Date
|
Hours
|
Work Log Summary

|
Details

|
06-29-2010
|
5.00
|
Rebuild drive line 3 of 3
|
|
|
|
06-29-2010
|
5.00
|
Rebuild drive line 2 of 3
|
|
|
|
06-23-2010
|
5.00
|
Rebuild drive line 1 of 3
|
Details
|
|
|
07-20-2008
|
3.00
|
Change angle on Fork, more trail
|
Details
|
|
|
07-12-2008
|
5.00
|
Another Rear Axel Fix
|
Details
|
|
|
07-11-2008
|
3.00
|
Test ride faster
|
Details
|
|
|
07-11-2008
|
1.00
|
Repaired axel mount
|
Details
|
|
|
07-09-2008
|
4.00
|
Load it up and test ride
|
Details
|
|
|
07-08-2008
|
1.00
|
Assembled and test ride trailer
|
Details
|
 |
|
07-02-2008
|
1.00
|
Rear carrier
|
Details
|
|
|
06-09-2008
|
3.00
|
Paint, Clean, Weld
|
Details
|
|
|
05-29-2008
|
2.00
|
Sandblast, clean and prime
|
Details
|
|
|
04-02-2008
|
4.00
|
Cable and test ride
|
Details
|
|
|
04-01-2008
|
1.00
|
Lengthen pedal crank support
|
|
 |
|
03-31-2008
|
2.50
|
Handel bars and trim
|
Details
|
|
|
03-29-2008
|
2.00
|
Chain guide roller
|
Details
|
|
|
03-28-2008
|
2.00
|
Chain
|
Details
|
|
|
03-27-2008
|
1.00
|
Seat mounting
|
Details
|
|
|
03-27-2008
|
1.00
|
Seat Mounting
|
Details
|
|
|
03-26-2008
|
2.00
|
Seat work
|
Details
|
|
|
03-25-2008
|
2.00
|
Seat work
|
Details
|
|
|
03-23-2008
|
2.00
|
Make holes for mounting and split some tube
|
Details
|
|
|
03-23-2008
|
2.50
|
Made nylon chain rub blocks
|
Details
|
|
|
03-21-2008
|
1.00
|
Weld seat frame
|
Details
|
|
|
03-21-2008
|
2.50
|
Seat frame
|
Details
|
|
|
03-21-2008
|
1.00
|
Seat Frame
|
Details
|
|
|
03-19-2008
|
2.00
|
Shaped tubes for under seat
|
Details
|
|
|
03-17-2008
|
0.50
|
Shaped the seat pan plate
|
Details
|
 |
|
03-17-2008
|
2.00
|
Finished shock brace and started seat.
|
Details
|
|
|
03-16-2008
|
2.00
|
Reset height and modify brace for rear shock
|
Details
|
|
|
03-15-2008
|
1.00
|
Remove rear shock brace
|
Details
|
 |
|
02-27-2008
|
2.00
|
First time on wheels
|
Details
|
|
|
02-25-2008
|
0.50
|
Tack weld lugs for steering rod
|
Details
|
 |
|
02-21-2008
|
3.50
|
Make steering link
|
Details
|
|
|
02-19-2008
|
2.00
|
Cross brace for spring
|
Details
|
|
|
02-17-2008
|
0.50
|
Setup frame for welding
|
Details
|
|
|
02-17-2008
|
0.50
|
Setup frame for welding
|
Details
|
|
|
02-17-2008
|
1.00
|
Finish welding rear frame swing arm
|
Details
|
|
|
02-16-2008
|
1.00
|
Join swing arm to front frame 4 of 4
|
Details
|
|
|
02-16-2008
|
1.00
|
Join swing arm to front frame 3 of 4
|
Details
|
|
|
02-16-2008
|
1.00
|
Join swing arm to front frame 2 of 4
|
Details
|
|
|
02-16-2008
|
1.00
|
Join swing arm to front frame 1 of 4
|
Details
|
|
|
02-15-2008
|
2.00
|
Kids 20" off road donor bike
|
Details
|
|
|
02-13-2008
|
2.50
|
Assembly of front suspension
|
Details
|
|
|
02-09-2008
|
1.00
|
Cut and fit Front Springs
|
Details
|
|
|
02-05-2008
|
2.50
|
Making tool to clean up inside of fork tubes
|
Details
|
 |
|
02-01-2008
|
2.00
|
Weld outer fork tubes
|
Details
|
|
|
01-30-2008
|
2.50
|
Grind weld on inner, layout and cut outer forks
|
Details
|
|
|
01-28-2008
|
0.50
|
Weld fork tube inners
|
Details
|
 |
|
01-28-2008
|
1.00
|
Cut inner fork tubes down
|
Details
|
|
|
01-28-2008
|
1.00
|
Cut down steering pivot outer.
|
Details
|
|
|
01-27-2008
|
1.00
|
Modify steering so it will work.
|
Details
|
|
|
01-27-2008
|
1.00
|
Modify steering so it will work.
|
Details
|
|
|
01-26-2008
|
1.00
|
Welding idler cap
|
Details
|
|
|
01-26-2008
|
1.00
|
Tear down front forks
|
Details
|
|
|
01-26-2008
|
2.00
|
Clean up shop area
|
Details
|
|
|
01-26-2008
|
1.00
|
Cap end of deraillier
|
Details
|
|
|
01-25-2008
|
2.00
|
Getting the idler sproket ready
|
Details
|
|
|
01-25-2008
|
2.00
|
Getting the idler sproket ready
|
Details
|
|
|
01-24-2008
|
1.50
|
Prep Swing Arm and Idler Sprocket
|
Details
|
|
|
01-21-2008
|
2.50
|
Main frame small components
|
Details
|
|
|
01-21-2008
|
3.00
|
Finished sizing bushings on swing arm
|
Details
|
 |
|
01-20-2008
|
2.00
|
Seat post adjuster
|
Details
|
|
|
01-20-2008
|
2.00
|
Make up front derailleur post
|
Details
|
|
|
01-20-2008
|
2.00
|
Finish Derailleur post, begin seat adjuster
|
Details
|
|
|
01-19-2008
|
6.00
|
Made replacement pin for swing arm
|
Details
|
 |
|
01-18-2008
|
2.00
|
Bore swing arm
|
Details
|
|
|
01-17-2008
|
1.50
|
Tear down donor bike and bore bushings
|
Details
|
|
|
01-13-2008
|
1.83
|
Prep and weld main tube parts together
|
Details
|
|
|
01-13-2008
|
1.83
|
Prep and weld main tube parts together
|
Details
|
|
|
01-13-2008
|
1.83
|
Prep and weld main tube parts together
|
Details
|
|
|
01-11-2008
|
3.00
|
Steering / handelbar pivot
|
Details
|
|
|
01-10-2008
|
1.00
|
Steering pivot and seat post holes
|
Details
|
  |
|
01-09-2008
|
2.50
|
Made ends for seat brace & drilled HB pivot
|
Details
|
|
|
01-05-2008
|
2.50
|
Setup and machine steering stem
|
Details
|
|
|
01-05-2008
|
2.50
|
Machine steering stem hole
|
|
|
|
01-04-2008
|
2.50
|
Weld Rear Pivot Plates
|
Details
|
|
|
01-04-2008
|
2.50
|
Machine upright seatpost hole
|
Details
|
|
|
12-30-2007
|
3.00
|
Fabricate the Rear Pivot Plates.
|
Details
|
|
|
12-30-2007
|
3.00
|
Fabricate the Rear Pivot Plates
|
Details
|
|
|
12-28-2007
|
1.00
|
Weld slip pipe pedal crank housing
|
Details
|
|
|
12-28-2007
|
2.00
|
Fit main upright and make spacer
|
Details
|
|
|
12-28-2007
|
1.00
|
Cut main upright from old frame
|
Details
|
|
|
12-27-2007
|
0.50
|
Weld rear pivot
|
Details
|
|
|
12-27-2007
|
1.00
|
Prepare for welding
|
Details
|
|
|
12-27-2007
|
3.50
|
Prep on Slip Pipe for Pedal Crank.
|
Details
|
|
|
12-26-2007
|
3.00
|
Main Tube Machining
|
Details
|
|
|
12-26-2007
|
3.50
|
Machining rear suspension mount
|
Details
|
|
|
12-26-2007
|
1.50
|
Finish machining pivot hole
|
Details
|
 |
|
12-25-2007
|
3.00
|
Adjust main tube for flat
|
Details
|
|
|
12-24-2007
|
2.50
|
Weld Main Tube
|
Details
|
|
|
12-24-2007
|
2.50
|
Weld Main Tube
|
Details
|
|
|
11-19-2007
|
2.50
|
Layout and cut Main Frame Tube
|
Details
|
|
|
11-19-2007
|
0.60
|
Layout & cut Main Frame Tube
|
Details
|
|
|
11-19-2007
|
2.50
|
Cut Main Frame Tube
|
Details
|
|
|
11-19-2007
|
0.50
|
Bend Main Frame Tube
|
Details
|
 |
|
11-18-2007
|
2.00
|
Layout Main Frame Tube
|
Details
|
|
|
10-27-2007
|
2.00
|
Clean up cutoff parts
|
Details
|
|
|
10-26-2007
|
1.00
|
Cutoff parts of the frame
|
Details
|
|
|
10-25-2007
|
1.00
|
Cut off ears and grind pedal crank
|
Details
|
|
|
10-24-2007
|
1.00
|
Cut welds around pedal crank
|
Details
|
|
|
10-23-2007
|
2.00
|
Cut welds around pedal crank
|
Details
|
|
|
10-22-2007
|
3.00
|
Tear down
|
Details
|
 |
|
10-18-2007
|
1.00
|
Core for the Light Sport Recumbent
|
Details
|
|