Powered By Kitlog Pro v2.0
Long Ez: Building a Dream
Long Ez
Main Landing Gear
14 Logs Found
Date
Hours
Work Log Summary
Details
06-16-2013
0.5
Glassing the lines
Details
06-15-2013
0.0
Brake Line, Pee line, and other good stuff 2
Details
06-15-2013
6.0
Brake Line, Pee line, and other good stuff
Details
06-10-2013
4.0
Brakes lines and fittings
Details
06-08-2013
8.0
Installing the Main Wheels/ brakes etc.
Details
05-20-2013
0.0
Wheels, brakes, brake line prep 2
Details
05-20-2013
8.0
Wheels, brakes, brake line prep
Details
01-19-2013
0.5
Left Axle holes re-drilled
Details
01-13-2013
1.0
Main gear bolts installed
Details
01-09-2013
2.0
Tire woes
Details
12-09-2012
1.5
Removing the axles
Details
12-07-2012
0.5
Tire and Tube install
Details
10-07-2012
0.5
Test Fit and Install
Details
04-12-2012
0.5
Loctite
Details
SITE NAVIGATION
Contact Builder
Long Ez Home
All
Avionics
Canard
Canopy
Control System
Electrical System
Elevators
Finishing
Firewall
Fuel system
Fuse Exterior
Fuselage
Instrument Panel
Landing Brake
Main Landing Gear
Nose and Nose gear
Plans
Shop Supplies
Spar
Strakes
The Beginning
Throttle
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.