KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
Work Logs Found: 36
Category Work Time: 86 Hours
 Date
Hours
Work Log Summary

Details

 11-02-2017
1.00
Installed Garmin GSA28 Roll Servo
     

 04-08-2016
2.00
Landing Light Ballast Mounting Bracket.
Details
     

 04-01-2016
2.00
Duckworks Taxi Light Right Wing Part 3
Details
       

 04-01-2016
2.00
Duckworks Taxi Light Right Wing Part 2
Details
       

 04-01-2016
2.00
Duckworks Taxi Light Right Wing Part 1
Details
       

 03-24-2016
0.50
Pitot and AOA tubing Part 2
Details
       

 03-24-2016
1.00
Pitot and AOA tubing Part 1
Details
       

 02-25-2016
2.00
Duckworks Landing Light Part 5
Details
       

 02-25-2016
3.00
Duckworks Landing Light Part 4
Details
       

 02-23-2016
2.00
Duckworks Landing Light Part 3
Details
       

 02-23-2016
2.00
Duckworks Landing Light Part 2
Details
       

 02-23-2016
2.00
Duckworks Landing Light Part 1
Details
       

 02-21-2016
1.00
Mounting the Dynon Heated Pitot Controller.
Details
       

 02-11-2016
3.00
Final preparation of the outboard wing skin.
Details
       

 02-10-2016
1.00
Installing the Gretz Pitot Tube Mount Part 5
       

 02-10-2016
3.50
Finishing the flap hinge, adding aileron stop.
Details
       

 02-08-2016
1.50
Installing the Gretz Pitot Tube Mount Part 4
       

 02-07-2016
1.00
Installing the Gretz Pitot Tube Mount Part 3
Details
       

 02-06-2016
0.50
Installing the Gretz Pitot Tube Mount Part 2
Details
       

 02-06-2016
4.50
Installing the Gretz Pitot Tube Mount Part 1
Details
       

 02-05-2016
3.00
Fixing the left and right flap brace
Details
       

 02-04-2016
1.50
Mounting the right Flap.
Details
     

 12-15-2015
3.00
Installing wing conduit Part 1
Details
       

 12-13-2015
1.00
Aft outboard wing panel
Details
       

 12-12-2015
4.00
Preparing the outboard rear wing skin panel.
Details
       

 12-11-2015
4.50
Preparing the Flap Brace panels for installation.
Details
       

 12-04-2015
4.50
Preparing the Aileron Gap Fairings
Details
       

 11-06-2015
3.00
Preparing the Aileron Attach Brackets.
Details
       

 11-01-2015
2.00
Preparing the Flap Brace and Aileron Gap Fairings.
Details
       

 10-31-2015
2.00
Installing the Aileron Brackets Part 3
Details
       

 10-29-2015
3.00
Installing the Aileron Brackets part 2
Details
       

 10-29-2015
6.00
Installing the Aileron Brackets part 1
Details
       

 10-28-2015
3.00
Preparing the Aileron Brackets
Details
       

 10-07-2015
1.50
Preparing the aileron pushrods part 2
Details
       

 10-07-2015
3.00
Preparing the Aileron Pushrods part 1
Details
       

 06-09-2015
3.00
Built the wing dolly
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.