RV-8A
Electrical System
152 Logs Found
Date
Hours
Work Log Summary
Details
08-31-2012
0.8
Adjusted the Heights of the Starboard Switch Panel
Details
08-29-2012
2.0
Laced Forward Baggage Compartment Wires
Details
06-19-2012
2.0
Re-installed Battery Tray and Connected Cables
Details
06-09-2012
1.5
Re-connected Aft Electrical Wiring to VP CU
Details
06-04-2012
2.0
Removed the Battery Tray and Secured Cables
Details
06-01-2012
1.0
Installed Repaired Verical Power Control Unit
Details
05-19-2012
1.0
Installed Molex MX-150L Socket in Lt Mid Fuselage
Details
05-18-2012
1.0
Installed 3 Position Molex Socket Rt Mid Fuselage
Details
05-17-2012
1.5
Installed a Molex MX-150L Socket in Fuselage Wall
Details
03-25-2012
2.0
Installed the Blue Sea Sockets and Plugs
Details
03-25-2012
0.0
External View of the Charger Connections
Details
03-24-2012
3.0
Fabricated Doublers for the External Charger Plugs
Details
02-09-2012
2.5
Installed Two Engine Grounds to the Firewall
Details
02-09-2012
0.5
Attached Fat Ground to the Firewall
Details
02-08-2012
1.0
Attached the Fat Ground to the Firewall
Details
02-07-2012
4.0
Attached Avionic Grounds and Fuel Pumps' Ground
Details
02-06-2012
2.0
Ran the Fuel Pump Grounds to the Forrest of Tabs
Details
02-05-2012
2.5
Secured Ground Wires in Forward Cabin
Details
01-09-2012
1.5
Made a Copper Bar to Attach Starter Relay to ANL
Details
01-03-2012
0.3
Attached the Forrest of Tabs to the Firewall
Details
12-28-2011
2.0
Riveted Fat Wire Firewall Pass Through to Firewall
Details
12-27-2011
0.5
Drilled Holes for the Fat Wire Firewall Pass Throu
Details
09-04-2011
1.0
Ran Cowl Flap Power Wire to Throttle Area
Details
08-28-2011
1.0
Installed a Stud Grounding Block on the Brace
Details
08-23-2011
1.0
Connected Cowl Flap Wire to the Autopilot Terminal
Details
08-20-2011
2.0
Ran Panel Dimmer Source Grounds to the Terminal
Details
08-02-2011
0.5
Moved the avionics terminal bar down 3/4".
Details
06-11-2011
2.0
Wired the Engine Critical Power CommonTerminal
Details
04-02-2011
1.5
Checked and Corrected Heater Fan Wiring
Details
03-09-2011
2.0
Linked the Forward Grounds Together
Details
03-08-2011
2.0
Re-routed Starter Cable Through Floor Rib
Details
02-20-2011
1.0
Wired the Heater Fan to the Switch
Details
01-16-2011
4.0
Used Hangers to Finish the Switch Panel Wiring
Details
01-15-2011
6.0
Wired the Switch Panel on the Fwd Rt Side
Details
01-03-2011
2.0
Re-routed switch panel wires from the panel
Details
01-02-2011
3.0
Wired the Switches of the Rt Forward Switch Panel
Details
12-17-2010
1.5
Made Hangers for the Bundles in Aft Lt Mid Section
Details
12-12-2010
1.5
Installed Wiring Hangers in the Aft Section
Details
12-11-2010
2.0
Installed Split Conduit on Aft Section Wire Bundle
Details
12-10-2010
2.0
Drilled a Tail Light Hole Through the Aft Bulkhead
Details
11-18-2010
1.5
Re-routed #6 Cable to the Aft Power Terminal
Details
11-13-2010
3.0
Secured Wires of the Left Side
Details
11-13-2010
4.0
Laced the Wires of the Left Side
Details
11-12-2010
3.0
Re-laced the Right Side Wires that Needed It
Details
11-12-2010
1.0
Changed the Heater Fan Switch Installation
Details
11-08-2010
1.5
Organized Forward Right Cabin Wires
Details
11-07-2010
2.0
Organized the Wires/Cables of Rt Fwd Cabin Floor
Details
11-07-2010
1.5
Installed a Backup Fuselage Ground Wire
Details
11-06-2010
3.0
Installed Switches in the Fwd Right Switch Panel
Details
11-04-2010
2.5
Ran Battery Backup Wires From the Right Aft Side
Details
08-23-2010
2.0
Installed the Light Assembly in the Left Tip
Details
08-21-2010
1.0
Fitted the Light Assembly to the Right Tip
Details
08-20-2010
5.0
Worked on the Installation of the Tip Lights
Details
08-18-2010
1.5
Started the Installation of the Tip Lights
Details
05-10-2010
0.5
Re-Installed the Heater
Details
05-08-2010
2.0
Re-wired heater with Molex Pins and Plugs
Details
04-27-2010
1.0
Powered up the Vertical Power System
Details
04-20-2010
1.5
Re- laced wires of the CU that were removed
Details
04-19-2010
0.3
Tested VP CU Serial Cables with the buzzer
04-18-2010
4.6
Tested VP CU Plugs/Pins for correct wiring
Details
04-17-2010
1.0
Assembled a circuit tester for the VP wiring
Details
04-02-2010
1.0
Secured ground cable in the mid-cabin
Details
03-28-2010
2.0
Installled Conduit under the Front Throttle Mount
Details
03-23-2010
1.0
Laced wires of the Left Mid Fuselage Floor
Details
03-21-2010
2.0
Laced the wires along the right side, aft to front
Details
03-21-2010
1.0
Laced the wires along the right side, aft to front
Details
03-20-2010
1.5
Fixed wiring conflict with Flap Position Sensor
Details
03-19-2010
1.0
Made #8 Power Cable to Aft Terminal Block
Details
03-19-2010
1.5
Finished J-7 plug
Details
03-18-2010
2.0
Finished wiring the J-7 Plug
Details
03-16-2010
1.0
Put pins on the J-7 Pins 31, 32, 34 and 35
Details
03-15-2010
1.0
Ran another power wire for the cowl flap control
Details
03-02-2010
1.5
Started wiring the J-7 plug on the CU
Details
02-28-2010
4.0
Ran spare switch wires from CU to behind panel
Details
02-26-2010
1.0
Connected Flap Position Sensor wires to Cable
Details
02-25-2010
1.5
Laced wires around the VP CU
Details
02-24-2010
0.8
Ran Flap Position Sensor Cable to the VP CU
Details
02-21-2010
7.0
Laces starter cable wires and CU wires
Details
02-20-2010
4.0
Finished wiring grips' terminal
Details
02-16-2010
1.0
Wired Servo outputs from the terminal strip
Details
02-13-2010
0.3
Ran Front Stick Ground to Aft Ground Terminal
Details
02-13-2010
3.8
Installed the Grips terminal strip
Details
02-09-2010
2.5
Re-wired the Front/Aft grips at the terminal strip
Details
02-08-2010
8.0
Wired the Front and Aft Grips together
Details
02-07-2010
2.0
Mounted the stick grips' terminal strip
Details
02-06-2010
1.5
Connected a 12 and 6 terminal strips together
Details
02-03-2010
1.5
Ran Control Sticks' cable aft to VP CU
Details
01-31-2010
6.0
Wired the Aft Stick Grip
Details
01-30-2010
0.0
Ring used to guide wires around the grip boss
Details
01-30-2010
10.0
Installed Infinity grip on Front Stick
Details
01-26-2010
1.0
Ran 14 ga seat heater wire from Fused terminal
Details
01-21-2010
1.5
Drilled mount and added Platenuts for Aft Terminal
Details
01-17-2010
3.0
Fabricated a mount for the Aft Fused Terminal
Details
01-17-2010
1.0
Crimped pins on Switch Panel plug wires
Details
01-04-2010
1.0
Ran Remote Starter Switch wire from VP CU
Details
01-01-2010
3.5
Ran the E-Bus Power for the VP CU
Details
01-01-2010
0.5
Ran Ground Wires from VP CU
Details
12-30-2009
2.0
Made cables for the Aft Ground Terminal Block
Details
12-28-2009
2.5
Fabrication/Installation Aft Grounding Block Mount
Details
12-20-2009
2.0
Made Cables from Contactor to Bus Block
Details
12-16-2009
1.0
Fabricated/Installed the Bus Block Mount
Details
12-16-2009
1.0
Fabricated/Installed the Bus Block Mount
Details
12-15-2009
2.0
Bundled forward cabin wires
Details
12-12-2009
3.5
Started bundling the VP CU wires
Details
12-09-2009
1.5
Put shellbacks on the CU serial cables
Details
12-06-2009
1.0
Running VP CU wires
Details
12-06-2009
1.0
Running VP CU wires
Details
12-06-2009
1.0
Ran wires for the J-4 and J-5 plugs
Details
12-05-2009
3.5
Ran wires from the J-3 and J-6 VP CU plugs
Details
12-03-2009
1.0
Electrical planning
Details
12-01-2009
1.0
Finished wiring VP CU plugs
Details
11-28-2009
1.8
Put d-sub connector on the aft SP cable
Details
11-25-2009
2.0
Put d-sub connector on the aft end of the DU Cable
Details
11-22-2009
1.0
Ran wires from VP CU to Flap Motor
Details
11-22-2009
2.0
Ran wires from the Vertical Power Control Unit
Details
11-21-2009
1.5
Attached Adel clamp mounting angles to floor ribs
Details
11-19-2009
1.5
Ran wires for the Backup A & B switches
Details
11-11-2009
0.0
To Disney for 5 days
11-08-2009
3.0
Wired plugs of the VP CU
11-07-2009
3.0
Continued to make VP CU Bundles
Details
11-04-2009
1.5
Made wires for a Vertical Power Plug
Details
10-29-2009
3.0
Made a new #6 cable for run from Battery to VP
Details
10-28-2009
2.5
Adjusted Starter cable run
Details
10-28-2009
1.0
Added Terminal to Starter Cable at Contactor
Details
10-26-2009
2.0
Called Van's and talked to Joe about fat cable run
Details
10-25-2009
2.5
Ran the Essential Engine Aux wires up left side
Details
10-24-2009
4.0
Ran Engine Main (Always Hot) Wires up Left Side
Details
10-22-2009
1.5
Put miniature d-sub connector on the roll trim cab
Details
10-22-2009
1.5
Fashioned a miniature d-sub connector for roll tri
Details
10-20-2009
1.0
Tested d-sub pins on the trim 26ga wires
Details
10-07-2009
1.5
Wired most of the J-5 and started J-6 Plug
Details
10-06-2009
1.5
Finished J-4 plug except for Ground Wire
Details
10-05-2009
2.0
Wired the J-3 & 3/4 of J-4 VP Plugs
Details
10-04-2009
1.0
Crimped connectors to the flap power wires
Details
09-09-2009
2.0
Measured wiring lengths for the VP loadsheet
Details
08-16-2009
10.0
Started VP Load Planning Sheet
Details
07-04-2009
2.0
Put PIGD Push-on terminals on Aux Fuse Block
Details
07-03-2009
1.0
Ran a #6AWG Tefzel Cable to the VP CU
Details
07-01-2009
1.5
Ran #8AWG Tefzel cable to the Fuse Blocks
Details
06-29-2009
2.5
Mounted the Vertical Power Control Unit
Details
06-29-2009
1.0
Installed the fuse blocks in the aft fuselage
Details
06-25-2009
1.0
Mounted the battery tray into the fuselage
Details
06-22-2009
2.0
Made and attached 2 ground cables to the tray
Details
06-21-2009
4.0
Finished making positive cables for battery tray
Details
06-20-2009
3.0
Attached 200A ANL holders to platforms
Details
06-19-2009
1.5
Riveted the ANL fuse holder platform together
Details
06-17-2009
1.0
Re-painted the battery hold downs
Details
06-15-2009
2.5
Mounted battery contactors/Made ANL mounts
Details
06-14-2009
2.0
Mounted Battery Tray Ground Bus Bar
Details
06-13-2009
3.0
Made Spacers for the hold-down bolts
Details
06-12-2009
2.0
Riveted the K1000-426 nutplates on battery tray
Details
06-11-2009
1.0
Drilled 1/4" holes in the battery tray
Details
SITE NAVIGATION
Contact Builder
RV-8A Home
All
Avionics
Brakes
Canopy
Cooling System
Cowling
Electrical System
Empennage
Engine
Fiberglass
Finishing Kit
Flight Control Syste
Forward Baggage Comp
Forward Top Skin
Fuel System
Fuselage
Heating System
Interior
Landing Gear
Lighting
Miscellaneous
None
Oxygen System
Painiting
Painting
Prop
Sensors
Ventilation
Windscreen
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.