KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Some assembly required
' style=
Date:  6-5-2018
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Upper rudder fairing

I had previously added layers of fiberglass cloth to the upper rudder fairing. That created the right base, but the edges was basically following the underlying shape. As I did with the elevator faring, I added flox to build a little more defined edge.
' style=

Final build-up

Final build-up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.