Powered By Kitlog Pro v2.0
Long Ez: Building a Dream
Long Ez
Canopy
74 Logs Found
Date
Hours
Work Log Summary
Details
06-16-2013
2.5
Turtle Deck interior Carbon
Details
06-10-2013
2.0
Turtle deck interior sanding
Details
06-08-2013
0.0
Glassing the turtle Deck 2
Details
06-08-2013
6.0
Glassing the turtle Deck
Details
06-06-2013
0.0
Turtle Deck work 2
Details
06-06-2013
5.0
Turtle Deck work
Details
05-31-2013
4.0
Rear turtle deck install
Details
05-22-2013
0.5
Rear turtle deck begins
Details
05-20-2013
1.5
Let's get it even better.
Details
05-20-2013
1.0
Latch trim
Details
04-30-2013
1.0
Strippin it
Details
04-29-2013
1.0
Oops be MORE gone
Details
04-27-2013
1.5
oops be gone
Details
04-14-2013
2.0
trimming and glass
Details
04-13-2013
1.5
Aft glass work
Details
04-12-2013
0.0
Glassing the hardpoints 2
Details
04-12-2013
4.0
Glassing the hardpoints
Details
04-10-2013
0.0
Hardpoints installed 2
Details
04-10-2013
4.0
Hardpoints installed
Details
04-09-2013
2.5
Preliminary Gas Spring locations
Details
04-05-2013
2.0
Re-installing the goods
Details
04-03-2013
4.5
Nothin Special
Details
03-30-2013
9.0
4 plies underneath
Details
03-28-2013
3.0
Redesign
Details
03-27-2013
3.5
Hardpoints made and floxed in
Details
03-25-2013
0.0
Canopy Pins located and tested 2
Details
03-25-2013
3.0
Canopy Pins located and tested
Details
03-24-2013
2.5
Hinge point glass
Details
03-23-2013
4.5
Carbon and Glass all over
Details
03-19-2013
6.5
Frame prep for glass
Details
03-18-2013
2.5
Frame foam
Details
03-17-2013
3.0
First Canopy Test
Details
03-15-2013
3.0
Hinge Hardpoint and tape line
Details
03-12-2013
0.5
Canopy test fit on hinges
Details
03-12-2013
2.5
Cam Lock Pin holes drilled
Details
03-10-2013
2.0
Rotary Cam Locks
Details
03-09-2013
0.0
Carving Foam and latch hardpoints 2
Details
03-09-2013
6.5
Carving Foam and latch hardpoints
Details
03-08-2013
0.3
Canopy placement
Details
03-05-2013
0.8
Hardpoint flox joint
Details
03-02-2013
2.5
Canopy Hinge installment
Details
02-25-2013
2.0
Canopy Hinge nutplates
Details
02-09-2013
2.0
Canopy line trimming
Details
02-09-2013
1.0
Canopy hinges
Details
02-03-2013
0.5
knife trimming
Details
02-02-2013
8.0
Carbon Canopy
Details
02-01-2013
2.0
Turtle deck design
Details
01-31-2013
0.4
knife trim
Details
01-30-2013
1.0
The Jury is in...
Details
01-30-2013
2.5
glassing the forward deck
Details
01-29-2013
3.0
More fitting and glassing
Details
01-29-2013
3.0
canopy removed and prepped
Details
01-27-2013
0.0
Turtle deck2
Details
01-27-2013
5.0
Turtle deck
Details
01-26-2013
3.0
Perfectionism is a curse
Details
01-25-2013
6.0
Canopy Hinge research
Details
01-23-2013
2.5
more sanding
Details
01-21-2013
7.0
Design and carving
Details
01-20-2013
0.0
Canopy Foam 2
Details
01-20-2013
9.0
Canopy Foam
Details
01-19-2013
3.0
Discoat and trial fit
Details
01-18-2013
0.5
more discoat
Details
01-17-2013
3.0
The canopy has landed
Details
01-12-2013
4.0
My Favorite position :)
Details
01-12-2013
3.0
.....record scratch...!!!!
Details
01-10-2013
4.0
Prep for canopy mounting
Details
01-09-2013
0.5
Discoat underside
Details
01-08-2013
2.5
Trimmed, cleaned, and coated
Details
01-07-2013
3.0
Time for plexiglass
Details
05-07-2012
1.0
Filling canopy access hole
Details
05-01-2012
1.0
Prep and dry micro the access hole
Details
04-30-2012
1.0
Glassing the Canopy hatch access hole
Details
04-27-2012
1.0
Filling the canopy access door
Details
04-14-2012
0.5
Removing the canopy access door
Details
SITE NAVIGATION
Contact Builder
Long Ez Home
All
Avionics
Canard
Canopy
Control System
Electrical System
Elevators
Finishing
Firewall
Fuel system
Fuse Exterior
Fuselage
Instrument Panel
Landing Brake
Main Landing Gear
Nose and Nose gear
Plans
Shop Supplies
Spar
Strakes
The Beginning
Throttle
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.