KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Some assembly required
' style=
Date:  6-17-2018
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Fairing finishing

Sanded all the fairings and gave the bottom rudder some primer to check the finish. There are still some pinholes, but to starting to take shape.
The front part need some work though. I taped up the rudder horns and added more glass. The rest of the fairings got skimmed with epoxy to take care of the pin holes.
' style=

Added more material to lower fairing

Added more material to lower fairing

' style=

Mmmm cake....

Mmmm cake....

' style=

Epoxu skimming

Epoxu skimming

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.