KitLog pro

Powered By Kitlog Pro v2.0

Brookes Web Site
' style=
Date:  9-13-2010
Number of Hours:  9.50
Manual Reference:  7.7.3
Brief Description:  Gear socket install, relief forms for fuel dump an

Tweaked main gear overcenter mechanism, trimmed area around sockets to insure freedom of movement of cables. Made sure wheels, overcenter linkage, and airplane was level. Checked tension of over center so that spring engaged overcenter with no additional force. Tacked gear sockets in with cabo/flox. Will glass in after gear is finally adjusted..

Made relief layups for the hydraulic dump valve as well as the fuel shutoff control using 3 bid.

Wet sanded nose gear leg and fork.
' style=

Sockets epoxied in

Sockets epoxied in

' style=

Dump valve relief curing

Dump valve relief curing

' style=

fuel shutoff relief curing

fuel shutoff relief curing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.