KitLog pro

Powered By Kitlog Pro v2.0

Long Ez: Building a Dream
14 Logs Found 
 Date
Hours
Work Log Summary

Details

 06-16-2013
0.5
Glassing the lines
Details
     

 06-15-2013
0.0
Brake Line, Pee line, and other good stuff 2
Details
       

 06-15-2013
6.0
Brake Line, Pee line, and other good stuff
Details
       

 06-10-2013
4.0
Brakes lines and fittings
Details
       

 06-08-2013
8.0
Installing the Main Wheels/ brakes etc.
Details
       

 05-20-2013
0.0
Wheels, brakes, brake line prep 2
Details
       

 05-20-2013
8.0
Wheels, brakes, brake line prep
Details
       

 01-19-2013
0.5
Left Axle holes re-drilled
Details
     

 01-13-2013
1.0
Main gear bolts installed
Details
     

 01-09-2013
2.0
Tire woes
Details
     

 12-09-2012
1.5
Removing the axles
Details
       

 12-07-2012
0.5
Tire and Tube install
Details
     

 10-07-2012
0.5
Test Fit and Install
Details
       

 04-12-2012
0.5
Loctite
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.