Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  Michael Sausen
Location:
  Shiocton, WI - USA
Aircraft:
  RV-10
Total Build Hours:
  1908
Web Site:
  http://www.mykitlog.com/msausen/

Date:  08-21-2024
Number of Hours:  80.00
Short Description:  Lot's of different things

Over the last 4 weeks, I was gone one of those, most of the work has been around fiberglass. I hate and love the stuff. On one hand it's pretty much infinitly repairable but on the other it's alwyas a lot of sanding to get a good fit and finish. So with that, I have the intake system all adjusted for final fit and have start painting them. The two tubes will be painted black on the inside and all three pieces will be the same copper color as the engine. Turns out that there was a TON of exposed weave on these tubes. I don't believe these were meant to be seconds so I'm pretty dissapointed in how much work it is to try and seal and smooth out the inside of these. It is giving me a chance to start practicing with the different materials and paint guns as it's been some time since I painted something. I can say that the current version of UV Smooth Prime as a waterborn product sucks. It takes too long to flash off for how much solids are in it and don't even try if it's a humid day. the stuuf will run if you look at it wrong. It will be interesting to see how it compares with the high build urethane primer I have.

I've also started on the main wheel pants. As is the norm, the fiberglass parts suck and the mounting instructions are impractical if you already have the engine on. Basically they want you to lift it off the gear and level it in all three axis. I just don't have the equipment to do that nor do I want to risk damage given the weight of a near complte aircraft. So I comprimised. Really the idea is to get the fore/aft of the pants as close to possible to level flight. With that in mind I measured how much deflection I have and adjusted the aft of the pants up by that 3/4". Should be close enough.

I also have done most of the finish work on the cowl and will be spraying the inside of the cowl with a white urethane. I sent the heat muffs off to Clint at vetterman to swap with the newer 90 degree offset and, once those are back and mounted, the FWF is 99% complete. Just need to do the fwd baff
Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Brad Kunkel
Zodiac CH 601 XLB
08-07
1182
Neil Rosoff
EX-3
08-06
1188
Jacob Hedberg
S-21 Outbound
08-02
26
JAMES TRAYNOR
VELOCITY- XLRG
08-02
2661
Jim Novak
RV-8
08-01
3700
Mark Johnson
RV-10
08-01
756
Keith Borgstrom
Sonex
07-25
536
Mark Santangelo
DR-107
07-25
520
Des Howson
Sling 2 Taildragger
07-23
3900
Stuart Hutchison
F1 Rocket Sport Wing VH-FLY
07-22
4276
Kevin W. Bulla
Fokker Dr1
07-12
684
Jack Clark
RV-14A
07-11
1523
Darrel Watson
H-5
07-10
954
Stephen Satava
RV-7
06-30
3079
Michael Freiherr von Maltzahn
RV-12is
06-28
533
Charles Wright
RV-8
06-09
135
Peter McBain
RV-9A
06-06
2326
Mark Jackson
RV-8
05-17
1674
Robert Lussow
RV-15
04-13
3
Robert Lussow
RV-10
04-13
2834
Robert Lussow
RV-15
04-12
1
Brian Robinson
Xenos
03-20
58
Bob Grantham
SeaRey LSX - "Spirit of Mackenzie"
03-11
2234
Joe Loxterkamp
https://eaabuilderslog.org/
02-12
30
James Chadwick
RV-7
02-01
1013
Robert Chopin
RV-8
01-19
930
Mark Spedding
COZY MK IV
01-14
3925
Chuck Bennett
Sonex-B Tri-Gear
01-10
1402
Randy Doughty
CH750 Cruzer
01-10
1001
Andrey Piskarev
Highlander
12-27
4497

Projects Uploaded: 1566
Logs Uploaded: 288855








Copyright © 2001-2026 Matronics. All Rights Reserved. Privacy Policy.