KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
Work Logs Found: 82
Category Work Time: 261 Hours
 Date
Hours
Work Log Summary

Details

 06-17-2020
3.50
Canopy Bow, Seat Back Support Final Install
Details
       

 06-15-2020
3.00
Fabricate Tank Attach Brackets
Details
       

 06-11-2020
6.00
Fairings
Details
       

 06-10-2020
0.00
Powder Coated Canopy Parts.
Details
     

 06-08-2020
2.00
Touch up paint, canopy rails, seat back support
Details
       

 06-04-2020
3.00
Landing Gear Wheel Brakes.
Details
       

 02-09-2020
3.00
Adding air vent ducting flanges.
       

 05-02-2018
2.50
Canopy slider cap and rear harness mounts.
Details
       

 05-01-2018
3.00
Aft Fuselage Top Skin, Rear Canopy Slide Rail.
Details
     

 04-30-2018
4.00
Canopy Bow and Canopy Slide Cap.
Details
     

 04-21-2018
3.00
Assemble the canopy slide rail.

 04-18-2018
3.50
Riveting the Aft Fuselage Top Skin
Details
       

 01-19-2018
4.00
Finishing the avionics shelves.
Details
       

 01-18-2018
1.00
Fabricate a second avionics shelf.
Details
     

 12-14-2017
2.50
Fabricating the second avionics shelf.
Details
       

 12-08-2017
3.50
Fabricating the avionics shelf.
Details
       

 12-01-2017
4.00
Fabricate avionics shelf for Transponder, GAD-29
Details
       

 11-24-2017
3.50
Fabricate a mounting shelf for the GMU-11
Details
       

 11-13-2017
6.00
Avionics access door Part 4
Details
       

 11-13-2017
2.00
Avionics access door Part 3
Details
       

 11-12-2017
2.00
Avionics access door Part 2
Details
       

 11-12-2017
6.00
Avionics access door Part 1
Details
       

 11-11-2017
1.00
Forward Baggage Door Lock
Details
       

 11-03-2017
2.50
Installed Garmin GSA28 elevator pitch servo
Details
       

 11-01-2017
4.00
Mounting the ELT Bracket.
       

 10-31-2017
1.00
ELT Mounting Bracket
Details
     

 10-26-2017
1.50
Final riveting of the forward baggage door Part 2
Details
       

 10-26-2017
2.00
Final riveting of the forward baggage door Part 1.
       

 10-25-2017
3.50
Baggage Door prep for rivets.
Details
     

 10-24-2017
0.50
Fabricate a shim for the forward baggage door.
Details
     

 10-20-2017
3.00
Assemble the Forward Baggage Door.
       

 10-19-2017
2.00
Forward upper skin dimpling/countersink understruc
Details
       

 10-12-2017
3.50
Prepare the forwad upper fuselage skin
Details
       

 10-11-2017
2.00
Install the instrument panel.
Details
       

 06-01-2017
3.00
Rear Rudder Pedal installation
Details
       

 05-31-2017
3.50
final instal rudder pedals
Details
       

 05-24-2017
2.00
Static system and tail light.
Details
       

 05-23-2017
1.00
Pitot Static Ports installation.
Details
       

 05-22-2017
1.00
Cut the plywood backboards
Details
     

 05-09-2017
1.50
Trimming, match drilling rudder cable fairings.
Details
       

 05-09-2017
1.50
Bulhead Gussets and tie down ring retainer.
Details
       

 05-04-2017
1.50
Rear baggage bulkhead, Canopy Rail Receptacle.
Details
       

 05-04-2017
2.00
Attach the 4 aft bulkheads
Details
       

 05-03-2017
1.00
Flap actuator and flap motor assembly
Details

 05-02-2017
4.00
Perpared the Instrument Panel Assembly.
Details
       

 04-28-2017
2.00
Instrument Panel and Sub Panels attach prep.
Details
       

 04-24-2017
3.00
Seat floor assembly.
Details
       

 04-19-2017
5.50
Seat floor and footwell assembly.
Details
       

 04-17-2017
6.00
Interior Paint
Details

 04-12-2017
6.00
Interior Fuselage Paint
Details

 04-11-2017
8.00
Fuselage prep for interior paint.
Details

 04-05-2017
1.00
Aft fuselage turtledeck.
Details

 04-04-2017
2.00
Removing the horizontal and vertical stabilizers.
Details

 04-03-2017
1.00
Rear Throttle Quadrant
Details
     

 04-02-2017
3.00
Firewall rotissierie mount
Details
     

 03-27-2017
4.00
Service Bulletin 16-12-16
Details
       

 03-10-2017
4.00
Fuel Valve Instalation
       

 03-05-2017
2.00
Right Armrest and Console
Details
       

 03-04-2017
6.00
Right side armrest and console
       

 02-14-2017
4.00
Modified Armrest and Throttle Quadrant Part 5
Details
     

 02-09-2017
0.00
Finish Kit Arrives
Details
     

 01-17-2017
4.00
Modified armrest and throttle quadrant Part 4
Details
       

 01-17-2017
4.00
Modified armrest and throttle quadrant Part 4
Details
       

 01-17-2017
4.00
Modified armrest and throttle quadrant Part 3
Details
       

 01-16-2017
3.00
Modified armrest and throttle quadrant Part 2
Details
       

 01-10-2017
6.00
Modified armrest and throttle quadrant Part 1
Details
       

 01-03-2017
5.00
Rudder Pedals and Control Cables Part 2
Details
       

 12-22-2016
4.00
Rudder Pedals and Control Cables.
Details
       

 12-16-2016
0.00
Grove Landing Gear Arrives
     

 10-29-2016
3.00
Seat ramps and ribs.
Details
       

 10-29-2016
2.00
RV-8 gear tower modification Part 2
Details
       

 10-29-2016
2.00
RV-8 gear tower modification Part 1
Details
       

 10-28-2016
2.50
Mid cabin covers.
Details

 10-25-2016
3.00
Bagage compartment floor assembly
Details
     

 10-23-2016
8.00
Seat Floor assembly.
Details
       

 10-22-2016
5.00
Assembling left and right seat floors.
Details
     

 10-18-2016
5.50
Flap bearing blocks and flap actuator weldment ins
Details
       

 10-13-2016
4.00
Floor assembly.
Details
       

 10-11-2016
4.00
Front seatback assembly
Details
       

 10-10-2016
4.00
Front seatback and hinge assembly.
Details
     

 10-05-2016
5.00
Primed and riveted the rear seatback.
Details
       

 10-04-2016
6.00
Assemble the Rear Seatback
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.