KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Some assembly required
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-16-2018
Number of Hours:  2.00
Manual Reference:  
Brief Description:  FiberFrax fitting

I used the Titanium sheets to trim the FiberFrax and also marked the holes. I then used punches to  make the holes. It only required slight hand pressure to push through the material.



The large holes were cut out using a sharp knife.
' style=

FiberFrax trimming and punching

FiberFrax trimming and punching

' style=

FiberFrax and Titanium on FW

FiberFrax and Titanium on FW

' style=

Cutting out cable penetrations

Cutting out cable penetrations

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.