Work Logs Found: 233
Category Work Time: 663 Hours
 Date
Hours
Work Log Summary

Details

 02-09-2021
3.50
Voltage Regulator Connections
Details
       

 02-09-2021
3.50
P-Mag Electronic Ignition Wiring
Details
       

 02-02-2021
1.00
Manifold Pressure Line
Details
       

 01-20-2021
2.00
Firewall/Engine Ground
Details
       

 01-19-2021
1.00
Quadrant Cable Relocation Part 3
       

 01-19-2021
6.00
Quadrant Cable Relocation Part 2
Details
       

 01-18-2021
4.00
Quadrant Cable Relocation Part 1
Details

 01-13-2021
5.00
Rear Throttle Linkage
Details
       

 01-11-2021
5.00
Cable Mounting Bracket Fabrication Part 4
Details
       

 01-07-2021
4.00
Cable Mounting Bracket Fabrication Part 3
Details
       

 01-07-2021
3.00
Cable Mounting Bracket Fabrication Part 2
Details
       

 01-06-2021
4.50
Cable Mounting Bracket Fabrication Part 1
Details
       

 01-01-2021
1.50
Engine Control Cable Relocation Part 3
Details
     

 12-31-2020
1.00
Engine Control Cable Relocation Part 2
Details
     

 12-27-2020
5.00
Engine Control Cable Relocation Part 1
Details
     

 12-17-2020
3.00
Altlernator Regulator Preliminary Wiring,
Details
     

 12-07-2020
2.50
GPS Shelf Work
Details
       

 12-05-2020
3.00
Alternator "B" Leads Made
Details
       

 11-07-2020
6.00
Heat Valve, Mixture Bracke, Prop Gov Bracket
Details

 07-28-2020
1.50
Vetterman Exhaust System Installation Part 4
       

 07-28-2020
1.50
Vetterman Exhaust System Installation Part 3
Details
       

 07-28-2020
3.00
Vetterman Exhaust System Installation Part 2
Details
       

 07-28-2020
3.00
Vetterman Exhaust System Installation Part 1
Details
       

 06-17-2020
3.50
Canopy Bow, Seat Back Support Final Install
Details
       

 06-15-2020
3.00
Fabricate Tank Attach Brackets
Details
       

 06-11-2020
6.00
Fairings
Details
       

 06-10-2020
0.00
Powder Coated Canopy Parts.
Details
     

 06-09-2020
2.00
Mounting the Engine Part 2
       

 06-09-2020
2.00
Mounting the Engine Part 1
Details
       

 06-08-2020
2.00
Touch up paint, canopy rails, seat back support
Details
       

 06-08-2020
1.00
Engine mounts, engine hanging preparation
Details
       

 06-07-2020
2.00
Firewall Pass Thru Locations Part 4
Details
     

 06-06-2020
0.50
Firewall Pass Thru Locations Part 3
       

 06-06-2020
1.50
Firewall Pass Thru Locations Part 2
Details
       

 06-06-2020
1.00
Firewall Pass Thru Locations Part 1
Details
       

 06-05-2020
1.50
Stainless Steel Heat Valve
Details

 06-04-2020
3.00
Landing Gear Wheel Brakes.
Details
       

 02-10-2020
1.00
The Engine finally arrives
Details
       

 02-09-2020
3.00
Adding air vent ducting flanges.
       

 01-09-2020
3.00
Nav/Strobe Lights and Pitot Heat Part 2
Details
       

 01-09-2020
2.00
Nav/Strobe Lights and Pitot Heat Part 1
Details
       

 01-08-2020
5.00
Wiring the Taxi Light and Pitot Heat system.
Details
       

 01-05-2020
2.00
Landing Light electrical connections.
Details
       

 01-04-2020
3.00
Installing and wiring front communication jacks.
Details
       

 05-15-2018
1.00
Installling canopy retainer block
       

 05-03-2018
2.00
Bending the canopy frame to fit.
       

 05-03-2018
1.00
Bending the canopy frame part 2
       

 05-02-2018
2.50
Canopy slider cap and rear harness mounts.
Details
       

 05-02-2018
2.50
Canopy Frame and Canopy Side Rails.
Details
       

 05-01-2018
3.00
Aft Fuselage Top Skin, Rear Canopy Slide Rail.
Details
     

 04-30-2018
4.00
Canopy Bow and Canopy Slide Cap.
Details
     

 04-21-2018
3.00
Assemble the canopy slide rail.

 04-18-2018
3.50
Riveting the Aft Fuselage Top Skin
Details
       

 01-19-2018
4.00
Finishing the avionics shelves.
Details
       

 01-18-2018
1.00
Fabricate a second avionics shelf.
Details
     

 12-14-2017
2.50
Fabricating the second avionics shelf.
Details
       

 12-08-2017
3.50
Fabricating the avionics shelf.
Details
       

 12-01-2017
4.00
Fabricate avionics shelf for Transponder, GAD-29
Details
       

 11-24-2017
3.50
Fabricate a mounting shelf for the GMU-11
Details
       

 11-13-2017
6.00
Avionics access door Part 4
Details
       

 11-13-2017
2.00
Avionics access door Part 3
Details
       

 11-12-2017
2.00
Avionics access door Part 2
Details
       

 11-12-2017
6.00
Avionics access door Part 1
Details
       

 11-11-2017
1.00
Forward Baggage Door Lock
Details
       

 11-03-2017
2.50
Installed Garmin GSA28 elevator pitch servo
Details
       

 11-02-2017
1.00
Installed Garmin GSA28 Roll Servo
     

 11-01-2017
4.00
Mounting the ELT Bracket.
       

 10-31-2017
1.00
ELT Mounting Bracket
Details
     

 10-26-2017
1.50
Final riveting of the forward baggage door Part 2
Details
       

 10-26-2017
2.00
Final riveting of the forward baggage door Part 1.
       

 10-25-2017
3.50
Baggage Door prep for rivets.
Details
     

 10-24-2017
0.50
Fabricate a shim for the forward baggage door.
Details
     

 10-20-2017
3.00
Assemble the Forward Baggage Door.
       

 10-19-2017
2.00
Installed the Brake Reservoir to Master cylinder L
Details
       

 10-19-2017
2.00
Forward upper skin dimpling/countersink understruc
Details
       

 10-18-2017
0.50
Build Brake Reservoir Line Fittings.
Details
     

 10-12-2017
3.50
Prepare the forwad upper fuselage skin
Details
       

 10-11-2017
2.00
Install the instrument panel.
Details
       

 10-04-2017
0.50
Fabricate the fuel pump to firewall/engine line.
Details
     

 10-03-2017
5.00
Fabricating fuel valve fuel lines
       

 10-02-2017
5.00
Fabricating fuel vent lines and fuel supply line.
Details
       

 10-01-2017
8.00
Fuel filter and fuel pump mounting
Details
       

 09-23-2017
4.00
Fabricated the Left Brake Line
Details
       

 09-22-2017
4.00
Fabricate right brake line.
Details
       

 06-01-2017
3.00
Rear Rudder Pedal installation
Details
       

 05-31-2017
3.50
final instal rudder pedals
Details
       

 05-24-2017
2.00
Static system and tail light.
Details
       

 05-23-2017
1.00
Pitot Static Ports installation.
Details
       

 05-22-2017
1.00
Cut the plywood backboards
Details
     

 05-09-2017
1.50
Trimming, match drilling rudder cable fairings.
Details
       

 05-09-2017
1.50
Bulhead Gussets and tie down ring retainer.
Details
       

 05-04-2017
1.50
Rear baggage bulkhead, Canopy Rail Receptacle.
Details
       

 05-04-2017
2.00
Attach the 4 aft bulkheads
Details
       

 05-03-2017
1.00
Flap actuator and flap motor assembly
Details

 05-02-2017
4.00
Perpared the Instrument Panel Assembly.
Details
       

 04-28-2017
2.00
Instrument Panel and Sub Panels attach prep.
Details
       

 04-24-2017
3.00
Seat floor assembly.
Details
       

 04-19-2017
5.50
Seat floor and footwell assembly.
Details
       

 04-17-2017
6.00
Interior Paint
Details

 04-12-2017
6.00
Interior Fuselage Paint
Details

 04-11-2017
8.00
Fuselage prep for interior paint.
Details

 04-05-2017
1.00
Aft fuselage turtledeck.
Details

 04-04-2017
2.00
Removing the horizontal and vertical stabilizers.
Details

 04-03-2017
1.00
Rear Throttle Quadrant
Details
     

 04-02-2017
3.00
Firewall rotissierie mount
Details
     

 03-27-2017
4.00
Service Bulletin 16-12-16
Details
       

 03-10-2017
4.00
Fuel Valve Instalation
       

 03-05-2017
2.00
Right Armrest and Console
Details
       

 03-04-2017
6.00
Right side armrest and console
       

 02-14-2017
4.00
Modified Armrest and Throttle Quadrant Part 5
Details
     

 02-09-2017
0.00
Finish Kit Arrives
Details
     

 01-17-2017
4.00
Modified armrest and throttle quadrant Part 4
Details
       

 01-17-2017
4.00
Modified armrest and throttle quadrant Part 4
Details
       

 01-17-2017
4.00
Modified armrest and throttle quadrant Part 3
Details
       

 01-16-2017
3.00
Modified armrest and throttle quadrant Part 2
Details
       

 01-10-2017
6.00
Modified armrest and throttle quadrant Part 1
Details
       

 01-03-2017
5.00
Rudder Pedals and Control Cables Part 2
Details
       

 12-22-2016
4.00
Rudder Pedals and Control Cables.
Details
       

 12-16-2016
0.00
Grove Landing Gear Arrives
     

 10-29-2016
3.00
Seat ramps and ribs.
Details
       

 10-29-2016
2.00
RV-8 gear tower modification Part 2
Details
       

 10-29-2016
2.00
RV-8 gear tower modification Part 1
Details
       

 10-28-2016
2.50
Mid cabin covers.
Details

 10-25-2016
3.00
Bagage compartment floor assembly
Details
     

 10-23-2016
8.00
Seat Floor assembly.
Details
       

 10-22-2016
5.00
Assembling left and right seat floors.
Details
     

 10-18-2016
5.50
Flap bearing blocks and flap actuator weldment ins
Details
       

 10-13-2016
4.00
Floor assembly.
Details
       

 10-11-2016
4.00
Front seatback assembly
Details
       

 10-10-2016
4.00
Front seatback and hinge assembly.
Details
     

 10-05-2016
5.00
Primed and riveted the rear seatback.
Details
       

 10-04-2016
6.00
Assemble the Rear Seatback
Details
       

 04-08-2016
2.00
Landing Light Ballast Mounting Bracket.
Details
     

 04-01-2016
2.00
Duckworks Taxi Light Right Wing Part 3
Details
       

 04-01-2016
2.00
Duckworks Taxi Light Right Wing Part 2
Details
       

 04-01-2016
2.00
Duckworks Taxi Light Right Wing Part 1
Details
       

 03-24-2016
0.50
Pitot and AOA tubing Part 2
Details
       

 03-24-2016
1.00
Pitot and AOA tubing Part 1
Details
       

 02-25-2016
2.00
Duckworks Landing Light Part 5
Details
       

 02-25-2016
3.00
Duckworks Landing Light Part 4
Details
       

 02-23-2016
2.00
Duckworks Landing Light Part 3
Details
       

 02-23-2016
2.00
Duckworks Landing Light Part 2
Details
       

 02-23-2016
2.00
Duckworks Landing Light Part 1
Details
       

 02-21-2016
1.00
Mounting the Dynon Heated Pitot Controller.
Details
       

 02-11-2016
3.00
Final preparation of the outboard wing skin.
Details
       

 02-10-2016
1.00
Installing the Gretz Pitot Tube Mount Part 5
       

 02-10-2016
3.50
Finishing the flap hinge, adding aileron stop.
Details
       

 02-08-2016
1.50
Installing the Gretz Pitot Tube Mount Part 4
       

 02-07-2016
1.00
Installing the Gretz Pitot Tube Mount Part 3
Details
       

 02-06-2016
0.50
Installing the Gretz Pitot Tube Mount Part 2
Details
       

 02-06-2016
4.50
Installing the Gretz Pitot Tube Mount Part 1
Details
       

 02-05-2016
3.00
Fixing the left and right flap brace
Details
       

 02-04-2016
1.50
Mounting the right Flap.
Details
     

 12-15-2015
3.00
Installing wing conduit Part 1
Details
       

 12-13-2015
1.00
Aft outboard wing panel
Details
       

 12-12-2015
4.00
Preparing the outboard rear wing skin panel.
Details
       

 12-11-2015
4.50
Preparing the Flap Brace panels for installation.
Details
       

 12-04-2015
4.50
Preparing the Aileron Gap Fairings
Details
       

 11-06-2015
3.00
Preparing the Aileron Attach Brackets.
Details
       

 11-01-2015
2.00
Preparing the Flap Brace and Aileron Gap Fairings.
Details
       

 10-31-2015
2.00
Installing the Aileron Brackets Part 3
Details
       

 10-29-2015
3.00
Installing the Aileron Brackets part 2
Details
       

 10-29-2015
6.00
Installing the Aileron Brackets part 1
Details
       

 10-28-2015
3.00
Preparing the Aileron Brackets
Details
       

 10-07-2015
1.50
Preparing the aileron pushrods part 2
Details
       

 10-07-2015
3.00
Preparing the Aileron Pushrods part 1
Details
       

 10-01-2015
0.50
Finishing the elevators 3
Details
       

 10-01-2015
1.00
Finishing the Elevators 2
Details
       

 10-01-2015
2.00
Finishing the Elevators 1
Details
       

 09-29-2015
3.50
Rolling the elevator leading edges.
Details
       

 09-23-2015
6.00
Riveting the elevator skins and finishing the trim
Details
       

 06-12-2015
3.50
Riveting the right and left elevator understructur
Details
       

 06-09-2015
3.00
Built the wing dolly
Details
       

 06-08-2015
2.00
Preparing all the elevator parts and Priming
Details
       

 06-02-2015
2.00
Building The Elevator Trim Tab
Details

 06-01-2015
2.00
Building the Elevator Trim Tab
Details
       

 05-26-2015
2.00
Bending the left elevator tabs
Details
       

 04-29-2015
3.00
Preparing the elevator
Details

 04-28-2015
4.00
Preparing the left elevator
Details
       

 04-27-2015
1.00
Preparing the left Elevator.
Details
       

 04-21-2015
4.00
Preparing the Right Elevator
Details
       

 04-14-2015
6.00
Preparing the elevator
Details
       

 04-13-2015
1.00
Preparing the elevator skins
Details
       

 04-09-2015
3.50
Preparing the elevator skin and stiffeners.
Details
       

 04-08-2015
3.00
Trimming the elevator stiffeners.
Details
       

 04-07-2015
3.00
Bending the leading edge of the rudder
Details
       

 03-31-2015
2.00
Finish riveting the rudder.
Details
     

 03-26-2015
2.00
Riveting the rudder.
Details
       

 03-25-2015
3.00
Finish riveting the rudder skeleton.
Details
       

 03-24-2015
2.00
Clecoing, and riveting together the rudder.
Details
       

 03-19-2015
1.00
Match drilling rudder understructure.
Details
       

 03-19-2015
2.00
Match drilling rudder skin to understructure.
Details
       

 03-19-2015
3.00
Deburring, edge finishing and dimpling.
Details
       

 03-18-2015
2.00
More riveting rudder stiffeners
Details
       

 03-17-2015
2.00
Trailing edge bender, riveting the stiffeners.
Details
       

 03-12-2015
4.00
Dimpling and priming rudder skin and stiffeners.
Details
       

 03-10-2015
2.00
Assembling more rudder parts.
Details
       

 03-09-2015
1.50
Assembling parts of the rudder.
Details
     

 03-08-2015
2.00
Preparing rudder skin for dimpling.
Details
     

 03-06-2015
2.00
Match drilling stiffeners to rudder skin.
Details
       

 02-26-2015
2.00
Preparing Rudder Stiffeners.
Details
       

 02-25-2015
5.00
Finishing the Vertical Stabilizer
Details
       

 02-22-2015
2.00
Finishing the HS, starting the VS
Details
       

 02-21-2015
1.00
Assembling the Vertical Stabilizer
Details
     

 02-16-2015
1.00
Riveting underside or HS skin
Details

 02-12-2015
3.00
Riveting the rear spar, inboard and outboard ribs
Details
       

 02-11-2015
3.00
More riveting or the HS
Details
     

 02-07-2015
3.00
Riveting the right HS together.
Details
       

 02-07-2015
1.00
HS stand
Details
     

 02-06-2015
3.00
Riveting the right HS
Details
       

 02-06-2015
3.00
Riveting left HS together
Details
       

 02-02-2015
2.00
Riveting the VS together.
Details
       

 01-22-2015
3.50
Left forward middle rib riveted to the upper skin
Details
       

 01-14-2015
0.50
Attaching left inboard ribs to the forward spar.
Details
       

 01-13-2015
5.00
Riveting rear and forward spar assemblies.
Details
       

 01-08-2015
2.00
Washed and primed VS and HS skins.
Details

 12-28-2014
3.00
Wash and primed all VS and HS parts.
Details
       

 12-17-2014
3.50
Deburring, edge finishing, dimpling the VS parts.
Details
       

 12-10-2014
3.00
Match drilling VS skin with understructure.
Details
     

 12-09-2014
1.00
Match drill vertical stabilize assembly.
Details
       

 12-08-2014
0.50
Assembly of the VS skeleton
Details
       

 12-07-2014
3.50
Dimpling HS skins. ribs and spars.
Details
       

 12-06-2014
3.00
Building a Tool Box for practice riveting
Details
       

 12-05-2014
2.50
More deburring.
Details

 12-04-2014
5.00
More deburring parts.
Details
       

 12-02-2014
6.00
Starting construction of the right horizontal stab
Details
       

 11-28-2014
3.00
Match drill holes common to inboar ribs and spars
Details
       

 11-03-2014
1.00
Preparing the HS ribs for assembly
Details
       

 11-03-2014
5.00
Constructing the framework for the left HS
Details
       

 11-01-2014
5.00
Assembling the forward spar components.
Details
       

 10-31-2014
3.00
Match drill stiffeners, rear spar, hinge brackets
Details
       

 10-22-2014
0.50
Prepared the rear spar reinforcement stiffeners
Details
     

 03-22-2014
8.00
Introduction to building class
Details
       