KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
' style=
Date:  10-24-2007
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Cut welds around pedal crank

Finished cutting the pedal crank from the rear frame. Used small fibre wheels to finish cutting where I could. Ground some of the pedal crank barrel to clean it up. Need to remove the ears to finish the clean up.

The rear tubes need to be tuned back out. Hammering collapsed the tubes slightly but it is all fixable.
' style=

Finally got it free.

Finally got it free.

' style=

Need to open up the tube ends

Need to open up the tube ends

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.