KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  7-14-2012
Number of Hours:  2.00
Manual Reference:  ch 9
Brief Description:  Electric Landing brake install

This will be a scratching my head project for sure. I've had to remove all the old manual hardware and will need to relocate the brackets accordingly with no directions to follow other than common sense. I've also decided to use Tinnerman washers and flat head screws on the entire outside surface of the aircraft. The screws shown will be replaced with stainless steel ones as flight hardware.
' style=

4

4" 150lb linear actuator (Firgelli)

' style=

trial fit showing a lot of work yet to be done

trial fit showing a lot of work yet to be done

' style=

Tinnerman washers

Tinnerman washers

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.