KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
58 Logs Found 
 Date
Hours
Work Log Summary

Details

 10-05-2010
8.0
Wheels and brakes installed
Details

 10-04-2010
8.5
Install gear micro switches
Details

 10-01-2010
5.0
Nose gear doors, hydraulic lines
Details
       

 09-30-2010
8.8
Repair hydraulic pump
Details
     

 09-23-2010
9.0
Permanent hardware in gear retraction system
Details
       

 09-22-2010
8.0
More gear tweaking
Details

 09-21-2010
9.0
Tweaking Gear retraction system
Details
     

 09-20-2010
8.5
Main gear cable installation
Details
       

 09-18-2010
8.5
Install nose gear closer
Details
       

 09-17-2010
10.0
Secure Hydraulic lines
Details
       

 09-16-2010
9.3
Hydraulic plumbinmg
Details
       

 09-15-2010
8.3
Hydraulic line fabrication
Details
       

 09-14-2010
8.3
Fitting Mishler's nose gear closer
Details
       

 09-13-2010
9.5
Gear socket install, relief forms for fuel dump an
Details
       

 09-12-2010
4.0
Prime nose gear leg. Install doors
Details
       

 09-10-2010
5.5
Remove nose gear leg and prepare for priming
Details
     

 07-21-2010
3.5
Install brake lines down gear leg
Details
       

 07-14-2010
5.5
Finish gear doors
Details
       

 07-13-2010
2.5
CP gear door
Details
       

 07-08-2010
4.8
Gear door fitting
Details
       

 07-06-2010
3.5
Gear doors
Details
       

 07-05-2010
6.5
Fitting gear doors
Details
       

 07-03-2010
7.8
Gear doors
Details
       

 07-02-2010
9.0
Gear doors
Details
       

 07-01-2010
8.0
Prepare main gear doors
Details
       

 10-07-2009
1.5
Install Hydraulic Pump
Details
       

 10-06-2009
4.0
Install Gear Contol system
Details
       

 10-05-2009
6.0
Install gear contol system
Details
       

 07-26-2009
2.0
Nose Gear Guides finished
Details
       

 07-25-2009
5.0
Glass in Nose Gear Guides
Details
       

 07-24-2009
7.0
Nose gear guides
Details
       

 07-23-2009
5.5
Prepare Nose Gear Guides
Details

 07-23-2009
1.5
Glassed MG bushing on firewall
Details
       

 10-30-2008
5.0
Prepare MG pulley holes
Details

 10-29-2008
8.0
Mount MG pulleys
Details
       

 09-03-2008
6.5
Cut holes for gear legs
Details
       

 08-19-2008
7.0
MG Pulley instalation
Details
       

 06-02-2008
5.5
Notch bulkheads for gear legs
Details
       

 06-02-2008
2.0
Locating position for MG pulley system
Details
       

 06-01-2008
2.0
Main Gear Knurled bushings.
Details
       

 05-31-2008
6.0
Triax MG knurled bushings / build gear sockets
Details
       

 05-30-2008
3.0
Fabricate Aluminum spacers for Main Gear
Details
       

 05-29-2008
2.5
Grind top of gear legs make shims
Details
       

 05-27-2008
8.0
Install main gear bushings
Details
       

 05-18-2008
5.0
Glass in Transverse bulkhead
Details
       

 05-17-2008
7.5
Build Transverse bulkheads
Details
     

 05-15-2008
3.0
Enlarge hole for Pilot gear leg
Details

 05-14-2008
4.0
Enlarging Pax side gear hole
Details
       

 10-06-2007
1.5
Clean up NG hinge tabs
Details

 10-05-2007
2.5
Reinforce nose gear tabs
Details
       

 10-05-2007
0.5
Cut nose gear door into 2 halves
Details
     

 10-04-2007
3.0
Install nose gear doors
Details
       

 10-04-2007
1.5
Install NG captivator
Details
       

 10-03-2007
3.0
Prepare Nose gear door
Details
     

 10-03-2007
2.0
Install overcenter linkage
Details
       

 10-02-2007
3.0
Install nose gear
Details
       

 10-02-2007
0.5
Cut canard bulkhead slot for Nose Gear
Details
     

 09-27-2007
2.5
Install MG & NG Hydraulic cylinders
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.