KitLog pro

Powered By Kitlog Pro v2.0

Long Ez: Building a Dream
45 Logs Found 
 Date
Hours
Work Log Summary

Details

 05-29-2013
0.5
Torque tube bearing install
Details
     

 02-19-2013
1.0
Roll trim titanium is in
Details
       

 02-15-2013
0.5
Better than expected!
Details
       

 02-12-2013
0.0
Roll Trim rolls on 2
Details
       

 02-12-2013
25.0
Roll Trim rolls on
Details
       

 01-13-2013
2.0
Final Controls install
Details
       

 12-16-2012
0.5
Rudder conduit glass reinforcements
Details
       

 12-09-2012
3.0
Aileron torque tube routing
Details
       

 12-08-2012
3.5
Rudder conduits
Details
       

 11-07-2012
0.3
Final Trim wheel install. hooray!
Details
       

 11-06-2012
5.5
Pitch trim wheel finishing
Details
       

 11-04-2012
5.5
Pitch trim wheel installed
Details
     

 11-03-2012
0.0
Pitch trim wheel construction 3
Details
       

 11-03-2012
0.0
Pitch trim wheel construction 2
Details
       

 11-03-2012
8.2
Pitch trim wheel construction 1
Details
       

 11-01-2012
8.0
Pitch trim wheel
Details
       

 10-28-2012
4.0
A new idea brewing
Details
     

 10-17-2012
2.5
Roll Trim Success
Details
       

 10-15-2012
4.0
Roll Trim woes
Details
       

 10-07-2012
7.0
Roll Trim 95% complete
Details
       

 10-04-2012
1.0
Roll Trim
Details
     

 08-06-2012
1.5
Elevator pushrods
Details
       

 08-02-2012
2.0
Fine tuning
Details
       

 07-28-2012
1.0
Elevator connection
Details
     

 07-25-2012
1.0
Glassing the brackets
Details
       

 07-23-2012
1.0
Controls and consoles assembly
Details
       

 07-22-2012
5.0
Floxing the brackets
Details
       

 07-21-2012
5.5
Controls have arrived!
Details
       

 06-23-2012
1.0
Stick grip lookin good
Details
       

 06-15-2012
3.5
A new grip
Details
       

 06-05-2012
2.0
Shaping the stick grip
Details
       

 05-24-2012
2.0
Elevator Trim adjusted
Details
       

 05-22-2012
1.0
Glassing the Throttle grip
Details
     

 05-17-2012
6.0
An unsuccessful evening
Details
     

 05-16-2012
8.5
Installing pitch trim system
Details
       

 05-16-2012
1.5
Cutting out acces to pitch trim lever
Details
       

 05-15-2012
1.5
Roll trim construction
Details
     

 05-15-2012
3.5
Pitch trim glass and metal work
Details
       

 05-15-2012
3.0
Making a custom throttle grip
Details
       

 05-12-2012
1.0
Roll trim construction
Details
       

 05-11-2012
1.0
Trial fit of trim system to fuselage
Details
       

 05-10-2012
1.5
Trial assembly of elev. trim system
Details
       

 05-10-2012
1.5
Polishing Trim lever
Details
     

 05-10-2012
1.0
Control system brackets
Details
       

 05-03-2012
1.0
Control system brackets
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.