Long Ez: Building a Dream
Long Ez
Nose and Nose gear
58 Logs Found
Date
Hours
Work Log Summary
Details
05-20-2013
0.5
New Paint
Details
04-13-2013
1.5
The final layup!
Details
04-09-2013
0.8
Trimming the glass
Details
04-08-2013
0.0
Underside Nose Glass 2
Details
04-08-2013
5.5
Underside Nose Glass
Details
03-11-2013
1.2
Knife trim and more BID tape
Details
03-10-2013
3.0
Interior Bid Tape
Details
03-09-2013
2.0
Re-Attaching the nose piece
Details
03-08-2013
0.0
Door finishing and anchor nuts 2
Details
03-08-2013
3.0
Door finishing and anchor nuts
Details
03-06-2013
1.0
More Filler
Details
03-05-2013
1.0
Hatch Door Install
Details
03-04-2013
2.5
Final prep and paint
Details
03-03-2013
1.0
Floxing the Hinge in place
Details
03-02-2013
1.8
Hatch door sand and prep for hinge
Details
03-02-2013
0.0
Glass, Flox, Filler and paint 2
Details
03-02-2013
2.0
Glass, Flox, Filler and paint
Details
03-01-2013
0.0
Hinge and Filler 2
Details
03-01-2013
3.5
Hinge and Filler
Details
02-26-2013
2.0
Hatch door headaches
Details
02-25-2013
0.8
Hatch Hinge
Details
02-24-2013
0.0
More Hatch and Pedal work 2
Details
02-24-2013
7.0
More Hatch and Pedal work
Details
02-23-2013
0.3
Hatch and Pedals 2
Details
02-23-2013
7.0
Hatch and Pedals
Details
02-22-2013
2.0
More Glass work
Details
02-20-2013
6.0
Rudder Pedals
Details
02-20-2013
3.0
Nose hatch prepped for glass
Details
02-19-2013
1.0
Trimmed up
Details
02-17-2013
10.5
Interior glass work
Details
02-16-2013
0.0
Nose Hatch Construction 2
Details
02-16-2013
7.0
Nose Hatch Construction
Details
02-15-2013
0.0
Back to the nose 2
Details
02-15-2013
3.5
Back to the nose
Details
01-28-2013
4.0
Glassing the Nose
Details
01-19-2013
1.0
Fickle
Details
01-05-2013
3.0
Final nose shaping
Details
01-03-2013
3.5
Shaping the nose
Details
01-02-2013
3.0
shaping the nose
Details
01-01-2013
3.5
X30 and carving the nose
Details
12-31-2012
2.0
Hologram f14
Details
12-30-2012
0.0
Building up the nose 3
Details
12-30-2012
0.0
Building up the nose 2
Details
12-30-2012
6.0
Building up the nose
Details
12-16-2012
1.0
NG3 Bolt through
Details
12-07-2012
0.0
FInal adjustments and install 2
Details
12-07-2012
4.5
FInal adjustments and install
Details
12-06-2012
0.0
Installing the strut and actuator 2
Details
12-06-2012
3.5
Installing the strut and actuator
Details
12-03-2012
3.0
Floxing the assembly
Details
12-02-2012
2.0
Paint
Details
11-08-2012
5.0
Wiring the Nose lift
Details
10-22-2012
1.0
Test fit and smile
Details
10-21-2012
6.0
Test fitting the actuator etc..
Details
10-20-2012
4.0
Ez Nose Lift
Details
10-14-2012
3.0
Out with the old, in with the new
Details
06-06-2012
2.0
Time for a Nose Job 2
Details
05-31-2012
2.5
Time for a Nose Job
Details
SITE NAVIGATION
Contact Builder
Long Ez Home
All
Avionics
Canard
Canopy
Control System
Electrical System
Elevators
Finishing
Firewall
Fuel system
Fuse Exterior
Fuselage
Instrument Panel
Landing Brake
Main Landing Gear
Nose and Nose gear
Plans
Shop Supplies
Spar
Strakes
The Beginning
Throttle
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.