KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Some assembly required
' style=
Date:  5-21-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Started longeron drilling

Started the longeron drilling started from the aft portion. I am surprised how well the longeron is following the side skin, just a little push is enough for perfect alignment.
' style=

Longeron drilling

Longeron drilling

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.