Date
  | 
	Hours
  | 
	Work Log Summary 
		 
  | 
	Details 
		 
  | 
	
		
	
	 10-16-2018
  | 
	2.00
  | 
	FiberFrax fitting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-10-2018
  | 
	0.00
  | 
	Classic Aero Seats
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-06-2018
  | 
	2.00
  | 
	FW Titanium sheet
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-06-2018
  | 
	1.00
  | 
	Eyeball fitting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-03-2018
  | 
	1.00
  | 
	Firewall clamps
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-30-2018
  | 
	3.00
  | 
	Prepping for FW insulation
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-29-2018
  | 
	2.00
  | 
	Firewall stifferners
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-23-2018
  | 
	3.00
  | 
	Canopy bumpers
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-22-2018
  | 
	1.00
  | 
	Control Cable Penetrations
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-19-2018
  | 
	1.00
  | 
	Finished middle decks
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-16-2018
  | 
	1.00
  | 
	Oil separator and forest of tabs
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-15-2018
  | 
	2.00
  | 
	ANL fitting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-14-2018
  | 
	1.50
  | 
	Cable penetrations
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-12-2018
  | 
	1.00
  | 
	Firewall Insulation
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-11-2018
  | 
	2.00
  | 
	Final drilled the engine mount
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-11-2018
  | 
	1.00
  | 
	Battery case
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-10-2018
  | 
	1.50
  | 
	Fixing the wingtip countersinks
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-09-2018
  | 
	1.50
  | 
	Nav/strobe lights
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-09-2018
  | 
	1.00
  | 
	Fixing the wingtip countersinks
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-08-2018
  | 
	2.00
  | 
	Priming and riveting all over the place
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-01-2018
  | 
	1.00
  | 
	Squeezer removal
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-29-2018
  | 
	2.00
  | 
	Middle deck riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-29-2018
  | 
	1.00
  | 
	Cabin frame and F-732A channel
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-27-2018
  | 
	2.00
  | 
	Baggage floor cargo mat
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-26-2018
  | 
	0.10
  | 
	Reveal, La Fuselage !
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-26-2018
  | 
	1.00
  | 
	Middle deck
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-26-2018
  | 
	1.00
  | 
	Finishing the cabin frame
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-26-2018
  | 
	1.00
  | 
	Finishing F-787 Stiffener web
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-25-2018
  | 
	1.00
  | 
	Shoulder harness anchor attachments
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-25-2018
  | 
	1.50
  | 
	Finishing F-705 riveting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-23-2018
  | 
	1.50
  | 
	Started the finishing F-705 riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-22-2018
  | 
	3.00
  | 
	Top skin riveting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-21-2018
  | 
	3.00
  | 
	Top skin riveting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-20-2018
  | 
	3.00
  | 
	Top skin riveting
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-19-2018
  | 
	2.00
  | 
	Top skin riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-19-2018
  | 
	2.00
  | 
	Prep for top skin riveting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-19-2018
  | 
	1.00
  | 
	ELT antenna and Beacon
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-17-2018
  | 
	2.00
  | 
	Riveted seat panels II
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-17-2018
  | 
	0.00
  | 
	Assisted another builder
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-15-2018
  | 
	2.00
  | 
	Beacon stiffener
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-13-2018
  | 
	2.00
  | 
	Seat panels
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-11-2018
  | 
	1.00
  | 
	Static line adjustment
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-11-2018
  | 
	1.00
  | 
	Primed the beacon stiffener
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-11-2018
  | 
	1.00
  | 
	Beacon fitting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-08-2018
  | 
	1.00
  | 
	Tested new-old squeezer
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-06-2018
  | 
	1.50
  | 
	Primed the shortened console
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-05-2018
  | 
	1.00
  | 
	Tested rudder/tailspring clearance
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-02-2018
  | 
	2.00
  | 
	Console adjustment
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-01-2018
  | 
	1.00
  | 
	Avionics
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-29-2018
  | 
	2.00
  | 
	Wingtip lenses
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-26-2018
  | 
	0.00
  | 
	Vic Syracuse's talk at Oshkosh
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-26-2018
  | 
	0.00
  | 
	Ordered seats from Classic Aero Design while in Os
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-21-2018
  | 
	1.00
  | 
	Wingtip trailing edge adjustment 4
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-20-2018
  | 
	2.00
  | 
	Wingtip trailing edge adjustment 3
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-19-2018
  | 
	2.00
  | 
	Wingtip trailing edge adjustment 2
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-18-2018
  | 
	1.50
  | 
	Wingtip trailing edge adjustment 1
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-17-2018
  | 
	0.50
  | 
	Wingtip notes
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-16-2018
  | 
	2.00
  | 
	VOR antenna decision
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-15-2018
  | 
	2.00
  | 
	VOR antenna thinkering
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-14-2018
  | 
	1.00
  | 
	Wingtip riveting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-14-2018
  | 
	1.00
  | 
	Wingtip adjustments
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-07-2018
  | 
	1.00
  | 
	Upper rudder fairing  done
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-06-2018
  | 
	1.50
  | 
	Priming rudder and VS
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-05-2018
  | 
	0.50
  | 
	Oil cooler mounting option
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-04-2018
  | 
	2.00
  | 
	Primed the HS fairings
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-01-2018
  | 
	1.00
  | 
	HS fairings
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-24-2018
  | 
	3.00
  | 
	Priming with K36
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-21-2018
  | 
	1.00
  | 
	Wingtip-tip
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-17-2018
  | 
	3.00
  | 
	Fairing finishing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-16-2018
  | 
	2.00
  | 
	Fairing finishing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-15-2018
  | 
	2.00
  | 
	More Tail light fitting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-14-2018
  | 
	2.00
  | 
	Rudder/VS transition finishing up
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-13-2018
  | 
	2.00
  | 
	Rudder/VS transition perfectioningering…
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-12-2018
  | 
	1.00
  | 
	Rudder/VS transition perfecting…
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-12-2018
  | 
	1.00
  | 
	More Tail light fitting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-10-2018
  | 
	2.00
  | 
	Shaping the VS fairing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-09-2018
  | 
	1.00
  | 
	More Tail light fitting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-09-2018
  | 
	2.00
  | 
	Fitting of VS fairing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-09-2018
  | 
	1.00
  | 
	Fitting of VS fairing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-09-2018
  | 
	2.00
  | 
	Bottom rudder fairing adjustment
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-08-2018
  | 
	3.00
  | 
	Started Tail light fitting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-06-2018
  | 
	2.00
  | 
	Bottom rudder fairing glassing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-05-2018
  | 
	1.00
  | 
	Upper rudder fairing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-04-2018
  | 
	1.00
  | 
	Upper Rudder fairing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-03-2018
  | 
	2.00
  | 
	Wing tip hinge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-03-2018
  | 
	2.00
  | 
	Drilled the wingtip
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-02-2018
  | 
	3.00
  | 
	Started wing tips
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-02-2018
  | 
	1.50
  | 
	Elevator fairings
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-02-2018
  | 
	1.00
  | 
	Drilled left wing tip
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-31-2018
  | 
	0.10
  | 
	Grips for the stick
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-31-2018
  | 
	1.00
  | 
	Elevator fairings
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-30-2018
  | 
	1.50
  | 
	Elevator fairing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-29-2018
  | 
	2.00
  | 
	Elevator, HS and rudder fairings
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-28-2018
  | 
	2.00
  | 
	Rudder fairing cut out II
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-27-2018
  | 
	1.00
  | 
	Lower rudder fairing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-27-2018
  | 
	2.00
  | 
	Fixed rudder fairing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-27-2018
  | 
	1.00
  | 
	Drilled HS fairing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-26-2018
  | 
	3.00
  | 
	Elevator fairing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-23-2018
  | 
	1.50
  | 
	
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-13-2018
  | 
	1.50
  | 
	Installed the rear elevator pushrod
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-11-2018
  | 
	1.00
  | 
	Drilled out another  floor panel
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-08-2018
  | 
	1.50
  | 
	Drilled out a floor panel
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-07-2018
  | 
	2.00
  | 
	Lower empennage fairing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-06-2018
  | 
	2.00
  | 
	Empennage hardware
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-05-2018
  | 
	2.00
  | 
	Primed empennage attachment parts
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-04-2018
  | 
	3.00
  | 
	Rudder stop
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-03-2018
  | 
	1.50
  | 
	Elevator horns spacers
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-02-2018
  | 
	2.00
  | 
	Drilling vertical stabilizer - 6
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-01-2018
  | 
	2.00
  | 
	Drilling vertical stabilizer - 5
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-01-2018
  | 
	1.00
  | 
	Drilling vertical stabilizer - 4
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-01-2018
  | 
	2.00
  | 
	Drilling vertical stabilizer - 3
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-30-2018
  | 
	2.00
  | 
	Drilling vertical stabilizer - 2
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-30-2018
  | 
	2.00
  | 
	Drilling vertical stabilizer - 1
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-28-2018
  | 
	2.00
  | 
	SB 14-01-31 - 8
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-28-2018
  | 
	2.00
  | 
	Pitot access panel
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-27-2018
  | 
	2.00
  | 
	SB 14-01-31 - 7
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-26-2018
  | 
	3.00
  | 
	SB 14-01-31 - 6
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-23-2018
  | 
	1.00
  | 
	SB 14-01-31 - 5
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-22-2018
  | 
	1.00
  | 
	SB 14-01-31 - 4
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-22-2018
  | 
	2.00
  | 
	SB 14-01-31 - 3
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-21-2018
  | 
	1.00
  | 
	SB 14-01-31 - 2
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-21-2018
  | 
	2.00
  | 
	SB 14-01-31 - 1
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-19-2018
  | 
	1.50
  | 
	Elevator Horns 2
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-18-2018
  | 
	1.50
  | 
	Elevator Horns 1
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-16-2018
  | 
	0.50
  | 
	Elevator hinges
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-15-2018
  | 
	1.00
  | 
	Fitting the HS 4 - Second set of holes
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-15-2018
  | 
	1.00
  | 
	Fitting the HS 4 - Finishing up
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-15-2018
  | 
	0.50
  | 
	Fitting the HS 3 - First holes
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-15-2018
  | 
	0.50
  | 
	Fitting the HS 2 - Checking area to be drilled
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-15-2018
  | 
	2.00
  | 
	Fitting the HS 1 - Clamping in place
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-14-2018
  | 
	1.00
  | 
	Horizontal Stabilizer
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-09-2018
  | 
	0.50
  | 
	Now the wings are done
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-09-2018
  | 
	0.50
  | 
	Elevator trim tab hinge
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-08-2018
  | 
	4.00
  | 
	Finished the left wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-07-2018
  | 
	3.00
  | 
	Started the last wing skin riveting
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-05-2018
  | 
	2.00
  | 
	Brace for pitot wiring and stall warning wire
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-03-2018
  | 
	1.00
  | 
	
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-31-2018
  | 
	3.00
  | 
	Trim tab III
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-31-2018
  | 
	2.00
  | 
	
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-27-2018
  | 
	1.50
  | 
	Right wing outer bottom skin - 4
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-26-2018
  | 
	1.50
  | 
	Right wing outer bottom skin - 3
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-25-2018
  | 
	4.00
  | 
	Right wing outer bottom skin - 2
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-24-2018
  | 
	4.00
  | 
	Right wing outer bottom skin - 1
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-23-2018
  | 
	1.50
  | 
	Finishing Stall warning inspection cover
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-20-2018
  | 
	1.50
  | 
	Started stall warning inspection cover
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-20-2018
  | 
	1.00
  | 
	SB 16-03-28 - 3
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-19-2018
  | 
	1.00
  | 
	Elevator fairings
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-18-2018
  | 
	1.00
  | 
	SB 16-03-28 - 2
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-18-2018
  | 
	2.00
  | 
	SB 16-03-28 - 1
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-14-2018
  | 
	2.00
  | 
	Primed and painted the console
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-12-2018
  | 
	1.00
  | 
	Butchered the elevator trim tab
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-11-2018
  | 
	1.00
  | 
	Modified the elevator trim tab
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-10-2018
  | 
	2.00
  | 
	Primed and painted new tunnel cover
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-07-2018
  | 
	2.00
  | 
	New flap motor
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-11-2018
  | 
	4.00
  | 
	Decks in baggage area
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-10-2018
  | 
	3.00
  | 
	Remaining canopy rivets
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-10-2018
  | 
	3.00
  | 
	New tunnel cover
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-08-2018
  | 
	3.00
  | 
	New C-710 pushrod
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-05-2018
  | 
	1.00
  | 
	F-785A Backrest Brace and cross bar
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-04-2018
  | 
	4.00
  | 
	Deburred, primed and painted Almost RV-14
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-28-2018
  | 
	1.50
  | 
	Almost RV-14 install - 10
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-27-2018
  | 
	1.50
  | 
	Almost RV-14 install - 9
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-27-2018
  | 
	2.00
  | 
	Almost RV-14 install - 8
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-22-2018
  | 
	2.00
  | 
	Almost RV-14 install - 7
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-21-2018
  | 
	3.50
  | 
	Almost RV-14 install - 6
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-20-2018
  | 
	1.50
  | 
	Almost RV-14 install - 5
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-19-2018
  | 
	1.00
  | 
	Almost RV-14 install - 4
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-19-2018
  | 
	2.00
  | 
	Almost RV-14 install - 3
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-19-2018
  | 
	2.00
  | 
	Almost RV-14 install - 2
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-19-2018
  | 
	2.00
  | 
	Almost RV-14 install - 1
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-14-2018
  | 
	2.00
  | 
	Dimpled both bottom outboard skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-13-2018
  | 
	1.50
  | 
	Almost RV-14
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-12-2018
  | 
	1.00
  | 
	Riveted inspection cover nutplates
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-08-2018
  | 
	1.00
  | 
	Riveted the elevator pushrod
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-07-2018
  | 
	4.50
  | 
	Primed the outboard bottom skins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-06-2018
  | 
	2.00
  | 
	Primed the elevator pushrod
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-26-2017
  | 
	0.50
  | 
	Modified grommets
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-22-2017
  | 
	1.50
  | 
	Cut and drilled the elevator pushrod
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-20-2017
  | 
	2.00
  | 
	Aileron pushrod
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-18-2017
  | 
	1.00
  | 
	Finished the right inboard bottom skin
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 12-17-2017
  | 
	6.50
  | 
	Continue rivet the right inboard bottom skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-16-2017
  | 
	3.00
  | 
	Riveted on the right flap brace
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-16-2017
  | 
	1.00
  | 
	Drilled the armrest padding
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-14-2017
  | 
	0.50
  | 
	Riveted on nutplate on the flap brace
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 12-13-2017
  | 
	2.00
  | 
	Primed the right flap brace
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 12-12-2017
  | 
	1.00
  | 
	Made split hinge pins for flaps
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-11-2017
  | 
	3.00
  | 
	Drilled the right flap hinge
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-11-2017
  | 
	2.00
  | 
	Dimpling the right inboard bottom skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-10-2017
  | 
	1.50
  | 
	Drilled the right flap hinge
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-09-2017
  | 
	8.00
  | 
	Riveted on left inboard bottom skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-06-2017
  | 
	0.50
  | 
	Prosealed glare shield vents
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-06-2017
  | 
	1.00
  | 
	Added RTV to the conduits
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-04-2017
  | 
	0.50
  | 
	Prepping for skin riveting
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-03-2017
  | 
	2.50
  | 
	Dimpled left inboard bottom skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-02-2017
  | 
	2.50
  | 
	Riveted the bulkhead doubler
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-27-2017
  | 
	1.00
  | 
	Primed the bulkhead doubler
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-26-2017
  | 
	2.00
  | 
	Riveted the latch handle angles
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-26-2017
  | 
	1.50
  | 
	Installed pitot and AOA bulkhead fitting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-25-2017
  | 
	2.50
  | 
	Primed the inboard bottom skins
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-24-2017
  | 
	3.00
  | 
	Deburred the inboard bottom skins
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-11-2017
  | 
	1.50
  | 
	Finished the latch bearing and cover
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-06-2017
  | 
	0.50
  | 
	Continued the latch bearing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-05-2017
  | 
	1.50
  | 
	Continued the latch bearing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-04-2017
  | 
	1.50
  | 
	Started new latch bearing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-23-2017
  | 
	1.00
  | 
	Installed the latch handle and lock
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-21-2017
  | 
	2.00
  | 
	Painted the latch hardware
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-18-2017
  | 
	1.50
  | 
	Painted the lock guide hardware
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-17-2017
  | 
	2.00
  | 
	Shaped the lock guide hardware
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-16-2017
  | 
	1.00
  | 
	Riveted side skirts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-15-2017
  | 
	3.00
  | 
	Used the latch install template for lock install
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-14-2017
  | 
	2.00
  | 
	Sikaflexed the side skirts
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-14-2017
  | 
	2.00
  | 
	Made cover for the latch bearing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-13-2017
  | 
	1.00
  | 
	Started working on the canopy latch
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-11-2017
  | 
	1.50
  | 
	Finished the new latch bearing cover
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-04-2017
  | 
	1.00
  | 
	Engine arrives
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-30-2017
  | 
	2.50
  | 
	Cut opening for canopy lift tab
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-29-2017
  | 
	1.00
  | 
	Marked up slot for canopy lifting tab
  | 
	
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-22-2017
  | 
	8.00
  | 
	Engine assembly Day 2
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-21-2017
  | 
	8.00
  | 
	Engine assembly Day 1
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-19-2017
  | 
	2.00
  | 
	Primed the canopy side skirts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-17-2017
  | 
	3.00
  | 
	Finished the canopy skirts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-03-2017
  | 
	2.00
  | 
	Powder coated the grills
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-27-2017
  | 
	3.50
  | 
	Fitted and drilled the canopy side skirts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-23-2017
  | 
	1.00
  | 
	Made dies for grill forming
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-20-2017
  | 
	4.00
  | 
	Making the glare shield inlay
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-18-2017
  | 
	1.00
  | 
	Glare shield padding
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-15-2017
  | 
	1.50
  | 
	Made a delrin strip for the 2nd canopy latch
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-14-2017
  | 
	1.00
  | 
	Made slot for locking mechanism
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-14-2017
  | 
	1.00
  | 
	Adjusted the latch.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-13-2017
  | 
	1.00
  | 
	Test sanding sikaflex
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-13-2017
  | 
	4.00
  | 
	Installed canopy latch lug and guides
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-12-2017
  | 
	2.00
  | 
	Refining the sikaflex beads
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-12-2017
  | 
	2.00
  | 
	Creating glare shield template
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-11-2017
  | 
	4.00
  | 
	Sikaflexed in place
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-11-2017
  | 
	1.00
  | 
	Prepping for Sikaflex
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-10-2017
  | 
	3.00
  | 
	Final prep before Sikaflex day
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-09-2017
  | 
	3.00
  | 
	Masked and tested canopy clamping
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-08-2017
  | 
	2.00
  | 
	Painted the canopy frame
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-07-2017
  | 
	2.00
  | 
	Finished the canopy install angles
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 08-06-2017
  | 
	3.00
  | 
	Started canopy install angles
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-06-2017
  | 
	1.00
  | 
	Prepping the canopy frame
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-05-2017
  | 
	4.00
  | 
	Riveted on the front decks
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-05-2017
  | 
	2.00
  | 
	Glare shield smoothing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-04-2017
  | 
	1.00
  | 
	Finishing the canopy gaps
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-03-2017
  | 
	2.00
  | 
	Further smoothing the canopy gaps
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-02-2017
  | 
	2.50
  | 
	Smoothing canopy gaps
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-01-2017
  | 
	2.50
  | 
	Filling canopy gaps
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-31-2017
  | 
	1.50
  | 
	Strut anchors II
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-30-2017
  | 
	3.00
  | 
	Drilled the panel attach angles
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-29-2017
  | 
	6.00
  | 
	Canopy braces riveted
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-28-2017
  | 
	6.00
  | 
	Started riveting canopy skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-27-2017
  | 
	2.50
  | 
	Made openings for vent fans
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-20-2017
  | 
	2.00
  | 
	Vent fan mounting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-18-2017
  | 
	1.50
  | 
	Vent openings
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-17-2017
  | 
	1.00
  | 
	Vent openings
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-16-2017
  | 
	3.00
  | 
	Painted canopy frame
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-16-2017
  | 
	4.00
  | 
	Finished new the front decks
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-15-2017
  | 
	4.00
  | 
	New front decks
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-12-2017
  | 
	2.00
  | 
	Deburr and dimple canopy skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-11-2017
  | 
	2.00
  | 
	More canopy spacers
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-09-2017
  | 
	3.00
  | 
	Primed the canopy parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-08-2017
  | 
	4.00
  | 
	Drilled the canopy braces to the skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-07-2017
  | 
	2.00
  | 
	Drilling the canopy braces
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-03-2017
  | 
	1.00
  | 
	Started canopy braces
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-24-2017
  | 
	2.00
  | 
	Final shaping the canopy skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-17-2017
  | 
	0.50
  | 
	Red Cube
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-14-2017
  | 
	2.00
  | 
	Deburred the canopy frame
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-13-2017
  | 
	1.50
  | 
	Drilled the canopy skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-11-2017
  | 
	1.50
  | 
	Left canopy spacers
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-10-2017
  | 
	4.00
  | 
	Right canopy spacers
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-28-2017
  | 
	1.50
  | 
	Finished riveting the canopy frame
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-28-2017
  | 
	1.50
  | 
	Filling the canopy gaps step 2
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-28-2017
  | 
	4.50
  | 
	Filling the canopy gaps step 1
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-27-2017
  | 
	2.00
  | 
	Started figuring out side skirts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-26-2017
  | 
	2.50
  | 
	Canopy frame final drilling and riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-23-2017
  | 
	0.00
  | 
	Ordered new front decks
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-18-2017
  | 
	0.50
  | 
	Ball Stud Mount
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-17-2017
  | 
	1.50
  | 
	Trimming the canopy skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-16-2017
  | 
	2.00
  | 
	New canopy skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-16-2017
  | 
	2.00
  | 
	More trimming canopy
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-15-2017
  | 
	1.50
  | 
	Minor canopy adjustment
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-14-2017
  | 
	2.00
  | 
	Trimming aft window
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-14-2017
  | 
	3.00
  | 
	Further trimming of canopy
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-13-2017
  | 
	2.00
  | 
	The big cut
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-13-2017
  | 
	0.50
  | 
	Post cut pictures
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-13-2017
  | 
	4.00
  | 
	Canopy trimming
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-11-2017
  | 
	3.00
  | 
	Lady gotta new hat
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-09-2017
  | 
	2.00
  | 
	Lowered the fuselage cradle
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-08-2017
  | 
	1.00
  | 
	Strut hardware
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-07-2017
  | 
	2.00
  | 
	Put fuselage on cradle
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-07-2017
  | 
	3.00
  | 
	Avionics alternative
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-30-2017
  | 
	2.00
  | 
	Fuselage cradle
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-29-2017
  | 
	3.00
  | 
	Trimming canopy
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-28-2017
  | 
	1.00
  | 
	Prepping the canopy for trimming
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-26-2017
  | 
	1.50
  | 
	Primed and painted F-705 angles
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 04-23-2017
  | 
	2.00
  | 
	Strut hardware
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-23-2017
  | 
	2.00
  | 
	New F-705 angles
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-22-2017
  | 
	4.00
  | 
	Riveted forward decks
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-22-2017
  | 
	0.50
  | 
	Cabin looking finished
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-20-2017
  | 
	2.00
  | 
	Painted F-704
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-18-2017
  | 
	1.50
  | 
	Strut hardware
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-17-2017
  | 
	2.50
  | 
	Strut mounting hardware
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-17-2017
  | 
	1.00
  | 
	Riveted on the panel angles on the forward decks
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-16-2017
  | 
	2.00
  | 
	Replaced canopy skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-16-2017
  | 
	2.00
  | 
	Continued strut hardware
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-15-2017
  | 
	1.50
  | 
	Started strut hardware
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-14-2017
  | 
	1.50
  | 
	Pained the decks and canopy frame
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-13-2017
  | 
	3.00
  | 
	Primed frame and canopy deck
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-11-2017
  | 
	0.50
  | 
	Stripped canopy deck
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-09-2017
  | 
	1.00
  | 
	Checked the positioning of the canopy frame
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-08-2017
  | 
	1.00
  | 
	Riveted doublers and stiffeners to aft top skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-06-2017
  | 
	0.50
  | 
	Aft fuselage conduits
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-05-2017
  | 
	1.00
  | 
	Dimpled the canopy braces
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-05-2017
  | 
	1.50
  | 
	Dimpled the aft top skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-04-2017
  | 
	1.00
  | 
	Deburring canopy braces
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-02-2017
  | 
	1.00
  | 
	ELT doubler riveted
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-01-2017
  | 
	2.00
  | 
	Riveted the AHRS rib
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-31-2017
  | 
	2.50
  | 
	Primed and painted aft top skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-30-2017
  | 
	1.50
  | 
	Deburred the canopy braces
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-27-2017
  | 
	1.50
  | 
	Primed the click-bond areas
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-26-2017
  | 
	2.00
  | 
	Prepping Aft Top Skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-25-2017
  | 
	1.50
  | 
	Click-bond anchors
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-22-2017
  | 
	1.50
  | 
	
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-20-2017
  | 
	1.00
  | 
	Riveted the canopy frame sides
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-19-2017
  | 
	4.00
  | 
	Primed the canopy frame components
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-18-2017
  | 
	6.00
  | 
	Drilled the canopy frame
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-17-2017
  | 
	2.50
  | 
	Shaping the canopy frame
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-16-2017
  | 
	2.00
  | 
	Deburring the canopy frame
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-15-2017
  | 
	2.00
  | 
	Adjusted the canopy and skins for clearance
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-14-2017
  | 
	2.00
  | 
	Assembled the forward structure
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-13-2017
  | 
	1.50
  | 
	Riveting sub-structure
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-12-2017
  | 
	4.00
  | 
	Hinge block drilling
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-12-2017
  | 
	2.00
  | 
	Drilling hinges
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-08-2017
  | 
	2.00
  | 
	Hinge drilling strategy
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-07-2017
  | 
	2.00
  | 
	G3x GPS/XM antenna
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-04-2017
  | 
	1.50
  | 
	Panel angles
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-03-2017
  | 
	2.00
  | 
	Panel alignment
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-26-2017
  | 
	1.00
  | 
	Re-evaluate canopy hinges
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-25-2017
  | 
	2.00
  | 
	Canopy hinge drilling
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-19-2017
  | 
	3.00
  | 
	Primed decks and frame support parts
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-18-2017
  | 
	3.00
  | 
	Decks and F-704 covers
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-17-2017
  | 
	5.00
  | 
	Primed and paint day
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-16-2017
  | 
	1.00
  | 
	Test fitted the F-789 pushrod
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-16-2017
  | 
	2.00
  | 
	Deburring and prepping parts for priming
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-15-2017
  | 
	2.00
  | 
	Adjusted the co-pilot stick
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-14-2017
  | 
	1.00
  | 
	Started the F-789 elevator pushrod
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-13-2017
  | 
	1.00
  | 
	Vent line screws
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-13-2017
  | 
	1.00
  | 
	Elevator bell crank
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-12-2017
  | 
	1.00
  | 
	Shoulder harness cable
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-11-2017
  | 
	2.00
  | 
	Static line install and routing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-11-2017
  | 
	1.00
  | 
	GMU-22 harness and static line
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-08-2017
  | 
	2.00
  | 
	Exit brake line
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-06-2017
  | 
	1.50
  | 
	Booster pump to firewall fuel line
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-05-2017
  | 
	1.50
  | 
	Fuel line and parking brake doublers
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-04-2017
  | 
	1.00
  | 
	GMU-22 connector
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-04-2017
  | 
	0.50
  | 
	Checking rivet head clearance.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-03-2017
  | 
	1.00
  | 
	Garmin GPS antenna.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-03-2017
  | 
	1.50
  | 
	Drilled GPS antenna doubler
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-02-2017
  | 
	1.50
  | 
	Painting canopy release rods and delrin bearings
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-31-2017
  | 
	1.50
  | 
	Riveted panel angles
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-30-2017
  | 
	1.50
  | 
	Latch and panel angles
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-29-2017
  | 
	2.50
  | 
	Center panel painting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-29-2017
  | 
	1.00
  | 
	Cabin frame channel and more
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-28-2017
  | 
	2.00
  | 
	Fuel line support priming
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-27-2017
  | 
	2.00
  | 
	Canopy latch handle
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-26-2017
  | 
	1.50
  | 
	Forward fuselage channel replacement
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-22-2017
  | 
	2.00
  | 
	Canopy release mechanism
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-21-2017
  | 
	3.50
  | 
	Canopy hinge
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-20-2017
  | 
	2.00
  | 
	Canopy hinge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-19-2017
  | 
	1.50
  | 
	Canopy hinge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-18-2017
  | 
	2.00
  | 
	Sub-pane assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-17-2017
  | 
	2.00
  | 
	Fuel pump support
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-15-2017
  | 
	3.00
  | 
	Sub-pane assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-15-2017
  | 
	3.00
  | 
	Canopy latch handle
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-14-2017
  | 
	4.50
  | 
	Center Channel
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-13-2017
  | 
	1.00
  | 
	Center Channel
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-12-2017
  | 
	2.00
  | 
	Center Channel
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-11-2017
  | 
	1.50
  | 
	Canopy latch handle
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-10-2017
  | 
	2.50
  | 
	Canopy latch handle
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-09-2017
  | 
	2.00
  | 
	Static line routing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-08-2017
  | 
	3.00
  | 
	Fuel line routing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-07-2017
  | 
	3.00
  | 
	Cabin frame channel
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-06-2017
  | 
	2.00
  | 
	Canopy latch weldments
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-06-2017
  | 
	2.00
  | 
	Cabin frame mounting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-05-2017
  | 
	2.00
  | 
	Cabin frame mounting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-03-2017
  | 
	3.00
  | 
	Cabin frame trimming
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-02-2017
  | 
	3.00
  | 
	Cabin frame riveting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-01-2017
  | 
	2.00
  | 
	Cabin frame riveting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-31-2016
  | 
	3.50
  | 
	Cabin frame priming
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-30-2016
  | 
	1.50
  | 
	Rudder pedals
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-30-2016
  | 
	2.00
  | 
	Even more cabin frame
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-29-2016
  | 
	3.50
  | 
	Cabin frame
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-28-2016
  | 
	3.00
  | 
	Rudder pedal weldments
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-28-2016
  | 
	1.50
  | 
	Cabin frame
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-27-2016
  | 
	1.00
  | 
	Work bench renewal
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-27-2016
  | 
	2.00
  | 
	Cabin frame
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-26-2016
  | 
	1.50
  | 
	Cabin frame
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-25-2016
  | 
	1.50
  | 
	Forward fuselage ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-21-2016
  | 
	0.50
  | 
	Brake fluid reservoir
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-20-2016
  | 
	1.00
  | 
	Rudder pedals
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-19-2016
  | 
	1.00
  | 
	Rudder pedal
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-18-2016
  | 
	2.00
  | 
	Rudder pedal
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-17-2016
  | 
	0.00
  | 
	Fuel lines
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-17-2016
  | 
	2.00
  | 
	Firewall
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-15-2016
  | 
	1.00
  | 
	Rudder pedal
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-14-2016
  | 
	0.50
  | 
	Disassembled the rudder/brake pedals assembly,
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-14-2016
  | 
	0.00
  | 
	Andair replacement parts
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-13-2016
  | 
	2.00
  | 
	Sub-panel
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-12-2016
  | 
	1.50
  | 
	Fuel lines
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-11-2016
  | 
	8.00
  | 
	EAA electric workshop
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-10-2016
  | 
	8.00
  | 
	EAA electric workshop
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-09-2016
  | 
	2.50
  | 
	Cabin cover plates
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-08-2016
  | 
	1.00
  | 
	Cabin cover plates
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-05-2016
  | 
	2.00
  | 
	Finish kit is here
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-03-2016
  | 
	2.00
  | 
	Fuel selector valve plate
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-27-2016
  | 
	2.50
  | 
	Sub-panel
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-23-2016
  | 
	1.00
  | 
	Cabin center cover
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-21-2016
  | 
	1.50
  | 
	Cabin center cover
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-20-2016
  | 
	1.50
  | 
	Cabin center cover
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-19-2016
  | 
	2.00
  | 
	S-tube for fuel selector
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-17-2016
  | 
	1.00
  | 
	Fuel pump fitting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-16-2016
  | 
	0.50
  | 
	Fuel pump with cosmetic damage.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-12-2016
  | 
	1.00
  | 
	Fuselage cradle
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-09-2016
  | 
	1.50
  | 
	Fuselage cradle
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-07-2016
  | 
	1.50
  | 
	F-709 bulkhead
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-05-2016
  | 
	2.00
  | 
	Fuselage cradle
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-03-2016
  | 
	1.00
  | 
	Riveted the left baggage floor. Cabin looks done
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-01-2016
  | 
	0.50
  | 
	Storage space template
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-31-2016
  | 
	1.00
  | 
	Experimental decal and GMU-22 bracket
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-31-2016
  | 
	0.00
  | 
	Avionics Switches
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-30-2016
  | 
	1.50
  | 
	AHRS (or ELT) bracket fitted
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-29-2016
  | 
	2.00
  | 
	AHRS (or ELT) bracket priming
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-28-2016
  | 
	1.50
  | 
	AHRS (or ELT) bracket
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-26-2016
  | 
	0.50
  | 
	Cabin nearly done
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-23-2016
  | 
	1.50
  | 
	Right floor riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-22-2016
  | 
	1.50
  | 
	Finished seat hinges
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-21-2016
  | 
	1.00
  | 
	Riveted wear blocks
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-20-2016
  | 
	2.50
  | 
	Prosealed conduits
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-18-2016
  | 
	1.00
  | 
	Riveting cabin components
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-18-2016
  | 
	1.50
  | 
	Finished the storage space
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-18-2016
  | 
	0.00
  | 
	Break lines
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-16-2016
  | 
	2.00
  | 
	Conduits
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-09-2016
  | 
	1.00
  | 
	Heat valve
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-09-2016
  | 
	6.00
  | 
	Deburring and priming
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-08-2016
  | 
	3.00
  | 
	Tunnel cover
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-07-2016
  | 
	0.50
  | 
	Seat hinge pins
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-06-2016
  | 
	1.50
  | 
	Baggage floor and center channel
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-05-2016
  | 
	1.50
  | 
	Conduits anchors
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-04-2016
  | 
	2.00
  | 
	Brake lines
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-04-2016
  | 
	1.50
  | 
	Brake fluid reservoir
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-03-2016
  | 
	2.00
  | 
	Firewall components
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-02-2016
  | 
	1.00
  | 
	Stick boot rings
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-02-2016
  | 
	1.50
  | 
	Firewall components
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-01-2016
  | 
	2.50
  | 
	Flap actuator components
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-30-2016
  | 
	1.00
  | 
	Firewall components
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-28-2016
  | 
	1.00
  | 
	Storage space hinge
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-27-2016
  | 
	2.00
  | 
	New wear blocks
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-26-2016
  | 
	1.50
  | 
	Storage space lid
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-25-2016
  | 
	3.50
  | 
	Vent lines
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-24-2016
  | 
	1.50
  | 
	Flap actuator components
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-21-2016
  | 
	2.00
  | 
	Seat hinges
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-20-2016
  | 
	2.00
  | 
	Additional conduits
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-19-2016
  | 
	3.00
  | 
	Under floor storage
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-19-2016
  | 
	3.00
  | 
	Harness wear blocks
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-18-2016
  | 
	3.00
  | 
	Elevator bell cranks and baggage bulkhead
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-17-2016
  | 
	3.00
  | 
	Forward decks
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-16-2016
  | 
	2.00
  | 
	Replacing fuselage rivets
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-14-2016
  | 
	2.00
  | 
	Seats
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-13-2016
  | 
	0.50
  | 
	Static ports
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-13-2016
  | 
	2.00
  | 
	Fuselage gussets
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-12-2016
  | 
	1.50
  | 
	Seat distance plates
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-11-2016
  | 
	1.00
  | 
	Static ports
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-11-2016
  | 
	1.00
  | 
	ELT antenna doubler
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-11-2016
  | 
	3.00
  | 
	Aft fuselage top skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-09-2016
  | 
	3.00
  | 
	Aft fuselage skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-08-2016
  | 
	3.00
  | 
	Aft fuselage skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-07-2016
  | 
	2.00
  | 
	Aft fuselage skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-06-2016
  | 
	2.00
  | 
	Canopy sub structure
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-05-2016
  | 
	3.00
  | 
	Riveted  the aft deck.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-05-2016
  | 
	1.50
  | 
	Fuselage gussets
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-04-2016
  | 
	2.50
  | 
	F-695 drilling
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-03-2016
  | 
	3.50
  | 
	Making spacers and drilled the aft deck.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-02-2016
  | 
	2.00
  | 
	Flipping the canoe !
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-02-2016
  | 
	2.00
  | 
	Checking twist
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-30-2016
  | 
	1.50
  | 
	Rotisserie assembled
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-28-2016
  | 
	2.50
  | 
	Last of the fuselage riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-27-2016
  | 
	0.50
  | 
	Prepping for rotisserie
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-27-2016
  | 
	2.00
  | 
	Forward fuselage done
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-24-2016
  | 
	1.50
  | 
	Prepping for static ports
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-24-2016
  | 
	1.50
  | 
	Prepping for rotisserie
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-22-2016
  | 
	0.00
  | 
	Testing dimensions
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-22-2016
  | 
	0.50
  | 
	Main squeeze repair
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-22-2016
  | 
	2.00
  | 
	Armrest riveting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-21-2016
  | 
	3.00
  | 
	Finishing center section bottom skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-19-2016
  | 
	2.00
  | 
	Finishing up forward fuselage
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-16-2016
  | 
	2.50
  | 
	outboard seat ribs riveting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-16-2016
  | 
	0.00
  | 
	Holes pitot, AOA lines
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-15-2016
  | 
	0.00
  | 
	Looking at parts
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-15-2016
  | 
	1.00
  | 
	Armrest stiffeners riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-14-2016
  | 
	2.00
  | 
	Armrest painting
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-13-2016
  | 
	2.00
  | 
	Armrest stiffeners
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-12-2016
  | 
	2.00
  | 
	Armrest stiffeners
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-11-2016
  | 
	1.50
  | 
	F-711 replacement
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-10-2016
  | 
	2.50
  | 
	Sealing Firewall
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-09-2016
  | 
	2.00
  | 
	Lower longeron bolts
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-08-2016
  | 
	2.00
  | 
	Fuselage beatification
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-07-2016
  | 
	3.00
  | 
	Firewall sealant
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-06-2016
  | 
	4.00
  | 
	Fuselage riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-05-2016
  | 
	3.50
  | 
	Fuselage riveting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-04-2016
  | 
	1.50
  | 
	Started fuselage riveting
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-03-2016
  | 
	2.00
  | 
	Fuselage assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-02-2016
  | 
	3.50
  | 
	Fuselage assembly
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-02-2016
  | 
	0.50
  | 
	Countersink for double flush
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-30-2016
  | 
	3.50
  | 
	Forward fuselage riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-29-2016
  | 
	2.00
  | 
	Testing fit and NACA vent
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-24-2016
  | 
	0.00
  | 
	Taking a break
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-23-2016
  | 
	2.50
  | 
	Side skin dimpling and FW painting.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-22-2016
  | 
	3.50
  | 
	Bottom and side skin  prepping
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-21-2016
  | 
	1.50
  | 
	F-705 riveting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-19-2016
  | 
	2.50
  | 
	Center section
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-18-2016
  | 
	3.50
  | 
	Mounting outboard ribs
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-17-2016
  | 
	4.50
  | 
	Longeron priming and painting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-15-2016
  | 
	1.00
  | 
	F-710B angle tweak
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-15-2016
  | 
	2.00
  | 
	Antenna doubles
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-14-2016
  | 
	2.00
  | 
	Interior paint
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-13-2016
  | 
	1.00
  | 
	Vent line
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-13-2016
  | 
	1.00
  | 
	Antenna doubles
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-12-2016
  | 
	3.00
  | 
	Interior paint
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-11-2016
  | 
	2.00
  | 
	Side skin masking
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-10-2016
  | 
	4.00
  | 
	Priming fuselage components
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-08-2016
  | 
	2.50
  | 
	Priming fuselage components
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-04-2016
  | 
	3.50
  | 
	Fuselage disassembly
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-03-2016
  | 
	2.50
  | 
	Front fuselage
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-02-2016
  | 
	1.00
  | 
	Front fuselage
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-30-2016
  | 
	1.00
  | 
	Front fuselage
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-29-2016
  | 
	2.00
  | 
	Corner ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-28-2016
  | 
	1.00
  | 
	Brake cylinders
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-27-2016
  | 
	1.00
  | 
	Rudder pedal support
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-26-2016
  | 
	2.50
  | 
	Brake cylinders
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-25-2016
  | 
	2.00
  | 
	Rudder pedals
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-25-2016
  | 
	0.50
  | 
	Inside job
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-24-2016
  | 
	2.50
  | 
	Drilled replacement ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-19-2016
  | 
	3.00
  | 
	Undressing fuselage
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-17-2016
  | 
	2.00
  | 
	Corner rib needs replacement
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-14-2016
  | 
	2.50
  | 
	Corner rib tweaking
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-13-2016
  | 
	2.00
  | 
	Bottom skin fitting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-10-2016
  | 
	3.00
  | 
	F-717 lower longeron drilling
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-09-2016
  | 
	1.00
  | 
	F-684 gusset
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-07-2016
  | 
	2.50
  | 
	F-684 gusset
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-04-2016
  | 
	2.50
  | 
	F-902 Bulkhead
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-01-2016
  | 
	1.50
  | 
	F-717 lower longeron fitting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-30-2016
  | 
	2.00
  | 
	F-719 stiffener
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-28-2016
  | 
	2.00
  | 
	Firewall
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-28-2016
  | 
	0.50
  | 
	F-904 attach strips
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-26-2016
  | 
	2.00
  | 
	Firewall
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-24-2016
  | 
	3.00
  | 
	Longeron drilling front
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-23-2016
  | 
	2.00
  | 
	Longeron clearance
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-22-2016
  | 
	2.00
  | 
	Continued longeron drilling
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-21-2016
  | 
	2.00
  | 
	Started longeron drilling
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-20-2016
  | 
	2.00
  | 
	Conical bend
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-15-2016
  | 
	3.50
  | 
	Longeron fine adjustment
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-14-2016
  | 
	1.50
  | 
	Twisting longeron
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-14-2016
  | 
	3.50
  | 
	Forward decks
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-13-2016
  | 
	2.00
  | 
	Longeron bending
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-10-2016
  | 
	2.00
  | 
	Cabin floor
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-08-2016
  | 
	3.50
  | 
	Center section riveting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-07-2016
  | 
	3.50
  | 
	Center section riveting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-06-2016
  | 
	2.00
  | 
	Center section clecoing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-05-2016
  | 
	2.00
  | 
	Seat belt anchors painting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-05-2016
  | 
	0.50
  | 
	Antenna doubles grounding
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-01-2016
  | 
	0.50
  | 
	Jetflex WR
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-01-2016
  | 
	1.50
  | 
	Antenna doubles
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-30-2016
  | 
	2.50
  | 
	Antenna doubles grounding
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-30-2016
  | 
	1.00
  | 
	Antenna doubles fitting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-29-2016
  | 
	1.50
  | 
	Antenna doubles forming
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-24-2016
  | 
	3.50
  | 
	Center section riveting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-23-2016
  | 
	0.50
  | 
	Tail cone storage
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-23-2016
  | 
	2.50
  | 
	Fuselage riveting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-04-2016
  | 
	5.50
  | 
	Fuselage riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-03-2016
  | 
	1.00
  | 
	Crotch strap brackets nutplates
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-02-2016
  | 
	2.50
  | 
	Fuselage twist check
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-30-2016
  | 
	2.50
  | 
	Tail skin riveting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-28-2016
  | 
	1.50
  | 
	Rudder cable fairing nutplates
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-28-2016
  | 
	2.00
  | 
	Aft  bulkhead fitting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-28-2016
  | 
	0.50
  | 
	5 point harness
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-26-2016
  | 
	4.00
  | 
	Misc. parts priming
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-25-2016
  | 
	4.00
  | 
	Seat rib priming
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-25-2016
  | 
	2.00
  | 
	Rudder cable fairing alignment
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-22-2016
  | 
	1.50
  | 
	Rudder cable fairing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-20-2016
  | 
	0.50
  | 
	Electric Trim
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-19-2016
  | 
	3.00
  | 
	Seat belt brackets
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-18-2016
  | 
	0.50
  | 
	Tail spring bracket
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-18-2016
  | 
	2.00
  | 
	Corner ribs straps
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-16-2016
  | 
	1.00
  | 
	outboard seat rib fluting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-16-2016
  | 
	1.50
  | 
	Corner ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-15-2016
  | 
	2.50
  | 
	Center section assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-14-2016
  | 
	1.00
  | 
	Center section assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-13-2016
  | 
	1.00
  | 
	Static port drilling
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-13-2016
  | 
	1.00
  | 
	Seat rib tie-in spacers
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-13-2016
  | 
	2.50
  | 
	F-706 riveting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-12-2016
  | 
	2.50
  | 
	Aft fuselage skin dimpled
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-07-2016
  | 
	1.50
  | 
	Started seat ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-07-2016
  | 
	2.00
  | 
	New F-916C spacers
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-05-2016
  | 
	4.50
  | 
	Aft skin priming
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-04-2016
  | 
	2.00
  | 
	Tailwheel weldment wedge
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-04-2016
  | 
	1.50
  | 
	Tailwheel spring adjustment
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-04-2016
  | 
	2.00
  | 
	Checking twist
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-03-2016
  | 
	2.00
  | 
	Aft fuselage deburring
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-29-2016
  | 
	2.00
  | 
	Aft fuselage drilling
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-28-2016
  | 
	4.50
  | 
	Aft fuselage drilling
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-27-2016
  | 
	2.00
  | 
	J-channel fitting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-27-2016
  | 
	2.00
  | 
	F-706 part II
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-27-2016
  | 
	0.50
  | 
	Aft bottom skin done ?
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-26-2016
  | 
	1.50
  | 
	Tail skin adjustments
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-25-2016
  | 
	3.50
  | 
	F-711 part II
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-23-2016
  | 
	1.50
  | 
	Static line routing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-22-2016
  | 
	1.50
  | 
	J-channels
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-21-2016
  | 
	4.00
  | 
	F-705 deburring and priming
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-21-2016
  | 
	3.00
  | 
	Aft fuselage assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-20-2016
  | 
	1.00
  | 
	Mark cut out got tail spring
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-20-2016
  | 
	2.00
  | 
	Flap actuator bearings
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-19-2016
  | 
	1.00
  | 
	Tail bottom skin trimming
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-19-2016
  | 
	1.00
  | 
	Spar assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-19-2016
  | 
	2.00
  | 
	Fitting the tail bottom skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-19-2016
  | 
	1.00
  | 
	Destruction of parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-19-2016
  | 
	1.50
  | 
	Center section assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-19-2016
  | 
	1.50
  | 
	Bulk heads to bottom skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-18-2016
  | 
	1.50
  | 
	Seat back angles
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-14-2016
  | 
	2.00
  | 
	Seat back angles
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-14-2016
  | 
	2.00
  | 
	F-705 drilling
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-13-2016
  | 
	1.00
  | 
	Seat belt anchors
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-13-2016
  | 
	3.00
  | 
	Center section brackets
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-12-2016
  | 
	2.00
  | 
	Continued work on  the F-705.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-11-2016
  | 
	2.00
  | 
	F-706 Assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-11-2016
  | 
	2.00
  | 
	F-705 Part II
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-11-2016
  | 
	0.50
  | 
	Bulkheads done, nearly
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-10-2016
  | 
	2.00
  | 
	Riveted Bulkheads angles
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-09-2016
  | 
	2.00
  | 
	Started Bulkheads angles
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-08-2016
  | 
	2.00
  | 
	Center Section brackets and elevator bell crank
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-07-2016
  | 
	4.00
  | 
	Primed the bulkheads
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-07-2016
  | 
	1.00
  | 
	Prepped bulkhead for priming
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-07-2016
  | 
	1.00
  | 
	F-705 Bulkhead, the F-730 plate
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-06-2016
  | 
	2.00
  | 
	Longeron bending
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-06-2016
  | 
	2.00
  | 
	Assembled  elevator bell crank (F-635).
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-05-2016
  | 
	2.00
  | 
	Elevator Servo Bracket
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-02-2016
  | 
	2.00
  | 
	Bulkhead slots for longerons
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-01-2016
  | 
	1.00
  | 
	Started F-711 Bulkhead
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-01-2016
  | 
	0.50
  | 
	Started F-710 Bulkhead
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-01-2016
  | 
	1.00
  | 
	F-705 Drilling failure
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-31-2016
  | 
	6.00
  | 
	Started the F-706 bulkhead
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-31-2016
  | 
	1.50
  | 
	Assembled F-706 Bulkhead
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-30-2016
  | 
	5.50
  | 
	Started the bulkheads
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-26-2016
  | 
	3.00
  | 
	Riveted Firewall
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-23-2016
  | 
	4.00
  | 
	Started riveting the center section
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-22-2016
  | 
	2.00
  | 
	Test fitted the control column
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-20-2016
  | 
	2.00
  | 
	Trimmed the control column mounts
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-19-2016
  | 
	3.00
  | 
	Drilled the control column mounts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-18-2016
  | 
	2.00
  | 
	Made holes for cables in center section
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-17-2016
  | 
	3.00
  | 
	Priming of the firewall aluminum stiffeners
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-17-2016
  | 
	2.00
  | 
	Deburring of F-704 bulkhead parts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-16-2016
  | 
	2.00
  | 
	Deburred  firewall aluminum angles
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-13-2016
  | 
	0.50
  | 
	Got remaining fuselage parts
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-10-2016
  | 
	4.00
  | 
	Countersunk firewall parts
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-09-2016
  | 
	4.00
  | 
	Drilled firewall parts
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-09-2016
  | 
	2.00
  | 
	Brake line FW pass through stiffener
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-08-2016
  | 
	5.00
  | 
	Started firewall
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-07-2016
  | 
	1.00
  | 
	Flap hinge pin fastening nutplate
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-06-2016
  | 
	4.00
  | 
	Fuselage inventory continues
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-05-2016
  | 
	3.00
  | 
	Fuselage inventory
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-04-2016
  | 
	1.00
  | 
	Fuselage Kit Arrives
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-31-2015
  | 
	3.00
  | 
	Riveted right aileron brackets
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-31-2015
  | 
	2.00
  | 
	Aileron bracket adjustment
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-27-2015
  | 
	2.00
  | 
	Aileron brace for right wing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-25-2015
  | 
	1.00
  | 
	Flap brace for left wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-13-2015
  | 
	4.00
  | 
	Riveted Right top skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-05-2015
  | 
	2.00
  | 
	Wing Stand Support
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-29-2015
  | 
	4.00
  | 
	inboard upper skin riveted
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-20-2015
  | 
	1.00
  | 
	Baffle inspection
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-19-2015
  | 
	3.00
  | 
	Fuel tank baffle
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-05-2015
  | 
	4.00
  | 
	Proseal fuel tank components
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-23-2015
  | 
	4.00
  | 
	Riveted fuel tank
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-20-2015
  | 
	3.00
  | 
	Fuel tank ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-17-2015
  | 
	2.00
  | 
	Leading edge lights
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-14-2015
  | 
	3.00
  | 
	Riveting Fuel Tank Root Rib
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-10-2015
  | 
	2.00
  | 
	Last Night Work Revisited
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-09-2015
  | 
	3.00
  | 
	Fuel cap
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-07-2015
  | 
	1.00
  | 
	Fuel tank inspection
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-06-2015
  | 
	3.00
  | 
	Introducing Proseal
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-05-2015
  | 
	2.00
  | 
	Right Fuel Tank Root Rib
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-03-2015
  | 
	3.00
  | 
	Leading edge
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-02-2015
  | 
	2.00
  | 
	Riveting leading edge
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-01-2015
  | 
	3.00
  | 
	Leading Edge Riveting
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-31-2015
  | 
	6.00
  | 
	Landing light
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-30-2015
  | 
	6.50
  | 
	Riveted Right leading edge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-29-2015
  | 
	3.50
  | 
	Leading Edge dimpling
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-28-2015
  | 
	2.50
  | 
	Tank skin countersinks and vent line
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-27-2015
  | 
	3.00
  | 
	Dimpling the Right fuel tank
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-26-2015
  | 
	2.50
  | 
	Finish prepping the LE and FT
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-25-2015
  | 
	6.00
  | 
	Leading Edge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-25-2015
  | 
	1.00
  | 
	Fuel Tank deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-24-2015
  | 
	6.00
  | 
	Fuel Tank
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-23-2015
  | 
	2.00
  | 
	Z-brackets and fuel tank baffle
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-23-2015
  | 
	2.00
  | 
	Fuel tank deburring
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-23-2015
  | 
	6.00
  | 
	Fuel Tank
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-22-2015
  | 
	6.00
  | 
	Z-brackets
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-16-2015
  | 
	3.00
  | 
	Fuel pick up and brackets
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-16-2015
  | 
	0.50
  | 
	Fuel drain
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-15-2015
  | 
	5.00
  | 
	R Fuel Tank
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-14-2015
  | 
	3.00
  | 
	Leading edge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-13-2015
  | 
	1.00
  | 
	Re-hung the Right wing
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-10-2015
  | 
	3.00
  | 
	Main spar countersinking
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-10-2015
  | 
	2.00
  | 
	Leading edge ribs adjustment
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-09-2015
  | 
	4.00
  | 
	Drilled RW bottom skin
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-08-2015
  | 
	2.00
  | 
	Drilled RW Top skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-07-2015
  | 
	1.50
  | 
	Tank joint plate
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-06-2015
  | 
	1.50
  | 
	Leading Edge fitting
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-05-2015
  | 
	2.00
  | 
	Hung the Right wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-04-2015
  | 
	1.50
  | 
	Finished Right main rib riveting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-03-2015
  | 
	1.50
  | 
	Riveting Right main ribs
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-02-2015
  | 
	3.00
  | 
	LE Ribs and Right Main spar retouching
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-01-2015
  | 
	6.00
  | 
	R Wing Rib priming
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-30-2015
  | 
	0.50
  | 
	Prepping for priming
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-29-2015
  | 
	2.00
  | 
	Drilled main ribs to spars
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-28-2015
  | 
	1.00
  | 
	Adjusted main ribs
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-19-2015
  | 
	0.00
  | 
	New shop lights
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-15-2015
  | 
	1.00
  | 
	Drilled holes for the right wing conduit
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-14-2015
  | 
	2.50
  | 
	Wing main ribs and leading edge
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-13-2015
  | 
	2.00
  | 
	Main rib deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-12-2015
  | 
	1.50
  | 
	Main rib deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-11-2015
  | 
	1.50
  | 
	Main rib deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-10-2015
  | 
	0.50
  | 
	Leading edge rib deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-09-2015
  | 
	1.00
  | 
	Right wing ribs deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-08-2015
  | 
	0.50
  | 
	Right wing ribs deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-06-2015
  | 
	0.50
  | 
	Right wing ribs deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-05-2015
  | 
	1.20
  | 
	Right wing ribs deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-04-2015
  | 
	1.00
  | 
	Right wing ribs deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-03-2015
  | 
	1.00
  | 
	Right wing ribs deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-07-2015
  | 
	3.00
  | 
	Moving project
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-30-2014
  | 
	0.00
  | 
	New workshop
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-30-2014
  | 
	0.00
  | 
	Got the garage floor coated
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-17-2014
  | 
	1.50
  | 
	Primed the pitot mast and mounting hardware
  | 
	
		 | 
	
	          | 
 
	
  | 
	
	
	 11-23-2014
  | 
	2.00
  | 
	Wing stand modification
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-20-2014
  | 
	1.00
  | 
	Securing pitot tubes to bell crank
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-19-2014
  | 
	2.00
  | 
	Pitot pluming
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-06-2014
  | 
	3.00
  | 
	Pitot tube forming clamps
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-01-2014
  | 
	3.00
  | 
	Pitot plumbing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-22-2014
  | 
	2.00
  | 
	Finished flap locking mechanism
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-21-2014
  | 
	2.00
  | 
	Started constructing locking mechanism for flap hi
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-17-2014
  | 
	2.00
  | 
	Primed pitot mast hardware and mounted control box
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-16-2014
  | 
	1.50
  | 
	Riveted control box nutplates to the wing rib
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-14-2014
  | 
	1.00
  | 
	Made and mounted aileron stop out of delrin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-12-2014
  | 
	1.00
  | 
	Pitot tubes and control box
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-04-2014
  | 
	0.00
  | 
	Pulling Engine
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-02-2014
  | 
	2.50
  | 
	Match drilled the flap to the wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-29-2014
  | 
	1.00
  | 
	Left bell crank.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-20-2014
  | 
	2.00
  | 
	Riveted the left flap
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-17-2014
  | 
	2.00
  | 
	Assembled the right aileron
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-17-2014
  | 
	1.00
  | 
	Assembled the left flap
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-14-2014
  | 
	4.00
  | 
	Primed the right aileron parts
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-12-2014
  | 
	1.50
  | 
	Match drilled the right aileron
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-09-2014
  | 
	1.50
  | 
	Spacer for the leading edge/tank interface
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-08-2014
  | 
	1.50
  | 
	Fuel tank fitting
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-06-2014
  | 
	2.00
  | 
	Finished the right aileron
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-04-2014
  | 
	1.50
  | 
	Final assembly of right aileron.
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-30-2014
  | 
	2.50
  | 
	Match drilling the left aileron skin and ribs
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-24-2014
  | 
	2.00
  | 
	Starting match drilling the left aileron spar
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-22-2014
  | 
	2.50
  | 
	Finishing reverting the flap
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-21-2014
  | 
	2.00
  | 
	Flap riveting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-20-2014
  | 
	1.00
  | 
	Riveted aileron stiffeners
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-20-2014
  | 
	0.50
  | 
	Adjusted the flap skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-19-2014
  | 
	3.50
  | 
	Aileron dimpling
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-18-2014
  | 
	2.00
  | 
	Aileron stiffeners
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-17-2014
  | 
	2.50
  | 
	Right flap drilling
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-16-2014
  | 
	5.50
  | 
	Primed the aileron components
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-15-2014
  | 
	1.50
  | 
	Match drilled the right aileron stiffeners
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-14-2014
  | 
	1.00
  | 
	Removed vinyl on ailerons
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-12-2014
  | 
	2.00
  | 
	Aileron and Flap cradle
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-10-2014
  | 
	3.50
  | 
	Started deburring the right aileron components.
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-09-2014
  | 
	2.00
  | 
	Drilled the stiffeners to the aileron skin.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-08-2014
  | 
	1.50
  | 
	Countersunk the left flap nutplate
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-07-2014
  | 
	2.00
  | 
	Deburred the left aileron stiffeners
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-06-2014
  | 
	2.00
  | 
	Cut the aileron stiffeners (left/right)
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-05-2014
  | 
	2.00
  | 
	Drilled the flap hinge
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-05-2014
  | 
	1.50
  | 
	Deburred and drilled the FL-706B
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-04-2014
  | 
	2.50
  | 
	Clecoed the left flap
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-03-2014
  | 
	0.50
  | 
	Left fuel tank pressure holding
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-02-2014
  | 
	0.00
  | 
	Rv-7 demo flight with Mike
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-29-2014
  | 
	0.50
  | 
	Pressure still holding
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-25-2014
  | 
	0.00
  | 
	Pressure holding for the left fuel tank
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-24-2014
  | 
	2.50
  | 
	Started left fuel tank leak test
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-17-2014
  | 
	2.00
  | 
	Mounted and sealed the inspection cover
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-15-2014
  | 
	2.50
  | 
	Finished up the aileron brackets.
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-14-2014
  | 
	3.00
  | 
	Riveted the aileron brackets
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 07-13-2014
  | 
	6.50
  | 
	Riveted the left baffle
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-12-2014
  | 
	3.00
  | 
	Redid the aileron brackets
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 06-22-2014
  | 
	3.00
  | 
	Installed flop tube
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-17-2014
  | 
	2.00
  | 
	Test fit the flop tube
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-08-2014
  | 
	1.00
  | 
	Flop tube safety wire
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-07-2014
  | 
	1.00
  | 
	Proseal inspection
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-30-2014
  | 
	2.00
  | 
	Last rib on left fuel tank
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-11-2014
  | 
	0.00
  | 
	Solo XC !!!!!
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-11-2014
  | 
	2.00
  | 
	Drilled new holes for my spacers ala Nilberg
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-10-2014
  | 
	8.00
  | 
	Capacity plate spacers
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-09-2014
  | 
	0.00
  | 
	New mini-lathe
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-07-2014
  | 
	0.50
  | 
	Match drilled the braces to the left wing.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-05-2014
  | 
	1.50
  | 
	Flap and aileron deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-04-2014
  | 
	3.00
  | 
	Left riveted the outboard top skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-03-2014
  | 
	2.50
  | 
	Left riveted the inboard top skin
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-02-2014
  | 
	3.50
  | 
	Finished riveting the leading edge,
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-01-2014
  | 
	1.50
  | 
	Left aileron brackets
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-30-2014
  | 
	1.50
  | 
	Leading edge rivet repair
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-29-2014
  | 
	2.50
  | 
	Leading edge rivet repair
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-28-2014
  | 
	2.00
  | 
	Rivet inspection and fixing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-27-2014
  | 
	1.50
  | 
	Jigs for riveting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-26-2014
  | 
	3.00
  | 
	Left landing light
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-25-2014
  | 
	2.00
  | 
	Made jigs for the leading edge to spar riveting.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-23-2014
  | 
	2.00
  | 
	Capacitive sender plates and wiring
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-22-2014
  | 
	1.00
  | 
	More left fuel tank prep.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-21-2014
  | 
	1.50
  | 
	Proseal Inspection
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-20-2014
  | 
	2.00
  | 
	Vent line and anti-hang up
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-20-2014
  | 
	2.00
  | 
	Riveted nut plates for the inspection plate
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-20-2014
  | 
	6.00
  | 
	Primed left top skin and doubler
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-20-2014
  | 
	0.00
  | 
	Flop tube
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-19-2014
  | 
	3.50
  | 
	Left fuel tank (proseal)
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 04-18-2014
  | 
	5.50
  | 
	Left fuel tank (proseal) clecoing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-17-2014
  | 
	3.50
  | 
	Left fuel tank (proseal) clecoing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-08-2014
  | 
	1.50
  | 
	Anti-hang up device
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-07-2014
  | 
	3.00
  | 
	Fuel cap clean up, anti hang-up device
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-06-2014
  | 
	3.00
  | 
	Left fuel tank (proseal) riveting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-05-2014
  | 
	2.50
  | 
	Pivot mast opening
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-01-2014
  | 
	2.50
  | 
	Left rear spar to ribs riveting
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-31-2014
  | 
	2.50
  | 
	Anti rotation bracket
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-30-2014
  | 
	5.50
  | 
	Fuel tank flap doors, stall warning install
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-29-2014
  | 
	3.00
  | 
	Started riveting the left leading edge.
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-28-2014
  | 
	1.50
  | 
	Leading edge access door
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-27-2014
  | 
	1.50
  | 
	Left leading edge dimpling
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-22-2014
  | 
	3.00
  | 
	Vent line clips
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-21-2014
  | 
	4.50
  | 
	Leading edge skin priming
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-20-2014
  | 
	1.50
  | 
	Anti hang up device
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-19-2014
  | 
	1.00
  | 
	Flop tube fitting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-18-2014
  | 
	1.00
  | 
	Drilled the left tank tip stiffener/bracket
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-16-2014
  | 
	3.00
  | 
	Left fuel tank dimpling
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-15-2014
  | 
	2.00
  | 
	Left fuel tank skin dimpling
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-14-2014
  | 
	1.50
  | 
	Left fuel tank inspection hole
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-13-2014
  | 
	2.00
  | 
	Left fuel tank stiffener and brackets
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-12-2014
  | 
	2.00
  | 
	Fuel cap countersinking
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-11-2014
  | 
	1.50
  | 
	Fuel cap
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-10-2014
  | 
	2.00
  | 
	Fuel tank drain
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-09-2014
  | 
	6.00
  | 
	Fuel tank fitting and baffle fitting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-08-2014
  | 
	3.00
  | 
	Z-brackets, fuel tank deburring, stall warning
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-07-2014
  | 
	3.00
  | 
	Z-bracket priming
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-05-2014
  | 
	1.50
  | 
	Leading edge joint plate
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-04-2014
  | 
	2.50
  | 
	Z-brackets countersinks
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 03-03-2014
  | 
	2.00
  | 
	Z-bracket drilling
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-02-2014
  | 
	4.00
  | 
	Z-brackets for left wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-01-2014
  | 
	4.00
  | 
	Left leading edge drilling
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-28-2014
  | 
	2.00
  | 
	Rear spar clean up
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-26-2014
  | 
	2.00
  | 
	Match drilled the left bottom skin.
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-25-2014
  | 
	1.50
  | 
	Match drilled the left top skin.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-24-2014
  | 
	1.50
  | 
	Stall warning assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-19-2014
  | 
	2.00
  | 
	Wing walk doubler and skin joints
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-17-2014
  | 
	2.00
  | 
	Leading edge drilling
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-16-2014
  | 
	2.00
  | 
	Riveting Wing Ribs to Spar
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-15-2014
  | 
	3.00
  | 
	Left wing ribs to spar riveting
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-14-2014
  | 
	2.00
  | 
	Left tank rib deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-13-2014
  | 
	1.00
  | 
	Left leading edge deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-12-2014
  | 
	2.00
  | 
	Left leading edge
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-11-2014
  | 
	2.00
  | 
	Built Leading Edge Cradle.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-10-2014
  | 
	2.00
  | 
	Built Leading Edge Cradle.
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 02-09-2014
  | 
	4.00
  | 
	Left wing rib priming
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-08-2014
  | 
	5.00
  | 
	Left wing rib prepping
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-07-2014
  | 
	2.00
  | 
	Wing drilling
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-06-2014
  | 
	1.00
  | 
	Conduit
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-05-2014
  | 
	3.00
  | 
	Wing Stand
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-02-2014
  | 
	4.00
  | 
	Deburring wing ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-01-2014
  | 
	3.00
  | 
	Deburring wing ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-31-2014
  | 
	1.50
  | 
	Deburring wing ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-30-2014
  | 
	1.50
  | 
	Deburring wing ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-29-2014
  | 
	1.50
  | 
	Deburring wing ribs
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-28-2014
  | 
	2.00
  | 
	Started left wing ribs deburring
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-27-2014
  | 
	3.00
  | 
	Rear spar riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-26-2014
  | 
	2.00
  | 
	Tie-down priming
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-25-2014
  | 
	5.00
  | 
	Rear spar priming
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-24-2014
  | 
	3.00
  | 
	Started rear spars
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-22-2014
  | 
	1.00
  | 
	Wing stand hardware
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-20-2014
  | 
	2.00
  | 
	Wing stand hardware
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-19-2014
  | 
	2.00
  | 
	Wing stand hardware
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-19-2014
  | 
	3.00
  | 
	Drilled tie-down brackets to spar and countersunk 
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-18-2014
  | 
	4.00
  | 
	Built the wing hanging stand framework
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-16-2014
  | 
	1.00
  | 
	Manufactured the tie-down spacers
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-13-2014
  | 
	2.00
  | 
	Nutplates on right spar
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 01-12-2014
  | 
	4.00
  | 
	Installed nutplates
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-10-2014
  | 
	2.00
  | 
	Constructed Rib straitening device
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-29-2013
  | 
	2.00
  | 
	Workshop clean-up
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-26-2013
  | 
	2.00
  | 
	Inventory of wing kit finished
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-24-2013
  | 
	2.00
  | 
	Inventory of wing kit
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-22-2013
  | 
	2.00
  | 
	Inventory of wing kit
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-20-2013
  | 
	1.00
  | 
	Wing Kit Arrived
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-15-2013
  | 
	4.00
  | 
	Riveted the trim tab
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-10-2013
  | 
	3.00
  | 
	Primed trim tab parts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-07-2013
  | 
	2.00
  | 
	Drilled the trim tab hinge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-07-2013
  | 
	3.00
  | 
	Bent the trim tab tabs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-05-2013
  | 
	3.00
  | 
	Bent the Left Elevator Tabs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-02-2013
  | 
	3.00
  | 
	Riveted the Left Elevator skeleton
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 12-01-2013
  | 
	3.00
  | 
	Left Elevator Skeleton priming
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-30-2013
  | 
	3.00
  | 
	Back Riveting Left Elevator II
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-28-2013
  | 
	3.00
  | 
	Left Elevator II
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-11-2013
  | 
	2.00
  | 
	Left side stiffeners
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-10-2013
  | 
	3.00
  | 
	Trailing edge forming
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-10-2013
  | 
	4.00
  | 
	Right elevator riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-09-2013
  | 
	3.00
  | 
	Right elevator priming
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-08-2013
  | 
	3.00
  | 
	Trim reinforcement plate
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-07-2013
  | 
	4.00
  | 
	Right elevator assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-06-2013
  | 
	3.00
  | 
	Elevator stiffeners
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-02-2013
  | 
	3.00
  | 
	Vertical Stabilizer Spar riveting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-02-2013
  | 
	2.00
  | 
	Rudder trailing edge riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-02-2013
  | 
	2.00
  | 
	Rudder trailing edge clean up
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-02-2013
  | 
	3.00
  | 
	Rudder Leading Edge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-01-2013
  | 
	4.00
  | 
	Horizontal Stabilizer final riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-31-2013
  | 
	6.00
  | 
	Left Horizontal Stabilizer
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-30-2013
  | 
	1.00
  | 
	Tool testing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-30-2013
  | 
	2.00
  | 
	Rudder proseal
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-29-2013
  | 
	4.00
  | 
	Riveted the other side of the rudder
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-28-2013
  | 
	4.00
  | 
	Rudder riveting
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-27-2013
  | 
	1.00
  | 
	Trailing edge prep
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-27-2013
  | 
	4.00
  | 
	Rudder skin riveting
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-26-2013
  | 
	4.00
  | 
	Riveted the counterbalance.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-26-2013
  | 
	6.00
  | 
	Counterbalance
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-25-2013
  | 
	3.00
  | 
	Rudder
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-24-2013
  | 
	3.00
  | 
	Riveting rudder skeleton
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-21-2013
  | 
	2.00
  | 
	Rudder skin clearance
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-21-2013
  | 
	0.00
  | 
	Received shipping date for wing kit
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-20-2013
  | 
	8.00
  | 
	Deburred and dimpled Rudder
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-19-2013
  | 
	5.00
  | 
	Rudder riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-18-2013
  | 
	8.00
  | 
	Vertical Stabilizer Riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-16-2013
  | 
	4.00
  | 
	Horizontal Stabilizer Revering continues
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-15-2013
  | 
	3.00
  | 
	Horizontal Stabilizer riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-14-2013
  | 
	2.00
  | 
	Preparing for Horizontal Stabilizer riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-13-2013
  | 
	4.00
  | 
	Rudder spar
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-12-2013
  | 
	3.00
  | 
	Rudder stiffener match drilling
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-10-2013
  | 
	3.00
  | 
	Vertical Stabilizer Skeleton and Rudder stiffeners
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-09-2013
  | 
	3.00
  | 
	Rudder stiffeners
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-08-2013
  | 
	0.00
  | 
	Ordered the wing kit
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-08-2013
  | 
	3.00
  | 
	Horizontal Stabilizer Rear Spar riveted
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-06-2013
  | 
	8.00
  | 
	Vertical Stabilizer Spar and Skeleton riveted
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-05-2013
  | 
	4.00
  | 
	Priming
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-04-2013
  | 
	8.00
  | 
	Prepping for priming
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-02-2013
  | 
	4.00
  | 
	Vertical Stabilizer Spar and Skin
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-01-2013
  | 
	3.00
  | 
	Vertical Stabilizer deburring
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-29-2013
  | 
	4.00
  | 
	Stewarts Systems testing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-29-2013
  | 
	3.00
  | 
	Drilled VS
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-20-2013
  | 
	3.00
  | 
	Drilled Horizontal Stabilizer ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-20-2013
  | 
	3.00
  | 
	Deburring Horizontal Stabilizer Skins
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-19-2013
  | 
	3.00
  | 
	Marked Horizontal Stabilizer ribs for drilling
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-18-2013
  | 
	4.00
  | 
	Forming Horizontal Stabilizer ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-15-2013
  | 
	2.00
  | 
	Preparing HS-404 Ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-15-2013
  | 
	1.00
  | 
	Bending HS-710 and HS-714
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-14-2013
  | 
	2.00
  | 
	Horizontal Stabilizer Rear Spar Assembly
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 09-14-2013
  | 
	3.00
  | 
	FS Front Spar Assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 09-12-2013
  | 
	2.00
  | 
	HS-603PP
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-30-2013
  | 
	4.00
  | 
	DRDT-2 Dimple Table and workbench
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-29-2013
  | 
	3.00
  | 
	Finishing Toolbox
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-28-2013
  | 
	3.00
  | 
	Riveting practice (Toolbox)
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-25-2013
  | 
	7.00
  | 
	Construction of workbench
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-20-2013
  | 
	2.00
  | 
	Remaining empennage arrived
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-19-2013
  | 
	1.00
  | 
	Empennage Partially Received
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-18-2013
  | 
	1.00
  | 
	Table for dimpler
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-15-2013
  | 
	0.00
  | 
	Ordered Empennage
  | 
	
			Details 
		 | 
	
	          |