Builder:
  Anthony Jolly
Location:
  Carthage, MS - US
Aircraft:
  RV-7
Total Build Hours:
  178
Web Site:
  http://www.mykitlog.com/agjolly/

Date:  05-22-2020
Number of Hours:  6.00
Short Description:  Right & Left Elevator

Right Elevator - Trimmed counter weight. Will need to final trim after final installation and paint; finished riveting all of the right elevator; rolled and blind riveted the leading edge, added blind rivets between the other rivets in the outer leading edge roll to pull everything together.

Left Elevator - Match drilled spar doublers; deburred spar; beveled the top edge of the leading edge skin.




Right Elevator

Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Peter Calley
Sling4
06-05
2191
David Lewis
RV10
06-04
2567
Don Johnson
RV-8
06-04
178
James Roberts
RV8
06-04
90
John Peck
C120
06-04
330
Rick McBride
RV-10
06-04
1627
Ronald Cardwell
RV-8
06-04
801
Taran Laval
RV-7
06-04
470
Chris King
Fokker D.VII
06-03
1606
Darrel Watson
S7 Super Sport
06-03
1871
Des Howson
Sling 2 Taildragger
06-03
2248
Mike Mitchell
RV-14A
06-03
54
Thomas Ferranti
RV7
06-03
218
Carl Orton
750 Cruzer
06-02
600
Greg Long
RV-12
06-02
1290
Martin Filiatrault
RV-8
06-02
2607
Norris Brown
RV10
06-02
1158
Phil Risley
RV9
06-02
1096
Robert Lussow
RV-10
06-02
2621
Tom Brackx
7 Speedster
06-01
346
Lance W. Miller
CH650
05-31
203
Mark Weitkamp
CX4
05-31
1600
Jay Johnson
CH-750 Cruzer
05-30
1946
Andrey Piskarev
Highlander
05-29
1251
John McGlynn
S-19
05-29
261
Edward Beam
RV-14A
05-27
436
James Chadwick
RV-7
05-27
386
matt pryor
CH-650B
05-27
163
Bob Corriveau
RV-8
05-26
1623
Darrin Towers
CH 750 STOL
05-26
373

Projects Uploaded: 1483
Logs Uploaded: 258315








Copyright © 2001-2020 Matronics. All Rights Reserved. Privacy Policy.