Powered By Kitlog Pro v2.0
Long Ez: Building a Dream
Long Ez
Landing Brake
13 Logs Found
Date
Hours
Work Log Summary
Details
08-01-2012
1.3
The final layup
Details
08-01-2012
0.3
Sanding and fitting
Details
07-30-2012
2.5
Glassing the cover
Details
07-29-2012
0.0
Designing the actuator cover 2
Details
07-29-2012
3.5
Designing the actuator cover
Details
07-24-2012
1.0
Glassing the bracket
Details
07-22-2012
0.5
Perfect on the first try!
Details
07-21-2012
2.0
LB Mounting block floxed
Details
07-18-2012
1.3
Mounting Plate design
Details
07-16-2012
2.0
Landing brake install
Details
07-14-2012
2.0
Electric Landing brake install
Details
05-23-2012
0.5
Removing Landing brake ply tab
Details
04-15-2012
1.0
Removing the manual landing brake hardware
Details
SITE NAVIGATION
Contact Builder
Long Ez Home
All
Avionics
Canard
Canopy
Control System
Electrical System
Elevators
Finishing
Firewall
Fuel system
Fuse Exterior
Fuselage
Instrument Panel
Landing Brake
Main Landing Gear
Nose and Nose gear
Plans
Shop Supplies
Spar
Strakes
The Beginning
Throttle
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.