3/4".
Details

 06-11-2011
2.0
Wired the Engine Critical Power CommonTerminal
Details
     

 04-02-2011
1.5
Checked and Corrected Heater Fan Wiring
Details

 03-09-2011
2.0
Linked the Forward Grounds Together
Details
       

 03-08-2011
2.0
Re-routed Starter Cable Through Floor Rib
Details
       

 02-20-2011
1.0
Wired the Heater Fan to the Switch
Details
       

 01-16-2011
4.0
Used Hangers to Finish the Switch Panel Wiring
Details
       

 01-15-2011
6.0
Wired the Switch Panel on the Fwd Rt Side
Details
       

 01-03-2011
2.0
Re-routed switch panel wires from the panel
Details
       

 01-02-2011
3.0
Wired the Switches of the Rt Forward Switch Panel
Details
       

 12-17-2010
1.5
Made Hangers for the Bundles in Aft Lt Mid Section
Details
     

 12-12-2010
1.5
Installed Wiring Hangers in the Aft Section
Details
       

 12-11-2010
2.0
Installed Split Conduit on Aft Section Wire Bundle
Details
       

 12-10-2010
2.0
Drilled a Tail Light Hole Through the Aft Bulkhead
Details
       

 11-18-2010
1.5
Re-routed #6 Cable to the Aft Power Terminal
Details
       

 11-13-2010
3.0
Secured Wires of the Left Side
Details
       

 11-13-2010
4.0
Laced the Wires of the Left Side
Details
       

 11-12-2010
3.0
Re-laced the Right Side Wires that Needed It
Details
       

 11-12-2010
1.0
Changed the Heater Fan Switch Installation
Details
       

 11-08-2010
1.5
Organized Forward Right Cabin Wires
Details
       

 11-07-2010
2.0
Organized the Wires/Cables of Rt Fwd Cabin Floor
Details
       

 11-07-2010
1.5
Installed a Backup Fuselage Ground Wire
Details
     

 11-06-2010
3.0
Installed Switches in the Fwd Right Switch Panel
Details
       

 11-04-2010
2.5
Ran Battery Backup Wires From the Right Aft Side
Details
       

 08-23-2010
2.0
Installed the Light Assembly in the Left Tip
Details
       

 08-21-2010
1.0
Fitted the Light Assembly to the Right Tip
Details
       

 08-20-2010
5.0
Worked on the Installation of the Tip Lights
Details
       

 08-18-2010
1.5
Started the Installation of the Tip Lights
Details
     

 05-10-2010
0.5
Re-Installed the Heater
Details

 05-08-2010
2.0
Re-wired heater with Molex Pins and Plugs
Details
       

 04-27-2010
1.0
Powered up the Vertical Power System
Details
     

 04-20-2010
1.5
Re- laced wires of the CU that were removed
Details

 04-19-2010
0.3
Tested VP CU Serial Cables with the buzzer

 04-18-2010
4.6
Tested VP CU Plugs/Pins for correct wiring
Details

 04-17-2010
1.0
Assembled a circuit tester for the VP wiring
Details
       

 04-02-2010
1.0
Secured ground cable in the mid-cabin
Details

 03-28-2010
2.0
Installled Conduit under the Front Throttle Mount
Details
       

 03-23-2010
1.0
Laced wires of the Left Mid Fuselage Floor
Details
       

 03-21-2010
2.0
Laced the wires along the right side, aft to front
Details
       

 03-21-2010
1.0
Laced the wires along the right side, aft to front
Details
       

 03-20-2010
1.5
Fixed wiring conflict with Flap Position Sensor
Details
       

 03-19-2010
1.0
Made #8 Power Cable to Aft Terminal Block
Details
       

 03-19-2010
1.5
Finished J-7 plug
Details
       

 03-18-2010
2.0
Finished wiring the J-7 Plug
Details
     

 03-16-2010
1.0
Put pins on the J-7 Pins 31, 32, 34 and 35
Details

 03-15-2010
1.0
Ran another power wire for the cowl flap control
Details
     

 03-02-2010
1.5
Started wiring the J-7 plug on the CU
Details
       

 02-28-2010
4.0
Ran spare switch wires from CU to behind panel
Details

 02-26-2010
1.0
Connected Flap Position Sensor wires to Cable
Details
       

 02-25-2010
1.5
Laced wires around the VP CU
Details
       

 02-24-2010
0.8
Ran Flap Position Sensor Cable to the VP CU
Details

 02-21-2010
7.0
Laces starter cable wires and CU wires
Details
       

 02-20-2010
4.0
Finished wiring grips' terminal
Details
       

 02-16-2010
1.0
Wired Servo outputs from the terminal strip
Details
       

 02-13-2010
0.3
Ran Front Stick Ground to Aft Ground Terminal
Details
       

 02-13-2010
3.8
Installed the Grips terminal strip
Details
       

 02-09-2010
2.5
Re-wired the Front/Aft grips at the terminal strip
Details
       

 02-08-2010
8.0
Wired the Front and Aft Grips together
Details
       

 02-07-2010
2.0
Mounted the stick grips' terminal strip
Details
       

 02-06-2010
1.5
Connected a 12 and 6 terminal strips together
Details

 02-03-2010
1.5
Ran Control Sticks' cable aft to VP CU
Details

 01-31-2010
6.0
Wired the Aft Stick Grip
Details
       

 01-30-2010
0.0
Ring used to guide wires around the grip boss
Details
     

 01-30-2010
10.0
Installed Infinity grip on Front Stick
Details
       

 01-26-2010
1.0
Ran 14 ga seat heater wire from Fused terminal
Details
     

 01-21-2010
1.5
Drilled mount and added Platenuts for Aft Terminal
Details
       

 01-17-2010
3.0
Fabricated a mount for the Aft Fused Terminal
Details
       

 01-17-2010
1.0
Crimped pins on Switch Panel plug wires
Details
     

 01-04-2010
1.0
Ran Remote Starter Switch wire from VP CU
Details

 01-01-2010
3.5
Ran the E-Bus Power for the VP CU
Details
       

 01-01-2010
0.5
Ran Ground Wires from VP CU
Details
     

 12-30-2009
2.0
Made cables for the Aft Ground Terminal Block
Details
       

 12-28-2009
2.5
Fabrication/Installation Aft Grounding Block Mount
Details
       

 12-20-2009
2.0
Made Cables from Contactor to Bus Block
Details
       

 12-16-2009
1.0
Fabricated/Installed the Bus Block Mount
Details
       

 12-16-2009
1.0
Fabricated/Installed the Bus Block Mount
Details
       

 12-15-2009
2.0
Bundled forward cabin wires
Details
       

 12-12-2009
3.5
Started bundling the VP CU wires
Details
       

 12-09-2009
1.5
Put shellbacks on the CU serial cables
Details
     

 12-06-2009
1.0
Running VP CU wires
Details
       

 12-06-2009
1.0
Running VP CU wires
Details
       

 12-06-2009
1.0
Ran wires for the J-4 and J-5 plugs
Details
       

 12-05-2009
3.5
Ran wires from the J-3 and J-6 VP CU plugs
Details
       

 12-03-2009
1.0
Electrical planning
Details

 12-01-2009
1.0
Finished wiring VP CU plugs
Details

 11-28-2009
1.8
Put d-sub connector on the aft SP cable
Details
       

 11-25-2009
2.0
Put d-sub connector on the aft end of the DU Cable
Details
       

 11-22-2009
1.0
Ran wires from VP CU to Flap Motor
Details
       

 11-22-2009
2.0
Ran wires from the Vertical Power Control Unit
Details
       

 11-21-2009
1.5
Attached Adel clamp mounting angles to floor ribs
Details
       

 11-19-2009
1.5
Ran wires for the Backup A & B switches
Details

 11-11-2009
0.0
To Disney for 5 days

 11-08-2009
3.0
Wired plugs of the VP CU

 11-07-2009
3.0
Continued to make VP CU Bundles
Details
     

 11-04-2009
1.5
Made wires for a Vertical Power Plug
Details

 10-29-2009
3.0
Made a new #6 cable for run from Battery to VP
Details
       

 10-28-2009
2.5
Adjusted Starter cable run
Details
       

 10-28-2009
1.0
Added Terminal to Starter Cable at Contactor
Details
       

 10-26-2009
2.0
Called Van's and talked to Joe about fat cable run
Details

 10-25-2009
2.5
Ran the Essential Engine Aux wires up left side
Details
       

 10-24-2009
4.0
Ran Engine Main (Always Hot) Wires up Left Side
Details
       

 10-22-2009
1.5
Put miniature d-sub connector on the roll trim cab
Details
       

 10-22-2009
1.5
Fashioned a miniature d-sub connector for roll tri
Details
       

 10-20-2009
1.0
Tested d-sub pins on the trim 26ga wires
Details

 10-07-2009
1.5
Wired most of the J-5 and started J-6 Plug
Details
     

 10-06-2009
1.5
Finished J-4 plug except for Ground Wire
Details
     

 10-05-2009
2.0
Wired the J-3 & 3/4 of J-4 VP Plugs
Details

 10-04-2009
1.0
Crimped connectors to the flap power wires
Details
       

 09-09-2009
2.0
Measured wiring lengths for the VP loadsheet
Details

 08-16-2009
10.0
Started VP Load Planning Sheet
Details

 07-04-2009
2.0
Put PIGD Push-on terminals on Aux Fuse Block
Details
     

 07-03-2009
1.0
Ran a #6AWG Tefzel Cable to the VP CU
Details

 07-01-2009
1.5
Ran #8AWG Tefzel cable to the Fuse Blocks
Details

 06-29-2009
2.5
Mounted the Vertical Power Control Unit
Details
       

 06-29-2009
1.0
Installed the fuse blocks in the aft fuselage
Details
       

 06-25-2009
1.0
Mounted the battery tray into the fuselage
Details
       

 06-22-2009
2.0
Made and attached 2 ground cables to the tray
Details
     

 06-21-2009
4.0
Finished making positive cables for battery tray
Details
       

 06-20-2009
3.0
Attached 200A ANL holders to platforms
Details
       

 06-19-2009
1.5
Riveted the ANL fuse holder platform together
Details
       

 06-17-2009
1.0
Re-painted the battery hold downs
Details

 06-15-2009
2.5
Mounted battery contactors/Made ANL mounts
Details
     

 06-14-2009
2.0
Mounted Battery Tray Ground Bus Bar
Details
       

 06-13-2009
3.0
Made Spacers for the hold-down bolts
Details
       

 06-12-2009
2.0
Riveted the K1000-426 nutplates on battery tray
Details

 06-11-2009
1.0
Drilled 1/4" holes in the battery tray
Details











Copyright © 2001-2013 Matronics. All Rights Reserved.