KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Some assembly required
' style=
Date:  7-15-2017
Number of Hours:  4.00
Manual Reference:  
Brief Description:  New front decks

Drilled out the rivets for the front decks to prep for the new set. It was easy to remove them without causing damage due to the thick material and that the old decks are scrap.
Measured for the trimming of the new set and drilled them to the longerons.
' style=

Drilled in place

Drilled in place

' style=

Left deck

Left deck

' style=

Right deck

Right deck

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.