KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
' style=
Date:  1-19-2021
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Quadrant Cable Relocation Part 2

Continued work with the gear tower doubler for the forward side of the gear tower. Temporarily installed and drilled a 7/8" hole for the electrical conduit. Countersink the rivet holes. Primed and painted both sides of the doubler. Reinstalled doubler and blind riveted in place. Note enough room for a bucking bar for AN rivets. Reinstalled all quadrant cable and readjusted all throw on the cables.
' style=

Quadrant cable holes relocated.inboard.

Quadrant cable holes relocated.inboard.

' style=




' style=

7/8

7/8" EMS pass thru on bottlom

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.