KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Some assembly required
' style=
Date:  7-20-2015
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Baffle inspection

Inspected last night baffle install via the inspection opening.. Nicely formed proseal beads.
' style=

Beads at the inboard rib

Beads at the inboard rib

' style=

Bead around the drainage areas

Bead around the drainage areas

' style=

Upper skin beads

Upper skin beads

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.