Powered By Kitlog Pro v2.0
Davids Web Site
RV-8
All
1-7-2021
< Previous Log Entry
Next Log Entry >
Date:
1-7-2021
Number of Hours:
4.00
Manual Reference:
Brief Description:
Cable Mounting Bracket Fabrication Part 3
Located and drilled new clevis holes in the throttle, mixture and propeller control levers. Spent hours trying to tweak the throws for all the control levers and adjust the clevises.
Clevis connection holes drilled.
Ready for final mount hole drill
Mixture bracket flipped for better adjustment.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
235
678
Avionics
1
3
Brake System
4
10
Canopy
4
6
Electrical Wiring
4
12
Elevator
18
50
Empennage
46
119
Engine
32
86
Fuel System
4
18
Fundamentals Class
1
8
Fundementals Class
1
8
Fundementals of Buil
1
8
Fuselage
82
261
Practice kit
1
3
Wings
36
86
Copyright © 2001-2024 Matronics. All Rights Reserved.